A performance measure is a defined way to assess how a process or plan is working. A baseline is the
starting performance used for comparison. Specify the population, what is counted, the data source, calculation, evaluation period, reviewer, and response to a concerning result. These details connect the plan’s objectives with evidence that can guide a decision.
Consider the percentage of monitored shipments with a temperature excursion. If 6 of 100 monitored shipments had an excursion, the result is 6 ÷ 100 × 100 = 6%. If 3 of 150 had an excursion the next month, the result is 2%. The percentage decreased, but the team still needs to check whether monitoring coverage and the definition of an excursion stayed consistent.
Missing records matter. Suppose the second month included 200 shipments requiring monitoring, but only 150 had usable records. The 2% figure describes those 150 shipments, not all 200. Monitoring completeness is 150 ÷ 200 × 100 = 75%. The 50 shipments with missing or unusable records remain uncertain and need the required review. If there are no usable records, an excursion percentage cannot be calculated.
A leading indicator tracks an activity or condition expected to help prevent a later problem, such as readiness checks before staff pack independently. A lagging indicator describes a result that has already occurred, such as confirmed damage after delivery. These labels depend on the outcome being studied: training completion is a completed activity, but may be used as a leading indicator of future packing performance. The relationship must be checked; completion alone does not prove an improvement.
These schedules are teaching examples. The appropriate frequency depends on the risk, workload, history, and applicable requirements. A quarterly review should not delay an urgent response. The plan should name event-based triggers as well as calendar dates.
The complaint example links reports to the shipments they concern and uses a fixed follow-up period. Reports received this month may concern earlier shipments, so simply dividing this month’s complaint count by this month’s shipment count can be misleading. A zero count also does not prove that no problems occurred.
An inspection checks an item or activity against defined requirements. An audit systematically evaluates recorded evidence against stated criteria and requires an impartial reviewer. It may examine a product, process, or management system. The reviewer need not always come from outside the organization. Monitoring follows selected conditions or results over time. These approaches answer different questions and can support one another.
During management review, leaders assess the continuing suitability and performance of the quality system and decide on actions or resources. Decisions need an owner, due date, and follow-up evidence. A product meeting its specification is also different from a process showing statistical stability over time. A target being met once does not establish sustained performance; Chapter 6 examines that distinction.
This page titled 4.7: Performance measures and review schedules was last modified on Mon, 02 Nov 2026 06:58:34 GMT and is shared under a CC BY-SA 4.0 license and was authored, remixed, and/or curated by Emalee MacKenzie.