Atomic Venture 1961
Clips are not offered for this film: no licence or public-domain mark is recorded for it.
Low resolution (564×360): this is the archive's own copy.
Parts
About
The story of the Dresden Nuclear Power Station, the first full-scale privately financed nuclear power station.
Boiling water reactor (BWR) technology. Dual-cycle reactor. Site preparation and excavation. Foundation construction. Containment sphere construction. Vallecitos Lab develops design data. San Jose manufacturing plant prepares first fuel load. Pressure vessel design and manufacture. Control rods. Turbine/generator. Fuel loading. Criticality achieved. First power 4-15-60. Full power 180MW on 6-29-60.
Human-made No record of this work says a model made it. What this means.
- Archive
- Internet Archive, in Short films
- Licence or status
- The Internet Archive states none for this item.
- Who can watch
- The archive gives no rating. Invisible Network shows it to Teens profiles and older, judged from its collection and subjects. How films are placed