Architectural Forum / The Brickbuilder, April 1930

Page 1

THE ARCHITECTURAL FORUM IN TWO PARTS PARTONE ARCHITECTURAL DESIGN APRIL 1930

Page 2

~ dual) ๐ 5 err .. vila FLEMISH ART 15 ene ET 111 [Ле EXCLUSIVE DESIGNS by RUSSWIN SEVENTEENTH CENTURY FLEMISH art has a superb and vital individuality all its own. Its authentic interpreta- tion by RUSSWIN in the exclusive Hague and Leyden designs is splendidly appropriate for every type of building, quiet homes, palatial houses set in spacious lawns, or monumental business and public structures. HAGUE RUSSWIN hardware, whether of this or any other period, adds to its exclusiveness, artistic fitness and unfailing, trouble-free, lasting service. Whether it be a sturdy, handsome door knob, a lock, a door closer, night latch, or even the ан hinges and lock for the corner cupboard. . . all will be in perfect accord if you select RUSSWIN. Consult your architect or interior decorator, when making plans, or write us for descriptive booklet covering RUSSWIN Hardware expressly made for leading periods of design. Russell & Erwin Manufacturing Company. (The USSWI American Hardware Corporation, 5 Successor) New Britain, Connecticut R ป DISTINCTIVE N HARDWARE Hardware that lasts — Base Metal of Bronze or Brass — New York, Chicago, London. > For the Architect's convenience RUSSWIN. CLODIAN Hardware is illustrated and described in LOUIS XVI Sweet's catalogue, pages С-3137: С-3216, ~ At left am exclusive RUSSWIN creation а cc ไร ค อ ั อ ั รั ค ร ั ร ค ค ณา ล

Page 3

THE ARCHITECTURAL CONTENTS PART ONE—ARCHITECTURAL DESIGN Cover Design: Interior, Chicago Civic Opera House The Editors’ Forum Chicago Civic Opera Building ARTICLES Chicago Civic Opera Building Color and Curtain, Chicago Civic Opera House Chateau D'O A Venetian Villa at San Antonio Cottages of the Cotswolds Chapel, Kent School, Kent, Conn. Beach Clubs ev d PLATE ILLUSTRATIONS Chicago Civic Opera Building Funeral Chapel at Long Beach, Cal. A Venetian Villa at San Antonio PART TWO—ARCHITECTURAL Chicago Civic Opera Building ARTICLES Structural Design of Chicago Civic Opera Building Acoustics of the Chicago Civic Opera House Stage Equipment and Lighting Electrical Installations, 20 Wacker Drive Building Mechanical Equipment, Chicago Civic Opera Building Policy and Opinion Recent Airplane Hangar Construction in Europe Housing Business Organizations for Efficient Operation Standardizing Appraisals Supervision of Construction Operations From an Oil Sketch by Chesley Bonestell Page 39 + From an Etching by Anton Schutz Frontispiece Author Page Inne Lee 491 497 Arthur H. Gilkison 531 Edmund B. Gilchrist 537 Harold Donaldson Eberlein 587 Kenneth M. Murchison — 594 Architect Раде Graham, Anderson, Probst t White 499 Hugh R. Davies 515 . William McKnight Bowman — 539 ENGINEERING AND BUSINESS Frontispiece Author Page Magnus Gundersen 595 Paul E. Sabine 599 . R. D. Berry 605 F. Loucks 608 C. 4. Frazier 610 615 ne W. Stern 616 Harry Arthur Hopf 623 John Taylor Boyd, Jr. 627 Wiljred W. Beach 631 PARKER MORSE HOOPER, A.LA., Editor KENNETH K. STOWELL, A.LA., Managing Editor ARTHUR T. NORTH, A.LA., Associate Editor Contributing Editors: Harvey Wiley Corbett; Aymar Embury 11; Charles С. Loring; Rexíord N Tue ARCHITECTURAL Forum is published monthly by Building Division, National Trade Journals, Inc., 521 Fifth Avenue, New York. H. J. Redfield, Chairman of the Board and Treasurer: How- ard Myers, President and General Manager; John Thomas Wilson, Vice-President; James A. Rice, Vice-President; C. Stanley Taylor, Vice-President; Henry J. Brown, Jr., Secretary. Y opies APRIL, 1930 wcomb; С. Stanley Taylor; Alexander В. Trowbridge ly Subscription, Payable in Advance, U. S. A., Insular Possessions and Cuba, $7.00. Canada, $8.00. Foreign Countries uarterly Reference Mailed Flat.

Page 4

150 ARCHITECTURAL ENGINEERING AND BUSINESS Part Two STRUCTURAL STEEL CREATED THE SKYSCRAPER IS WRITTEN IN STEEL THE FUTURE SrRUCTURAL STEEL is the bone and sinew of every great modern building and bridge. It lends courage to design, inspiration to imagination. Founded on steel's strength . . . confident in steel's known safety . . . expressive of steel's adaptability . . . rise the cities of the future. Equally important is the service steel must perform in the develop- ment of small structures—homes, small apartment and mercantile houses, schools and small bridges. Here also steel brings sooner occu- pancy, greater security, longer life. Structural steel eliminates shrinkage; facilitates alterations or additions. In small as well as large bridges, steel long since proved its economic and esthetic excellence. Before building anything find out what steel can do for you. The Insti- tute serves as a clearing house for technical and economic information on structural steel, and offers full and free co-operation in the use of such data to architects, engineers and all others interested. "The co-operative non-profit service organization of the structural steel industry of North America. "Through its extensive test and research program, the Institute aims to establish the full facts regard- ing steel in relation to every type of construction. The Institute's many publications, covering every phase of stecl construction, are available on request. Please address all inquiries to 200 Madison Avenue, New York City. District offices in New York, Worcester, Philadelphia, Birmingham, Cleveland, Chicago, Milwaukee, St. Louis, Topeka, Dallas and San Francisco. AMERICAN INSTITUTE OF STEEL CONSTRUCTION STEEL INS URES A FREE ENLARGEMENT OF THIS HUGH FERRISS КЕ: ERING, ON SPECIAL STOCK FOR FRAMING, WILL BE MAILED TO ARCHITECTS ON REQUEST, STRENGTH AND SECURITY

Page 5

EN | | LI ขา แล ล ร ร ธ THE CHICAGO CIVIC OPERA BUILDING GRAHAM, ANDERSON. PROBST & WHITE, ARCHITECTS The Architectural Forum

Page 6

THE ARCHITECTURAL FORUM APRIL 1930 VOLUME LII NUMBER FOUR THE STRUCTURAL DESIGN OF THE CHICAGO CIVIC OPERA BUILDING BY MAGNUS GUNDERSEN STRUC RAL ENGINEER GRAHAM, ANDERSON, PROBST & WHITE, ARCHITECTS EVERAL unusual conditions were encoun- tered in the planning and construction of the 20 Wacker Drive Building, caused by its adjacency to the Chicago River and by the inclusion of the Civic Opera and the Civic Theater. FouNDATIONS. The preparation for the founda- tion construction required the erection of a cof- ferdam along the Chicago River front extending from the Madison to the Washington Street bridge piers, which enabled the work to proceed under comparatively dry conditions. The rem- nants of old foundations and former docks caused some difficulty in excavating for a new concrete dock and river wall. The old dock wall had been pushed about 2 feet out of alignment. The new concrete dock wall will always main- tain the correct alignment. A concrete river wall about 3 feet thick e tends from about 4 feet below the river bottom at the dock line up to the top of the dock wall. This wall is interlocked with cylindrical concrete caissons orpiers which support the columns of the building. In front of this river wall, extending several feet below the water level of the Chicago River, there is a concrete dock wall 5 feet wide and 8 feet high. This dock wall was poured in lengths of about 100 feet, the joints being sealed with a soft sheet copper stop placed 4 inches in- side of the face of the wall and the joint filled with an asphaltic composition. Special precau- tions were taken to produce a very dense and watertight concrete in the river wall. А From the concrete foundation piers along the river line there was constructed a system of con- crete cantilever beams below the basement floor. These beams are interlocked with the inner rows of concrete piers and act as a series of horizontal struts which serve to transmit and distribute to the interior piers the lateral pressure of the river and impact from vessels against the dock wall. The foundation concrete caissons or piers, in general, extend to bedrock, which is about 115 feet below the street level. The columns under the auditoriums and stages are supported by piers which extend down to hardpan, which is about 60 feet below city datum. stances, existing concrete piers which were used in the former buildings on this site were utilized. In some in- New piers were carried down alongside the old ls were distributed to The piers extending 2 umn loac ate girders. le of a 1: to hardpan plers, and the c them by steel p to rock are mac those extending mix. These pr 0 concrete mix, and were made of a 1:2:4 portions у found to be the most economical because the largest pier extend- ing to bedrock is 11 feet in diameter and, if built of weaker concrete, it would be 13 feet, 3 inches in diameter. The st of the stronger con- crete is offset by the reduced amount of excava- tion and caisson lagging. The piers extending to hardpan present exactly the opposite condition, as 4 feet is the minimum diameter for digging, and that size could not be reduced by using a stronger concrete. The presence of large quanti- ties of sand and water above the rock made it necessary to use light steel sheet piling in lengths of from 15 to 30 feet instead of the usual wood lagging, which placed in lengths of about 4 уеге excess co

