Educational26 min320×240

Drainage Pipe Placement

Pennsylvania Departmentof Transportation

Education

At the Internet Archive

Clips are not offered for this film: a public-domain mark that nothing bears out (no year, or a year no US term has left).

Not offered: its uploader or archive marks it public domain, and nothing the site holds bears that out (its record gives no year, or a year from 1978 on, which no US term has left), so where it is free is not known. Unclear is not offered. Open it at the Internet Archive.

About

Pennsylvania Departmentof Transportation

Video VH-122

Drainage Pipe Placement

This video demonstrates proper excavation, compaction and filling for pipe installation in highway drainage maintenance. Site preparation and pipe placement are shown, but the determination of proper pipe slope and grade is not. The excavation area is marked and the old pipe is removed with a backhoe; a smooth trench is created with squared sides and a firm subbase. Loose material is laid to cushion and cradle the pipe, then compacted. A classroom demonstration shows the importance of compaction to prevent pipe failure.

Human-made No record of this work says a model made it. What this means.