Fit to be Tied: Retrofitting PCC Pavement with Dowel Bars
Washington State Department of Transportation
Education
Clips are not offered for this film: a public-domain mark that nothing bears out (no year, or a year no US term has left).
Not offered: its uploader or archive marks it public domain, and nothing the site holds bears that out (its record gives no year, or a year from 1978 on, which no US term has left), so where it is free is not known. Unclear is not offered. Open it at the Internet Archive.
Parts
About
Washington State Department of Transportation
Video VH-393A
Fit to be Tied: Retrofitting PCC Pavement with Dowel Bars
This video demonstrates dowel-bar retrofit and pavement grinding to provide load transfer and eliminate faults between pavement slabs. Criteria are given for bar type, spacing, position, and allowance for concrete expansion and contraction. Dowel installation is shown in some detail. The Washington project is the first large-scale retrofit project and preliminary results indicate success and life cycle cost effectiveness.
Human-made No record of this work says a model made it. What this means.