Page 7

ARCHITECTURAL 596 feet. The steel sheet piling was driven by hand. [he extension of the concrete river wall some + feet below the bed of the river was necessary in order to provide an effective waterseal between The danger was in the possibility of the backwash of the river and the interior of the building. the steamers undermining the wall bv scouring out the earth and causing hydrostatic pressure under the basement floor, STRUCTURAL DESIGN, The lavouts required for the auditorium and theater portions in the lower part of the building, in con- nection with the superimposed office building por- tion in the upper part, made it necessary to use steel frame construction throughout. The upper office building special structural portion was designed as a typic: with hollow tile floors and concrete fireproofing on the steel work. The association of these two distinct styles of building construction necessi- very construction іп the transition from one to the other. Frequently, column loads had to be transmitted from one lo- cation to another, which required the introduc- üon of some one hundred and twenty-one heavy tated some intricate steel girders and seventeen steel trusses. А re- arrangement in column centers to а considerable extent was made at the 23d floor, from which the columns extend upward to the 44th floor. From the 23d floor the re-located columns extend down ward to the ceiling of the auditorium, where they are supported by trusses which transmit the loads founda tions. А series of heavy steel girders is intro duced at the 7th floor of the south wing to span to columns that extend directly to the a ceiling of the wide foyer. The columns of the north wing in general are carried down to the kh floor level, which forms the cei ing of the Civic Theater, where their loads are transmitted bv trusses to columns extending down foundations. Unusually high column loads,—the maximum being 7,500,000 pounds on one founda- to the result from the necessity at times of con- al column column by means of girders or trusses. Steel slabs поп, loads on one lower centrating seve used for column bases, the largest circular weighing about 14 and having feet, 2 inches and 1314 inches thick were slab tons diameter of The design of the trusses spanning the main auditorium embraced several features unusual in building construction. One end of these trusses supports the columns for the upper 37 stories of the tower, causing a much greater load on one end than on the other. This unbalanced loading s for the condition made different types of det necessary. ‘The caused the abandonment which would have introduced hig stresses tending to develop unusual this dif- reactions involved high ЈЕ the usual riveted end h connections secondary ending in the columns, To overcome ENGINEERING оз Ú E AND BUSINES Lol 216A 2% | atr м МА Truss 10 Truss No. 10 Supporting Five Columns ficulty, it was decided to use pin and rocker shoe bearings. Five columns are supported on truss No. 10, at one end of which a compression mem ber transmits to the pin a load of 5,700,000 pounds, and another compression member trans- mits 1,200,000 pounds, together with a tension member carrying 2,300,000 pounds, The total re action at this end is 6,300,000, and the total load on this truss is 11,000,000 pounds, То take care of these extremely high stresses, а 20-inch pin was used supported in a steel casting [his truss has a comparatively short span of only 73 feet and weighs 325 tons, one of the members of which weighs 46 tons. Nos. 1 to 8 over the in auditorium have spans ranging Trusses Н | 07466 Pier 196°Y щъ ра а Scale Plan Cantilever beam ver wall: Pier 222 55 Section А-А River and Dock Walls and Interior Bracing

Page 8

April, 1930 THE ARCHITECTURAL FORUM сл Y Sf ---——-------я ocation of trusses = 7 ü ~ — ip e . У ' IN ! . ` У ' 0 X 1 Z т .. • ы [1 s ' р Е | "|| t5 b ๑ > | А . ๑ | | ° Ri Пл fls | + ERI ° Si * wm da! 9 277 ES Ч РРР: D . . 1 = IS, 5! Ši Wall of ЗА СА um A + a Si —--a abore auditorium s AMG fis)| ® с $1 5 0099-77 75) x гр хі». .=. JE | © ' . om е Фф i (8 l | Е ||. 403 Y a Gra 5) MEGA- y А ง ก ฑ์ ท ท ศา พ 2305.-410 5 š К--------------- ---.--.--......2.290/4------<--------- SÄGA ЕЕ Wacker Drive Floor; 16, 17 and 18, Third to Fourth Floor Plan Showing Location of Trusses. Trusses | and 2, Seventh to Ninth Floor; 3 and 4, Sixth to Eighth Floor; 5, 6 and 7, Fifth to Seventh Floor; 8, 41/5 to Sixth Floor; 9, Third to Fourth Floor; 10, Ninth to Eleventh Floor; 12 to 15, Fourth to Sixth Opera shops ond Storage rooms Civic Opera Auditorium ГЕН | Stage Р СМЕ Theater | Vault for, drops Longitudinal Section Through Opera House and Office Wings

Page 9

ARCHITECTURAL ENGIN EERING AND BUSINESS Part Two Cantilever Girders for the Balcony Showing the Method of Passing Top Plan 2656277 PHIL PISE А 2200. aaf ў Elevation Reaction 162000 up Them Through the Fulcrum Girder ў" ce PL МАЈА = = — ӨЕ A m т HOF wg agg Reaction ES NOK 2864644” Vor 28 did 2567614 Elevation ctional Plan at Bottom Plaster line, from 90 to 120 feet, with loads of from 3,200,000 pounds on truss No. 1 to 7,400,000 pounds on truss No. 6. The extreme size and weight of the members necessitated their erection in the field. WIND BRACING. А wind pressure of 20 pounds per square foot was used on the main building and 30 pounds per square foot on the tower for the designing of the structural steel frame. Where the top and bottom shelf connections made of wide flange I-beanis were insufficient, gusset plate rackets were used. Across the narrow width of the tower it was necessary to use these special lange wind-brace connections on the exterior and all of the interior columns from east to west. In the north and south direction it was necessary to use them only on the wall lorizontal wind-bracing diagonals made of 8 x 15 пећ bars were used at the 23rd, 13th and 7th floors, utilizing the floor beams and girders to orm the chords. Because of the necessity of providing open spaces or courts on both sides of the main auditorium, required by city ordin- ance, special bracing was needed on either side of the auditorium. The rear wall of the stage of the Civic Opera House, extending from the basement to the 13th floor, was braced with a system of vertical diagonals. A mezzanine and two balconies extend across the opera auditorium. It required much skill and ingenuity to maintain the proper sight lines and provide the necessary structural construction within the limited head- room. This necessitated the combination of canti- lever balcony girders with fulcrum girders. The cantilever could not be supported on top of the fulcrum girder and the tension member of the cantilever girder was passed through the web of exterior columns. the fulerum girder, and because of this the com- pression member of the fulcrum girder was re- inforced at these points. The compression mem- ber of the cantilever girder is in the same plane with the bottom member of the fulcrum girder, and the load is transmitted through it by means of a tie-plate. Diagonal girders used in the balconies support the fulerum girder. This materially reduces the length of the fulcrum 15 girder, which in the mezzanine balcony is 84 feet, 9 inches long. These reductions in girder length materially reduce the deflections, The illustrations for this article The Engineering News-Record, furnished by were = Girders Beams Steel Framing of the Balcony

Page 10

ACOUSTICS OF THE CHICAGO CIVIC OPERA HOUSE PAUL E. SABINE FOREWORD HEN the design of the Civic Opera House was started by the architects, one of the three primary considerations had to do with the acoustics. The tradition of the great acoustical reputation of the old Auditorium made the sub- ject important, and the best available information was studied and the foremost acoustical engineers were consulted. The defects and advantages of existing buildings were observed, and out of it all the three essentials which were kept in mind came to be (1) the proper reverberation period, (2) the absence of echo, and (3) the proper re- inforcement for the distant seats. With as general an understanding of sound re- flection as could be obtained, the section was studied to let sounds carry to distant seats and to be unechoed except for inaudible differences. The volume was checked roughly with the volume of the nearest sized auditorium available,—the Chi- cago Auditorium,—with the knowledge that ab- sorbing areas could be increased or decreased. General criticism of curved walls and ceilings as concentrating influences on sound waves caused us to use square lines, and with these general re- quirements an architectural scheme dividing the auditorium into equal bays, stepping up, was evolved. In carrying out the general purpose to insure an auditorium that should have excellent acoustical properties, the architects were guided by Ше gen- eral principles laid down by Wallace Clement Sabine, founder of the science of architectural acoustics. In order to apply these principles most effectively to the immediate problem in hand, pre- iminary plans were submitted to Paul E. Sabine of the Riverbank Laboratories, who had made previous studies of the acoustics of a number of concert halls, and the final plans were developed with the results of these studies in mind, incor- porating those features that seemed desirable for acoustical reasons, and which were not incompati- ble with other necessities of design. The de- veloped plans were then submitted to other men whose prestige was national and whose opinion was of value. The reports of all of them, now on file in the architects” office, were favorable, and the building was designed accordingly. In this connection it is a pleasure for me to acknowledge gratefully the services of Dr. Sabine, and the coóperation of Professor Dayton C. Miller of the Case School of Applied Science, Clifford M. Swan of New York, R. V. Parsons of the Johns-Manville Corporation, and Wallace Waterfall of the Celotex Company. ALFRED SHAW, For Graham, Anderson, Probst & White TH due apologies for use of a hackneyed and overworked phrase, it may be said that within the last 25 years the American public has become "acoustic conscious." Slowly but surely people generally have come to realize that good hearing conditions in an audience room are no longer the result of a combination oí happy ac- cidents, but that they may be provided for with the same assurance as are good lighting and ade- quate ventilation. As a result, the architect who plans an auditorium that turns out acoustically impossible is no longer excused as being a victim of lamentable but pardonable circumstances. Con- versely, when a new auditorium proves to be what its name implies,——a place where would-be hearers can hear,—the happy result is credited to the architect's successful planning rather than to his good luck, With this fact in mind, the architects for the new Civic Opera House, Messrs. Graham, Ander- son, Probst & White, admitted at the very outset that acoustical requirements were of primary im- portance in the design of the new Opera House. The results have proved so satisfactory alike to musicians, critics and the public generally, that it scems worth while to set forth briefly the prin- ciples that were taken into consideration in the design of this hall. The writer of this article takes credit only for the very minor part of supplying the specialized technical information called for in successful acoustic design. Credit the f for far more difficult task of applying this information to the particular problem in hand, without doing violence to the simultaneous demands of good construction and good architecture, must go to the architects. There are three main requirements in the acous- tic design of a large concert hall. First, contours should be such as to eliminate the possibility of there being undesirable reflections and concentra- tion of reflected sound. Second, contours should be such that the reflection of sound from the bounding surfaces will serve the useful purpose of reinforcing the direct sound, particularly for 599

