Retrofitted Load Transfer Devices
Indiana Department of Transportation
Education
Clips are not offered for this film: a public-domain mark that nothing bears out (no year, or a year no US term has left).
Not offered: its uploader or archive marks it public domain, and nothing the site holds bears that out (its record gives no year, or a year from 1978 on, which no US term has left), so where it is free is not known. Unclear is not offered. Open it at the Internet Archive.
Parts
About
Indiana Department of Transportation
Video VH-283
Retrofitted Load Transfer Devices
Repair of cracks in jointed concrete pavement is accomplished by dry-milling slots and placing epoxy-coated rebar to establish load transfer across pavement cracks. Carbide grinding is used instead of diamond saw cutting. After the short sections of rebar are placed, the slots are backfilled with a high- strength rapid-setting mortar. This technique is intended to prevent pavement faulting, restrain future lateral movement, and transfer pavement expansion and contraction to the pavement joints. It is being field tested in Indiana.
Human-made No record of this work says a model made it. What this means.