    14.9: Change Control and Emergency Actions

    An investigation can reveal opportunities to improve, but the failure itself is not a benefit. Change control provides a structured way to assess and approve changes withoutBiotechnology Change Control and Emergency Actions.png introducing unintended risks. Evaluate effects on product quality, safety, process performance, analytical methods, validation, documents, training, and regulatory commitments.

    Assign reviewers according to the change and its risks. Manufacturing, engineering, materials, QC, QA, and regulatory staff may contribute, but not every change needs approval from every department. Define the required approvals in the quality system.

    Document the reason, proposed actions, impact assessment, supporting studies, required approvals, implementation plan, and effectiveness checks. Complete necessary studies and training at the appropriate stage. A change record should link affected specifications, procedures, equipment, and validation records.

    In an emergency, personnel should follow approved safety and response procedures, stop unsafe work, protect people, and secure equipment or material within their authority. Escalate promptly and record actions. Emergency action does not provide unrestricted authority to improvise a new manufacturing process or bypass quality release decisions.

    After the event, investigate the deviation, assess product and data effects, and determine whether a permanent change is needed. Follow change control for that permanent change and any regulatory requirements that apply.