Page 11

600 ARCHITECTURAL ENGINEERING AND BUSINESS Part Two JER Nuus = ааа И those in the rear portions of the hall, and third, the total sound absorption in the hall should be adjusted to the volume, so as to give a desirable reverberation time. The first and second require- ments are not independent. They onlv the negative and positive statements of the thi . to provide that the in- evitable re ralls and ceiling shall are perhaps namel same ections from v ther than interfere with good hearing. igently with the particular promote r In order to deal intel problem, the results of comparative studies of a g concert halls which аге icoustically satisfactory were used. Of these, the existit number of hall approximating most closely in required seat- ing capacity was the Chicago Auditorium, the former home of the Chicago Civic Opera, which has for vears held a. well deserved reputation for Moreover, a somewhat vall had been made by the writer several vears earlier, so that it served as a departure for the though not the architectural design of the new Opera House. А the two halls may therefore prove instructive. As will be noted, the plan of the Auditorium is essentially rectangular. The | extendin having good acoustic detailed study of tl useful point of acoustical comparison of two rows ol boxes, almost entirely around the main Fhe lower begins immediately floor, give the familiar "horseshoe." the first above the second tier of boxes, and as seen on line of balcony the section, this first balcony has ап extended sweep free from the overhang of the gallery above. It will be noted further that the line of the bal- conv slope is considerably lower than the sight line fact which the diminution of sound for those in the rear of the balcony, due to its passage immediately over the absorbing surface of the audience seated in front from the stage, a lessens The Chicago Auditorium Сей- ing is Elliptical in Cross Section, with Four Horizontal Planes in Longitudinal Section of them. Furthermore, there is a certain deg of useful reflection of sound to a portion of the balcony from the last of the main ceiling arches, so that this first balcony affords a large number of seats in which, through features of design, the hearing conditions are excellent. The experience of auditors in these seats is an outstanding asset of the reputation for having good acoustics which the Auditorium enjoys. The design of the main ceiling has certain acoustical virtues. Viewed in transverse section, this is а series of expanding semi-elliptical arches. This stepped design reduces the ceiling height at the front over the main floor to only 45 feet, a ance which is sufficiently small to obviate there being perceptible echo in the front seats due to reflection from the ceiling. This height increases to 65 feet at the last of the series of arches, but the oblique incidence of sound orig- inating on the stage upon this portion of the ceil- C ing surface throws the reflected sound back into the baleony where the path difference between the direct and reflected sound is sufficiently small to render the reflection an aid to hearing rather than the vertical ine serve to render the entire an annoying echo. Furthermore, breaks in the ceiling ceiling a series of limite sound is. to a large extent, diffracted diffusely rather than geometrically, as would be the case from a continuous unbroken ceiling sur- Finally, and most important of all, this effects a considerable reduction in areas from which the reflectec face arrangement the total. volume of the hall, thus decreasing the amount of the the Sabine equation is directly proportional to the volume and inversely proportional to the total absorption. The radius of the main curvature of the ceiling arches in the transverse section is ap- everberation, which according to

Page 12

April, 1930 TH ARCHITECTURAL FORUM 60 Longitudinal Section of Ше Chicago Auditorium, Showing the Distances from Various Points to the Stage proximately twice the ceiling height, giving a cur vature sufficiently slight to prevent focusing of sound reflected from the ceiling. These are the more important features of the design which con- In the light of our present knowledge of the subject, there are certaim alterations that would be in the direction of an improvement, and these will be tribute to the desired acoustical result. pointed out in our consideration of the new Opera House. As will be seen, the plan of the latter is spatu- late, a shape which gives no cross room reflection It will be noted that the side wall reflections are to the rear, with in every case a path difference between direct and reflected sound sufficiently small to produce useful rein- from the side walls. forcement. Acoustically this is a better plan than that of the old Auditorium, since the reflections гот the side walls improve the hearing condi- tions im the extreme rear seats of the main floor under the boxes. Turning to the longitudinal sec- tion, we find a series of expanding bays, with the ceiling treme stepped up at equal intervals to the ex- rear above the balcony. It noted that the slope of the proscenium is such as to re- flect sound f Ше stage upward into the second balcony, and. furthe i Steps, w ith the exce will be that the successive ce lon of the first, serve to give useful reflection into the needed rather than to the would be worse than usele yalconies where it is main floor, where it s. The result of this direction of the reflected sound to the rear is so marked that yetween the rear of the upper balcony and the stage, a distance of about 185 feet, can be carriec and conversation extreme on with remark- able ease clarity, so that the seats in the upper balcony are quite as satisfactory from the standpoint of hearing as are the seats nearer the [his effect, be it noted, is secured without g unusual architectural \rchitecturally, the natura stage. resorti > {о апу means. ceiling line is easy апа and clearly dictated by the practical struc- tural necessities of the situation to provide spaces for the heating and ventilating apparatus Floor Plan of the Chicago Auditorium, Showing the Prin- | cipal Dimensions

Page 13

REVERBERATION The prolongation of sound in a room after the source has ceased to operate is technically known as reverberation,and experience has shown that this is the most important single factor enter- ing into the acoustic properties of a room а The numerical measure of reverberation has been defined in two , either as the time required for a sound of any given average initial intensity to decrease to 1/1,000,000 of that in- tensity, or as the duration of audible sound from a sustained source of specified acoustic power, measured in terms of the threshold of audibility, to decrease to the minimum audible intensity. The first leads to the very well known equation: за whole. ARCHITECTURAL ENGINEERING AND BUSINESS Part Two The (Civic Opera: Audiomum, Showing the Horizontal Ceiling Planes of Different Levels = 05V (1) Ше in which V is the volume of the room in cubic feet, and a is its total absorbing power in square feet of perfectly absorbing surface. The second gives the equation: (2) Г. = 40083 У (9.3. ова) а If the reverberation time is too great, the оуег- lapping of successive sounds blurs the fine effects of music, and is fatal to the clear understanding of speech. If it is too small, the effect is to pro- duce dullness and loss of tone volume, objec- tionable chiefly to the performers, who experience Longitudinal Section of the Civic Opera Auditorium, Showing the Zones of Sound Reflected from the Horizontal Planes

Page 14

April, 1930 THE The Civic Opera Auditorium, Showing the Surroundings of the Stage and the Horizontal Ceiling a sense of not securing musical results commen- surate with their efforts. for the golden mean. In the present instance, rever- beration time of the Auditorium, which had been determined in the study already referred to, was taken as the most desirable value to be attained. In measuring the reverberation time an organ pipe (pitch 512 vibs. sec.) was used. The acous- tic output of this pipe was determined by measurement of the reverberation time, using it as a source of sound in the sound chamber of the Riverbank Laboratories. With this source, the reverberation in the Auditorium was measured, and from this time and the known acoustic out- jut of the pipe, the total absorbing power of the empty Auditorium was determined. The results One seeks ARCHITECTURAL FORUM 603 Ra Woo Noo Woo MCCC ก ท ท ede obtained were: Volume, estimated from plans Seats Total measured absorbing power, empty room Total computed absorbing power, seats occupied 924,000 cu. ft. 3,400 cu. ft. 16,600 units 24,400 units Time — 5 .0083 V Reverberation Ed a (9.1—log a) Empty room 2.3 seconds With capacity audience 1.48 seconds The problem then was to provide conditions that would give these same reverberation times in the new hall. The estimated volume was 842,000, with a seating capacity of 3,600. The estimated wm m То Co Plan of the Civic Opera Audi- torium, Showing the Zones of Sound Reflected from the Side Walls

