Before an activity, ask three questions: Is the equipment appropriate? 
Is its status acceptable? Can it be used as required?
A pre-use check evaluates readiness before work begins. It may include identity, service status, required settings, physical condition, and performance indicators. The exact checks depend on the equipment.
An equipment log records use, checks, maintenance, and relevant events. An instrument's history helps determine whether a problem may have affected previous work. Write actual readings and observations rather than expected values.
If a required check fails, identify the affected work and report the problem. Do not silently change the procedure or assume that a normal-looking sample makes the failure irrelevant.
For example, a cabinet airflow alarm can affect handling conditions. A pipette problem can affect transferred volumes. A centrifuge setup error can affect cell recovery. These problems require different assessments because they affect different parts of the process.
Good judgment connects the equipment condition to the possible consequence. Clear records allow that judgment to be reviewed.

Attribution: Images AI-generated using ChatGPT Modified by Emalee Mackenzie, Irvine Valley College. Licensed under CC BY-NC-SA
This page titled 2.14: Deciding Whether Equipment Is Ready was last modified on Wed, 21 Oct 2026 01:35:36 GMT and is shared under a CC BY-NC-SA 4.0 license and was authored, remixed, and/or curated by .
The book could not be loaded just now.