Transport of bridge
Polygoon-Profilti (producent)
Clips are not offered for this film: the Europeana does not let a page read its file (no CORS headers), so it cannot be cut in your browser.
Parts
About
A 206 meter long arch construction of the new arch bridge in Papendrecht is transported on elevator barges from Dordrecht to its destination. This is done via a large detour of 55km on the Oude Maas, because the shortest route of 2km is too narrow. Through the lift bridge at Barendrecht, the lift bridge at Spijkenisse, the Botlek Bridge, the Klap Bridge, the lift bridge over the Koningshaven and the Van Brienenoord Bridge at Rotterdam the bridge goes to Papendrecht.
Human-made No record of this work says a model made it. What this means.