Page 15

60+ ARCHITECTURAL items of absorption were: \bsorbing power of unfurnished room (walls, floor and ceiling) 3,210 units Openings and furnishings of boxes 896 units Carpets in aisles 3200 x .25 800 units Wall draperies 2500 x 40 1,000 units Upholstered chairs (3600 x 2.3) 8,250 units l'otal absorbing power 14,186 units Computing the reverberation times, using this value for a in the formula, we have, without audience 0083 x 842,020 T, = 14 186 (9.1—4.15) 2 2.44 secs. To compute the time with an audience, we sub- stitute for the 3,600 empty s ing power of with an absorbing power of 4.6, giving a total absorbir 2,400 units. s with an absorb- 2.3 per seat, 3,600 occupied seats power with ап audience of 2 For a capacity audience, then, we have, 0083 x 842,000 E =) (9:1—4.36) = 1.47 secs. The collected data for the two rooms are: Absorbing Ibsorbing Volume Seating Power Power Cempty) (occupied) \uditorium 924,000 5400 *16,600 — *24,400 Civic Opera House 842,000 3000 14,186 ###22 460 measured computed = .0083 Т (9.1 Reverberation Time 1, log a) a Inditorium Ci Opera House No audience 2.30 2.44 Capacity audience 1.48 1.47 Using the older formula = 05 V/a we have No audience Capacity audience The foregoing are the results anticipated in the hall made in the empty hall to determine how close new pon completion, careful tests were ENGINEERING BUSINE Part Two AND actual conditions approached those predicted. Us- ing a source of sound calibrated by timing the reverberation in the beration in the hall was measured, and from this sound chamber, the rever measured time the total absorbing power was computed. This measured value was 13,830 units, as compared with a computed value of 14,186 units, an agreement which is probably closer than This differen [ 2% per cent between the predicted and actual would ordinarily be expected the absorption of the unoccupied hall equal the reverberation time for the empty room, and of values of makes an percentage difference in less than 2 per cent when the seats are all filled. This difference is below what can be observed by ordinary auditory experience, and certainly well within the limits of termination, so that one may say that the actual accuracy of experimental de- reverberation is in excellent agreement with that predicted in advance of construction, Moreover, this value of the reverberation time is very close to the average of that of the existing halls studied in connection this Included in the list were with volumes ranging from 320,000 to 900,000 cubic feet and with seating capacities of between 1600 and 3400. The shapes shoe" of the older type of opera house to the concert with problem. halls varied from the “horse- rectangular form of the usual orchestral concert hall. Of the examples studied, the reverberation times 7, 20 and 1.64 seconds with an average value of 1.43 seconds. The close all lay between approximation to this value of the reverberation time of the new hall with its satisfactory acoustic properties emphasizes the paramount importance rding reverberation as a determining factor. Summarizing the results of this experience, and the studies made in connection with it, we may say first, that in designing for good acous tics, plan and section contours should be such as he ex- treme section of the area rather than to portions to give a general reflection of sound to t near the stage, and second, that the absorbing power should be adjusted to the volume, so that the reverberation time for rooms of from 300,000 to 1,000,000 cubic feet in volume will be 1.4 seconds with a tolerance of 0.2 second оп either side of this value.

Page 16

STAGE EQUIPMENT AND LIGHTING R. D. BERRY OF GRAHAM, ANDERSON, PROBST HE stage e Chicago Civic uipment provided in the new Opera House is probably the most highly developed and elaborate of any in this country, It has many unique features and is exceptionally complete and carefully considered in every detail. The stage is 120 feet in width at its widest point and 75 feet in depth, and the gridiron floor is 45 feet above the stage level l'he gridiron height is of great importance, as it governs the possible sizes of drop curtains, cy- cloramas, trees, foliage, and so forth, for outdoor scenes, The proscenium opening is 55 feet wide and 35 feet high. STAGE FLOOR AND Traps. The working stage is arranged in an unusual manner to make it ex- tremely flexible for About 6 feet back of the proscenium a steam device is provided which produces a cloud effect covering the entire proscenium opening with vapor when desired. Immediately behind this are three sec- tions of stage floor which roll away to the sides They vary in depth from 2 to 4 feet, and each section is 4 feet wide. They are of value in the various productions. & WHITE, ARCHITECTS setting of flights of stairs, individual traps, and so forth, and are controlled from below the stage. An area 40 feet deep by 50 feet wide is arranged in sections on hydraulic rams so that any portion of the stage can be raised, lowered or tilted to an rees, Each such section is 4 from a angle above 35 deg feet by feet wide and is controlled main station located on the basement mezzanine A roll-away floor can be pulled in from the side to fill in the space floor at the right of the stage. left by the lowering of any section. \ unique stor tains is provided just in front of the г » chamber for rolled drop cur- ir wall of the s This consists of a large trap 5 feet by 75 feet in width which can be above the stage and which can be raised 5 feet owered to 35 feet below the stage. It descends into a vertical vault, provided with racks for the drop curtains, which provides storage space for 2,000 drops. The vault is both fireproof and dampproof and 15 page 597 Pressure for the hydraulic system is provided by a compression tank pumping system in the sub- м жт shown in the sectional drawing on The Stage is Divided into Sections Which can be Raised or Lowered 605

Page 17

ARCHITECTURAL 606 View Back-Stage Showing Equipment basement. There are two pressure tanks, one ex- haust tank, and three 500-gallon-per-minute cen- trifugal pumps driven by 50-horsepower motors with automatic starters anc Two air compressors are pressure regulators. rovided to keep the proper air pressure in the tanks, A pressure of 125 pounds per square inch is carried throughout this system, and the lifting capacity of the largest trap is seven tons. CURTAINS. There is a hydraulically-operated steel fire curtain of 15 tons in weight, equipped with a system of double equalizing counterweights controlled from either side of the stage. It is made of special steel plates braced and trussed on the rear, which is covered with vitrified asbestos l'he curtain can be operated in 20 seconds. Immediately behind the curtain are two fast-working, hydraulizally-operated curtains which have a maximum speed of 15 feet per sec steel ond and which can be operated from a contro m at the right of the stage at any lower speed desired. One machine operates the main curtain, which is of the drape type, the other be- ing а straight-lift “act” curtain. Variable speec in the operation of these curtains is essential, anc the hydraulic machines make them noiseless. The stage rigging consists, in part, of 106 scenery pipes located on 6/4-inch centers am occupying all space not required for border lights and cycloramas. They are 70 feet long. of specia ENGINEERING AND BUSINESS Part Two construction, provided with 5-сађје suspension. The scenery pipes are of 1/4-inch extra heavy tubing, welded together and trussed. Each pipe ad with nine special batten clamps of the type, and all arbor arranged for 1 ton of counterweight over the pipe balance. The g al channel iron bolted to the steel structure on the right stage wall. All cable is flexible, 34 inch in diam eter. One feature of this equipment is the mount- ing of all sheaves on the ceiling of the gridiron floor, 1 isa self-locking frames are ides are of speci ng the floor entirely clear for working space, The counterweight well for the system ex- tends to the basement floor, and all tension sheaves are located there, allowing full travel CYCLORAMAs. Three and extending across the entire stage between the feet from the rear wall fly floors aud along the sides of the stage, are three cyclorama curtains 8 inches on centers, These are 240 feet in length and 115 feet Пір mounted on channel iron and pipe framing. The enormous amount of equipment taxed the capac ity of the gridiron for the 1eaves, and so forth, but the use of steel tape saved considerable space. Each cyclorama weighs about 3 tons and can be location of cables, s: raised or lowered in about 30 seconds by an operator at the central control station on the stage floor. Cycloramas have been used very successfully in outdoor scenes. STAGE LIGHTING CONTROL. One of the most striking innovations in the equipment of the Chi cago Civic Opera House is the system of stage lighting control. l'or the first time in theatrical Portable Control Board for Bank Lights

Page 18

April, 1930 THE ARCHITECTURAL FORUM Ihe Main Stage Lighting Control Board, Occupying a Position Next to the Prompter's Box the curtain, in a station close to the prompter's where every effect is in full view. By the mere box where he can obtain a full view of the stage manipulation of a small knob, the lights can be as he controls the lighting. This is a distinct < controlled in color and intensity at any point at vantage over the old system where the lighting the proper moment. Scenes requiring complex operator worked back-stage at the side and oper- lighting effects, such as sunsets, thunderstorms, ated manually row upon row of dimmers with ba et lighting, and so forth, require no more large lever handles. Such а bulky switchboard in effort in their control than is necessary to flick a the wings is no longer necessary. The new system lighting switch in the home or to turn a knob. minimizes time, labor and valuable space, and al- "There are 141 individual lighting circuits in lows the lighting to be controlled from the front Ше Civic Opera House equipment, each of which Left, Voltage Regulator Unit Right. Group Master Transmitter

Page 19

Part Two 608 ARCHITECTURAL ENGINEERING AND BUSINESS includes lights of but one of the four colors usec SYSTEMS OF STAGE LIGHTS. There are nine on a theater stage —amber, white, blue and red. rows of border lights spaced on 7-foot centers. X typical circuit may cover the amber lights at Each row is in three sections, and the sections one side or the center of the footlights, the red move from the gridiron floor to stage level, соп- lights in one of the light bridges, or the white trolled by a selective station located on the stage lights in one of the pockets. The operator could floor. Operation of the equipment by power control the lights by manipulating the knobs on represents a great saving in labor costs in pro- every individual circuit, but to do so would in- ducing an opt The flexible light-feeding cables volve the turning of too many knobs. А method are counterwei in such a way as to always has been devised, therefore, to govern all the carry the cables above the lights and keep them lighting circuits through one knob, or to split the clear of the line of sight. control into major and minor divisions, depend- In addition to the 27 sections of border lights, ach group in лете are 16 bank lights, eight on either side of gency of a the stage directly in front of the cyclorama cur- ing on color, location and function, turn being controllable through the : single knob. Thus there are the individual con- tains. These are controlled in the same way as trols and the master controls, The individual cir- the border lights. There are also three large light cuits are grouped under master knobs governing, bridges accommodating one hundred spotlights for example, all the blue lights in the borders and each, which can be moved from the stage floor to footlights, all the amber in the pocket lights, all the gridiron by an operator on the car or at the the white lights on the bridges, etc. In addition, main control station. These light bridges are of all the lights of each color, no matter where lo- steel construction and have multiple cable sus cated, are controlled by a single color master pension, each bridge, with its spotlight equipment, knob. Finally. all the color masters may be weighing about 5 tons, Electric interlocking operated simultaneously by a grand master knob. systems prevent the bridges from striking the he energy required for the control of any of the border lights. This elaborate spotlight and bor individual lighting circuits is approximately one (ег light system is flexible in use, and tenth of that consumed by an ordinary pocket changes in scenery are accomplished with great flashlight. The energy controlled, however, may rapidity and with a minimum of labor. run as high as 30,000 watts in a given circuit, А large number of automatic hoisting machines and the total energy used in maximum lighting are mounted on fly floors at the left of the stage. may be as much as 1,250 kilowatts, or nearly — They are controlled from a central station located 700 horsepower. This control system involves on the proscenium wall at the right of the stage the use of three important devices,—the self- his station is a key-operated panel similar to a synchronous motor, the low-vacuum rectifying telephone switchboard, and it gives the operator tube, and а new type of saturated-core reactor. complete control of the moving of bank lights, Reactors have been used previously in stage light- border its, bridges, cycloramas and spot lights ing, but a new type was designed to fit this sys- n addition to this main contro] station, there are tem. Illustrations show the control switchboard three small relay stations with plug-in connectors aged that the operator may and also a typical control unit of the board. carry a portable control to the center of the stage. with all knobs within easy reach of the operator, which are so а ELECTRICAL INSTALLATIONS, 20 WACKER DRIVE BUILDING F. LOUCKS OF GRAHAM, ANDERSON, PROBST & WHITE T: most convenient method of studying the floor for local branch circuits. To keep the cable electrical installation of a building is to have diameters down to a workable copper size, not in mind at the start the distinct divisions of space. more than four floors are served bv one feeder This building has four classes of space: (1) the іп any shaft. Each feeder is run in a separate Opera House, (2) the Civic Theater, (3) rent- conduit. On the sixth floor, the conduits from all able area and (4) public space. The type of shafts but the main tower shaft are gathered to current for power and light, metering of current, g val system are separate for each. main switchboard, The tower shaft conduits are iRS AND CONDUITS. Above the sixth continued down to the basement and there join the ether, and in one group are carried down to the control and si RISERS, FEE floor the building is served by seven riser shafts, main group for the remainder of the distance. The almost all of which have cut-out cabinets at each power conduits are carried with lighting feeders

Page 20

April, 1930 in the shafts as far as possible before being directed to the local panels. POWER AND LIGHT Service. Тһе main power and light service for the building is 220 volts, D. C. for power and 220/110 volts, D. C. for lighting. This load is taken from the main build- ing switchboard located in the basement near the Edison Company's substation wall. TELEPHONE. The main telephone and telegraph service conduits terminate in a separate room in the basement. From this room the cables are run in conduits in a separate shaft to the sixth floor. A small room is provided on the sixth floor for terminal space for each service, From these rooms conduits are run to the open slots in the riser shafts. At each floor, connections are made to the public corridor wire mould for floor dis- tribution. Ordinary service for tenants requiring a few telephones is taken from the nearest ter- minal cabinet in the corridor. A small square sheet metal tube connects the corridor wire mould in cach bay with the removable base board on the tenants' side of the corridor partition, THE PUBLIC LIGHTING in the building is served from one riser in the main tower shaft. The cor- ridor lights are controlled alternately by wall switches beside the freight elevator in each story. THE EMERGENCY LIGHTING, stairways, exit signs and approximately every fourth outlet in public corridors is fed by two risers from the main tower shaft. Both systems are controlled by remote control switches in the first story elevator lobby. The Opera and Thea- ter emergency lighting is kept entirely separate from that of the office building. RENTABLE AREA WIRING, To meet the up-to- date electrical requirements for small power units and lights, the entire rentable area in the building is divided into bays. A bay is considered the area such as outlets in enclosed by four building columns or two columns , and a permanent wall. Every bay has a l-inch home-run conduit connection to the nearest cut- 7e со CAB. E CEILING OUTLET ROUND CONPUIT —--- OVAL рист SECONDARY RISER RECEPTACLE E -е ARCHITECTURAL "Z" Type Wiring of Office Space FORUM 609 out cabinet, The conduit within the bay is 34-inch and is arranged in the form of a letter “7” with a base receptacle outlet at each of the ends of the three lines making the letter's shape. The "Z" is reversed, or back to back, in alternate bays. On permanent walls or columns on each end of the the letter “7” a two-gang switch outlet is placed above the plug receptacle outlet. At the ceiling a single gang outlet box is installed above each switch outlet and connected through the switch outlet to the base outlet with а 34-inch conduit. The home-run enters the bay in the base receptacle outlet nearest to the cut-out closet at one end of the diagonal. All the "Z"s are connected by 34-inch conduits on outer walls and corridor columns. The purpose of this was to form a conduit skeleton raceway from which the tenant layout can be picked up with the minimum of damage by cutting of permanent building con- struction. АШ ceiling outlets are connected by a flat thin wall conduit. With this layout each tenant, regardless of the formation of his space, can be fed from the cut-out closet without enter- ing the adjoining neighbor's space. This is neces- sary, as tenants are charged for current used, and no confusion of wiring can be permitted. The cut- cut cabinets are provided with 66 per cent spare branch circuits. ALARM SYSTEMS. The building is not provided with a fire alarm system for the rentable area or the public spaces. А watchman's system, consist- ing of 140 wall-mounted keys with three patrol clocks, has been installed, THE OPERA AUDITORIUM LIGHTING is mainly in ept for a small portion under the bal- conies. The principal light sources are in coves at the ceiling and in troughs on the balcony rails. The proscenium arch is lighted from troughs in the proscenium wall. The bracket fixtures on rear and side walls are used only for emergency lighting and, aside from giving a decorative effect, add very little to the general lighting. At present the wiring is arranged for only one color of light, The entire general illumination of the audi- torium is controlled from the stage switchboard. The ceiling cove lighting i direct current an is served from a motor-driven dimmer bank above the auditorium. The remainder of the genera illumination is fed from the alternating current diagonal stroke o direct, е supply and control by re-actor dimmers. HAZARD Licuts. In the event of failure of al general lighting current supply, a hazard light system becomes operative. This consists of four 500-watt lamps in ceiling coves, one in each exit stair tower on each side of the auditorium an two in the grand foy This system furnishes enough illumination, with the help of the exit signs. to guide patrons to the street.

Page 21

MECHANICAL EQUIPMENT OF THE CHICAGO CIVIC OPERA BUILDING INCLUDING HEATING, VENTILATING, FIRE PROTECTION, PLUMBING AND ELEVATORS BY C. A. FRAZIER OF GRAHAM, ANDERSON, PROBST & WHITE HE problem of heating the Civic Opera House auditorium was intimately associated with the ventilation because there is no direct radiation in the auditorium itself. The side walls are substantially outside walls, since there is а fire escape court along the entire length of each side, and the heat that is radiated through these walls is replaced with that in the air used for ventilation. The fresh air fans for the ventilat- ing system of the auditorium and foyers normally take air from the outside. The air is cleaned in oil filters, heated to the proper temperature, and then delivered into the rooms. The exhaust fans remove the air and discharge it to atmosphere at the top of the building, except for a short time prior to the opening of the auditorium, when the ventilating system is operated normally in order to heat the area to the proper temperature. At such times it is a matter of economy to avoid wasting the heat, and the air is re-circulated and re-heated continuously. When the audience assembles, the exhaust fans discharge the vitiated air to atmosphere, and the entire volume of fresh air is taken directly from the outside. Considerable heat is given off by the occupants of the auditorium and by the lighting system, which is sufficient to increase gradually the tem- perature of the air well beyond that of maximum comfort. On account of this, the temperature of the air must be regulated in order to maintain a constant temperature at the breathing line with- out objectionable drafts. The ventilation requirements of the Chicago building code are the result of much experiment and investigation, and it is seldom necessary to do more than to comply with them. In an auditorium where the occupants are massed closely together it is customary to supply 25 cubic feet of air per minute per person, but this system is designed to supply 30 cubic feet of air per minute per person in order to further insure adequate ventilation. Four fresh air units supply air through the ceiling of the auditorium, and two units supply air at the rear and below the first and second balconies and to the foyers. Of the 127,850 cubic feet of air е supplied per minute, 74,100 cubic feet are ad- mitted through the plaster grilles in the ceiling of the auditorium. The fresh air is drawn through oil filters, after which it passes through cast iron heaters, and the temperature is raised to a point somewhat below the final temperature required. It then passes through the fan into another cham- ber and through a second set of heaters. By- pass arrangements to pass the air around and through the heaters, graduated temperature con- trol valves and thermostatic control of the steam supply and dampers are provided. The ther- mostats are set manually and can be changed at will as required by the conditions in the audito- rium and, also, the temperature of the air supplied through one duct can be different from that sup- plied through another, thus supplying air to one part of the auditorium at a different temperature from that to another. Under actual operating conditions these temperatures vary between 70° and 82°. Each auditorium air supply unit is so arranged that a future air cooling apparatus can be installed to deliver refrigerated air so as to permit a more intensive use of the auditorium during the hot summer months. The ceiling of the Civic Opera House audi- torium is from 65 to 75 feet above the main floor, and the heating and ventilating system is so ar- ranged that the air enters through practically the entire area of the ceiling. There are seven rows of approximately 20 inlets each. The inlets are arranged in such a manner that the air enters horizontally into the room with an initial velocity of from 200 to 300 feet per minute and is spent before the air settles downward. The exhaust air passes out at the floor through mushroom ventila- tors located under the seats into a large plenum chamber from which the air is taken through a system of exhaust ducts and discharged to atmos- phere. There are similar plenum chambers be- neath both the first and second balconies. The mushrooms in the main floor, and first and second balconies are arranged symmetrically in order to provide outlets throughout the entire seating area, The lower strata of the air are removed, and the 610

Page 22

April, 1930 THE ARCHITECTURAL FORUM 611 Distribution of Warm Air Through Auditorium Showing Duct Systems fresh air settles down slowly and is in turn re- moved in the same manner. The utility spaces for the building, such as dressing rooms, rehearsal rooms and scenery storage spaces, are mechani- cally ventilated with six changes of air per hour. There are ten fresh air supply units for the Civic Opera House space, having 214,000 cubic feet of air per minute total capacity and 12,790 square feet of fan heater surface. The radiation in these fan units is equivalent to one half of the total direct radiation in the entire 20 Wacker Drive Building. There are five exhaust system units for the Civic Opera House space, having 130,700 cubic feet of air per minute total capacity. The 15 f in connection with the Civic Opera House space have a total capacity of 344,- 700 cubic feet of air per minute. А ventilating system is provided for the Civic Theater, all basement space, the mechanical plant, shops in the first story, toilet rooms, and rentable area which do not have adequate natural ventila- tion, The ventilating system for the Civic Theater is substantially a small-scale duplication of the Civic Opera House system. There is one supply fan for the auditorium, foyers, dressing rooms, etc., having a total capacity of 30,900 cubic feet per minute, and one exhaust fan having a capacity of 17,875 cubic feet per minute. All other spaces in the building requiring mechanical ventilation, except the mechanical plant and toilet rooms, have air supplied at the rate of six changes per hour and, except in rentable area, have an equal amount of air exhausted. Air in the mechanical plant is changed ten times per hour. Exhaust only is provided in the toilet rooms when without usec fans usec windows at the rate of 20 changes per hour, and 10 changes per hour when with windows. The rentable area, exclusive of shops, is pro- vided with fresh air only. Adequate natural ven- tilation for spaces having windows is determined on this plan: Windows of the double-hung type, that is, where one sash telescopes into the same horizontal space as the other sash, leaving one half the total window as net opening, are con- sidered sufficient to ventilate adequately a floor area equal to ten times the gross window area. Tt is necessary, therefore, to provide mechanical ventilation of six changes per hour to the spaces or portions of spaces which are not provided with the proper amount of natural window ventilation. The sizes of the windows and the depth from wall to central corridor in the office portion of the building are such that the window area is just sufficient to ventilate the space. The window areas for natural ventilation are insufficient, and fresh air supply and exhaust are necessary in the broadcasting studios in the upper stories and in the kitchens and dining rooms in a suite oc- cupied by a club All remaining portions of the building having outside exposure are provided with direct radia- tion, irrespective of whether heated air is supplied or not, in order to maintain the desired tempera- ture during the night and at such other times as the ventilating system is normally shut down. The system is of the two-pipe, vacuum type, with one set of supply and return mains in the basement and risers for all of the building below the 38th floor. Another system is provided for the 38th to 45th stories, inclusive, having a supply main at

Page 23

612 ARCHITECTURAL ENGINEERING AND BUSINESS Part Two SHUTTLE SCREW Sade CONVEYOR CONVEYOR | - BUCKET CONVEYOR MOVABLE TRIPPER UPPER RUN OP PIVOTED Coal service to and ash dis- роза! from the five boilers Coal received in the Chicago Tunnel Company's cars or by sidewalk delivery. From the elevator boot coal is raised to a horizontal bucket conveyor | below the boiler room floor, | again elevated to the boiler room ceiling, again carried horizontally and discharged in- Сом. STORAGE Bunker LOWER RUN OF PIVOTED BUCKET CONVEYOR mî the 45th story ceiling and returns joining ове for the lower system. This division of the he: ing system was made to enable the tenants occupy- ing the upper floors of the building —among them radio broadcasting studio,—to have an un inter iting purposes rupted supply of steam for he independent of the offic the building. Hi for the lower system and in the > portion oi h-pressure steam is reduced at the boiler room th story for the upper system to from zero to 5 The radiators throughout the offic building are e equipped with an thermostat-controlled supply valve, and each ra diator is equipped with a vacuum return trap. А system of air-pressure control, located in the base ment, permits the regulation of the to risers and radiators throughout the structure. The system is so divided that great flexibility of steam distribution is obtained with consequent economies in steam consumption sound pressure portion of the automatic steam supply The stage of the Civic Opera House is 155 feet high, having at the top openings leading to atmos- phere, each equipped with dampers so arranged that they can readily be opened in case of fire Owing to the extreme height and the large amount of heat loss at the top through the roof, side and rear walls, it to bank a was necessary large amount of direct radiatlon near the top in — to the coal hoppers. Ashes are discharged in the tunnel cars order to prevent cold air from descending to the e floor and producing unpleasant drafts, Тһе additional radiation not only compensates for the h but it to force it de which is lost by exposure and infiltration maintains а column of heated air sufficient wnward and outward. The heating of the entrances to the Civic Opera Civic Revolving doors are not suit- to the Civic Civic Theater, and although ves- House and the Theater presented a very serious problem. those able for entrances such as Opera House or tibule doors have been provided, there are occa- sions when for a considerable period of time both sets of doors are continuously open. Under these conditions, the cold air naturally rushes in with g system must have ts. An unusually is installed at great velocity, and the heatin idequate capacity at these poi radiation entrances, through which fresh pre- The air supplied to the Civic Opera House entrances large amount of direct the each of heated air is supplied to the vestibules. alone amounts to 10,500 cubic feet per minute. This heated air mixes with and tempers the in- rushir r, the temperature of which is still fur- ther raised by the direct radiation placed in the lobby and foyers Тпе piping used throughout the heating system is wrought steel, black, with cast iron fittings cov-

Page 24

April, 1930 ered with canvas-wrapped 83 per cent magnesia. The vacuum pumps in connection with this < tem are in duplicate, each of full capacity for the entire system. The vacuum pumps discharge the condensation into a receiving and separating tank where any air contained therein is released, and from which the condensation is discharged ack to the boilers by boiler feed pumps. The vacuum pumps and boiler feed pumps are of the steam-driven type, the exhaust steam being de- ivered to the low-pressure steam piping system for further use in heating the building. There are in the entire building 132,800 square feet of direct radiation, comprising approximately one nalf of the entire heating load of the building. The total warm air supply for the entire build- ing is 360,000 cubic feet of air per minute sup- lied by a total of 18 fresh air fans in connection with 19,700 square feet of cast iron fan heater surface. Likewise, a total of 337,000 cubic feet of air per minute is removed by 18 exhaust fans. The heating surface in the fresh air fan units, when resolved to a common basis for comparison with the direct radiation in the entire building, is almost exactly equal thereto and, taken together with it ander maximum steam demand, requires approximately 66,500 pounds of steam per hour or 1,925 boiler horse power. FIRE PROTECTION AND PLUMBING FIRE protection system is provided im this building which enables it to obtain fire in- surance at the lowest rate possible with a mini- mum initial installation cost. The office portion of the building is protected by a standpipe system consisting of fire pumps, distributing mains, and risers, the latter having in each story outlets equipped with hose. The entire system is kept filled and under pressure at all times. The height of the building is such that with a single system of standpipes the pressure on the lowest floors would be too great. Two systems, therefore, were provided, each complete in itself. In the lower system a distributing main at the 'asement ceiling supplies standpipes for the Civic Opera space, which terminate at approximatelv 12th floor, and additional standpipes for the office portion of the building. This system is sup- plied by a motor-driven fire pamp which auto- matically keeps it filled under a static pressure of 50 pounds per square inch at the highest outlet. This pump is automatically controlled to maintain this pressure. Provision is also made for the tem to be supplied with water by Chicago River fire boats through two connections adjacent to the river and by fire department apparatus in the streets. Two additional connections are provided from the basement main, which is located on the THE ARCHITECTURAL FORUM 613 outside walls of the building, for the use of the city firemen for fighting fires in adjacent build- ings without the necessity of entering the premises, The upper system consists of a separate auto- matic fire pump which takes suction from the dis- charge of the lower system fire pump and sup- plies a riser extending from the basement to the 22nd story, where it connects to a distributing main supplying two standpipes in the upper por- tion The from of the building extending to the h story. upper system is also supplied with water River fire boats and by fire engines on the streets, and is provided with a connection located on the outside of the building for the use of city firemen for fighting buildings. Оп each story there are standpipe connections and fires โท adjacent hose of sufficient length to reach any portion of the floor. The city firemen can also attach their standard fire hose, floor, to these standpipes when required for more serious fires. In most Chicago office and where, it is customary to provide fire escapes on the outsides of the buildings. This building is unique in that, instead, four fire tower stairwavs, enclosed in 13-inch brick walls, are built i inside the building. Each stairway has a si vertical shaft or court, approximately 40 square et in area, extending from a point пеат the first ani to the top of the building and open to atmosphere. on cach buildings, else- Each court or smoke flue is neeted to the stairway should it court is also connectec con- at each landing to relieve accumulate therein. Each to the outside of the build- ing at approximately every fourth story by means of a window having a sliding sash held closed by a fusible link which, in case of fire, will permit the window to open by gravity. Two of these fire tower stairways are located in the wings of the building, terminating in the roof at the 23rd floor line. The other two stair- ways are located at the center of the building, ex- tending up through the tower to the 45th story, where they to atmosphere through an opening in the side of the building immediately below the sloping roof. Each of these fire tower stairways has a standpipe installed therein in such a way that firemen entering the to the outlets before entering a floor in which a fire exists. The remaining stand- pipes are so located that the length of hose at each outlet reaches all portions of the building, An automatic sprinkler system is provided for the Civic Opera and the Civic Theater portions only, having sprinkler heads on the sta for both, and in all utility spaces, dressing rooms, storage areas, rehearsal rooms, plenum chambers and other spaces in одацесвоа therewith. The sprinkler system has a 25,000-gallon storage tank, it of smoke, connect building can con- neet their hose scenery

Page 25

614 approximately 18 feet in diameter and two stories in height, located on the 18th floor, and from this tank piping of the sprinkler system is kept filled with water under pressure at all times. WATER SUPPLY. To insure ап uninterrupted supply of water, connections were made to two city mains in the street, and two independent service pipes were installed, each of capacity to meet all the needs of the building. The water fil- ter plant has a capacity of 60,000 gallons of water per hour and discharges into an open tank which supplies the house pumps. Two systems of water supply are provided, one each for the lower and the upper portions of the building, for reasons of economy and service. The lower system is sup- plied by two 5,000-gallon house tanks located in the 24th story. The distributing ers of the lower system are supplied from a main at the basement ceiling, which is connected to the supply riser for the house tanks. The upper floors’ sys- tem is similarly supplied by two 5,000-саПоп gravity tanks located in the 45th story, from which the water is supplied to a system of risers through a main located in the 43rd story. Тпе cold water supply to fixtures in the base- ment and basement mezzanine, to the mechanical equipment, for cooling purposes, etc., is distributed through a separate main under the city main pres- sure, thus saving the cost of pumping this addi- tional volume. The continuous hot water circulat- ing system is likewise divided into two parts. Water for the lower system is taken from the dis- charge of the house pumps for the lower stories and heated in two closed type water heaters sup- plying the risers through a main located in the basement. The hot water system for the upper stories is arranged similarly. In general, the standpipes are located throughout the building on alternate columns of the first interior row of columns, so making it possible to supply water to fixtures in the different offices with a minimum length of local branches. The piping for the hot and cold water system throughout is of galvanized wrought steel, and all of the piping is covered. ELEVATORS HE problem involved in ar rators was to give equal ser ranging the ele- vice to all parts of ARCHITECTURAL ENGINEERING AND BUSINESS Part 'Two the building. The tenants on the upper floors in- sist on having just as rapid elevator transportation as is available for those in the lower stories. In order to accomplish this the passenger elevators in this building are arranged in three groups, а local group having ten elevators which serve the lower 15 stories of the building, an express group having eight elevators which serve the 15th to 22nd stories inclusive, and a group of eight tower elevators which serve the 22nd to 42nd stories in- usive. All elevators start from the first story, o that they can receive intending passengers as hey enter the building and convey them to the tory desired without transfer and, vice versa, so hat they can carry passengers from any story direct to the street floor. Two of the elevators in angan a the tower group have shaft door openings at al floors in the building for use at night and on holidays. АП of the passenger elevators have a live load carrying capacity of 2,500 pounds. The speed of the local elevators is 600 feet per minute. The express elevators travel at a speed of 700 feet per minute through the express zone and at a speec of 600 feet per minute from the 15th to the 22nd floors, inclusive. The passenger elevators are of the gearless, traction, direct lift type and are each provided with all of the latest safety devices. The two tower elevators which are designed for use as night service cars, serving all floors in the building, are each equipped with a flash light annunciator. Each annunciator has two rows of illuminated numerals, one for "Up" and one for "Down," and each numeral is that of a floor in the building. The numerals become illuminated as the push buttons on the various floors are type of pressed, indicating to the operator when and at which floors there are waiting passengers, thereby making it necessary for the might service car to travel only at such times as there are waiting passengers. In addition to the pas- senger and freight elevators for the office building there are three passenger elevators for the patrons of the Civic Opera, three passenger elevators for the stars and stage personnel of both the Civic Opera and the Civic Theater, serving all the floors on which dressing and rehearsal rooms are located ; and there is one Civic Opera scenery lift.

Page 26

POLICY AND OPINION hi SHALL LAWS LOWER ARCHITECTURAL STANDARDS? Мот states recognize the necessity of re- i quiring that buildings of all kinds be de- signed by competent people. To this end they have framed exacting laws for the registration of architects, setting forth the qualifications neces- sary,—the requisite education, training and ex- perience. A high standard has been set but one that is by no means too high or exacting to con- serve the public safety and health. Any attempt to lower this standard is to be looked upon as retrogression, and yet in one state bills have been introduced that would, И made laws, allow рег- sons without the qualifications of architects to virtually practice architecture. Other states might follow this lead, to their detriment, by con- sidering similar bills to allow any licensed en- gineer to file plans for a building. There are undoubtedly engineers who are com- petent to design buildings of certain kinds. They are usually structural engineers. However, until these men separate themselves from the many types of licensed engineers who are unqualified to deal with building problems, they will probably be classed with the latter. Structural engineers might well set up standards of professional train- ing and experience similar to those of architects, and they might also introduce bills for recognition by registration. In this way the grave danger of granting to incompetents the privileges of de- signing buildings and filing plans would be obviated. The new Multiple Dwellings Law of New York requires that all plans for such structures be filed with the Building Department by regis- tered architects. Before the passage of this law such plans could be filed by architects, owners, or the owners' agents. As agents of the owners, licensed professional engineers made and filed such plans. The new law deprived the owner and the licensed professional engineer, as agent, of this privilege. То reéstablish their former status, the New York Association of Licensed Engineers and Land Surveyors and others have secured the introduction of several bills in the state legisla- ture granting to licensed professional engineers the right to file plans for such buildings co- equally with registered architects. The bills are Assembly Bills Nos. 1157, 1183. 1294, 1379, 1517 and 1555. and Senate Bill No. 977. The license of Professional Engineer is granted to one who has had six years of practical ex- perience in engineering, —enpgineering is defined as projects of an engineering nature. There are actually 27 species of the genus engineer licensed as professional engineers under the law of 1920. It is required of architects registered after the passage of the registration law of 1913 that they shall have had a certain amount of technical and liberal education at schools of the United States or Canada accredited by the State Education De- partment and a period of practical experience in the office of a reputable architect or architects ; be examined by the State Board of Examiners; or registered in another state having an equal standard of requirements. It is evident that there is a vast difference be- tween the requirements for architectural registra- tion and for professional engineering licensing. Before the two professional groups can even be considered as co-equal they must have had equal degrees of education and practical experience. Only a very slight knowledge of building con- struction is needed to differentiate the structural engineer from the ceramic, sanitary, chemical or any of the remaining 23 varieties of engineers who are Licensed Professional Engineers. As long as the state adheres to its archaic and in- defensible grouping of the twenty-seven identi- fied varieties of engineers into one classification, it is unthinkable that the safe and sanitary plan- ning and construction of buildings should be en- trusted to such a tehnically nondescript miscellany of persons. Registered architects have no objection to the state's granting certain privileges of designing and of filing plans to structural engineers who have adequate qualifications of education and practical experience. It is found that the propo- nents of the laws mentioned consist principally of engineers who are not engaged in independent practice as structural engineers but who seek to enjoy some of the advantages that accrue to registered architects, Opposition, immediate, insistent and wide- spread, should be made to the passage of any bills which threaten to lower the standard of the pro- fessional qualifications of those engaged in plan- ning buildings, and to endanger thereby the safety and sanitation of buildings and the security of building investments. А. T. 8. 615

Page 27

RECENT AIRPLANE HANGAR CONSTRUCTION IN EU EUGENE Y CONSULTING HILE in E | Germany last summer, number 1T( pe of France and shall desc which outstanding inspected airports and ribe some interesting hangar studying. а in construction is well worth \mong the han may the door openings, the simple but efficient mechanical operation of the the liberal its and walls, and the universal use A notable features of these gars be mentioned the great height of doors, use of glass both in sky of fireproof construction. feature of these hangars is the provision made for the com fort of both passengers and employes. The mag- nificent airship hangar at Orly, near Paris, is a remarkable example of the daring use of rein- forced concrete by French engineers. In France the construction of the framework of the latest type of hangar is principally of rein- forced concrete. In Germany, on the other hand, both reinforced conerete and steel are in common use, and use the the latter seems to predominate [he a blocks covered with stucco in more recent structures. walls are usually of terra cott or of reinforced concrete between steel uprights The new hangar at Munich has walls of glass tile an about 332 inches thick, made somewhat like tile. The concrete roofs are generally slabs ordinary terra cotta of made reinforced or reinforced re W ROPE STERN ENGINEER terra cotta blocks cove sau with composition roof- X great deal of glass is used in skylights and he han doors. Т traffic aprons The French in pane t ir windows, anc 1 it is almost as light inside t the daytime out of cement, and the wide paved with concrete. as је gars during floors are o front hangar in are usual 1 “асс v has sliding doors made 5 2 feet in dion" is in general use each about wide, while Germany folding door both countries they are operated by poweror han [here several good examples of mode hang Tempelhof Field, Berlin, t H. Fricke, Consulting Engineer, E. La Sauce & re of steel construction, 288 feet long and are с the irs at work of and Hirsch, These 100 feet deep, with one column at the center of de Kloss, Contractors the front, making two clear spans of 144 feet each. This center front column is of the twin type and consists of two cross-braced uprights [he inner upright supports 10 feet longitudinal spaced 8 feet apart. the main longitudinal roof truss, which is and 144 This supports the transverse roof high feet long truss which have The framework above the door openings is cov se trusses, a 90-foot span and are aced 20 feet apart. steel ered entirely with glass and is supported by can tilever brackets which are attached the main The Tempelhof Airport, Berlin 616

Page 28

April, 1930 THE N г ARCHITECTURAL FORUM т ~ Erecting the Steel Frame of a Hangar, Tempelhof Airport, Berlin longitudinal truss. The upper track of the accor- dion doors is fastened to the lower part of this steel frame, The door openings are each 130 feet long and 27 feet high. Тпе doors are of the accordion folding type having panels 634 feet wide, operated by an electrically-driven winch and а wire cable below the floor. The frames of the wooden door panels are all made of steel angles. There is an excellent hangar of steel construc- tion recently completed in Munich which em- bodies some novel features. It was designed by К. J. Mossner, architect, of Munich and Ber- lin, and was constructed by В. Seibert, of Saar- bruecken. The building is 270 feet long and 230 feet wide. The door openings on the two sides of the building are 200 feet wide, and on the Handdriven Winch The Folding "Accordion" Hangar Doors are Operated by a Continuous Steel Cable Placed Either Under- ground or Above the Doors and an Electrically Driven or Hand Power Winch. Illustration Shows Doors at Kottbus Hangar Temporarily Hand- operated Inside Outside

Page 29

618 ARCHITECTURAL ENGINEERING AND BUSINESS Part Two Interior of Tempelhof Hangar with Doors Open front of the building there are two door openings each 102 feet wide. АП of these door openings are 33 feet high. The doors are of the accordion type and are hung from overhead tracks sup- ported by the truss work of the roof. Each door is operated by an overhead wire cable and electrically-driven winch. Тһе exterior is par- ticularly effective, due largely to the fact that the entire steel framework is vigorously silhouetted against the glass tile walls, which are about 332 inches in thickness. The hangar is extraordinarily well daylighted by the eight rows of skylights in the roof and the glass tile construction of the walls. The building is heated by a very complete system of heaters, blowers, and hot air ducts. Many of the important air fields in Germany Opening the Accordion Doors at the Kottbus Hangar

Page 30

April, 1930 THE The Munich - Oberwiesenfeld Airport Hangar with all of the Doors Open on Three Sides of the Structure are planned not only for the particular business of despatching and receiving passengers, mail and so forth, but also with a view to attracting the general public. Tea gardens with music for danc- ing are provided, and in many instances hotel accommodations and other overnight facilities are provided for the convenience and comíort of passengers and visitors. This is particularly true of the airfields at Chemnitz, Berlin, and Frank- furt. There is an extensive balcony on the roof of the main building at Tempelhof Field, Berlin, which affords a splendid view of the field. Tem- pelhof is only 20 minutes away, by underground rail, from the heart of Berlin, and it is a delight- ful place in which to spend an afternoon. It is well patronized. In the main building a lecture room is equipped with a complete plan of the grounds and models of the buildings and hangars. Lectures are given frequently, explaining every- thing of interest to the general public regarding the plant and the operation of the field. Guides conduct parties through the buildings and hangars at regular intervals, giving instructive talks and describing in detail the various types of airplanes. I remember being much interested in a working model of the great doors of a hangar, operated by electric power, displayed in the lecture hall. Throughout Germany everything possible is done to make aviation popular with the people. All of the recently built hangars in Le Bourget, near Paris, are of reinforced concrete construc- tion. They are of about 165 feet span and 165 feet deep, with a clear door height of 30 feet. The doors are of the sliding type, operated by hand. The trusses have a parabolic-shaped top chord. There are two splendid examples of reinforced concrete hangars at Palyvestre, near Toulon, which were built by the Limousin Company, of Paris. They are of 180 feet span and 200 feet deep. The doors are of the sliding type and have the great height of 49 feet, permitting the en- trance of the largest plane in existence, the ARCHITECTURAL FORUM 619 recently built “Dornier ЕО The “Dornier ЕОХ” has а wing spread of 160 feet, a fusilage length of 132 feet, and a height of 33 feet. Orly is a military airport about ten miles south of Paris. Orly has two airship hangars built of reinforced concrete, erected between 1922 and 1924. They are decidedly bold and original in design, constructed by the Limousin Company. E. Freyssinet is the engineer responsible for the design. He is, in my opinion, a genius. These hangars have a span of 285 feet, a rise of 185 feet, and a length of 985 feet. They are made of reinforced concrete corrugated plate, without beams or girders in the construction. The cor- rugations are from 10 to 17 feet deep and are spaced 25 feet on centers, the sides and top of Glass Tile Walls in the Munich Hangar

Page 31

620 which are only 332 inches thick, and the bottom 8 inches thick. There is a continuous line of win- dows extending around the arch at the top of each of the corrugations. A ventilating hood with louvers is placed at the peak of the roof. There is very little reinforcing steel in the arches, as their curve follows exactly the theoretical line of pres- for the dead load,—an catenary. The depth of the corrugations varies from 17 feet at the bottom of the arch to 10 feet at the top, in order to provide for the wind pressure stresses sure inverted AND BUSINESS Part Two Interior of the Munich-Ober- wiesenfeld Hangar Showing In Daylighting with the Doors Closed terior feature in this construction i> a] provision for longitudinal expan- An inte that no sp sion was considered necessary for variations т length due to the temperature changes, which are taken up in the corrugations. Although the han- gars are almost 1.000 feet long, no cracks have developed in the four years since the work was completed. No leaking has occurred through the ype, notwithstanding the fact that there is no roof covering or finish other than the con- struction concrete to which no surface applica enve Le Bourget Airport, Paris

Page 32

April, 1930 THE ARCHITECTURAL FORUM 621 The Reinforced Concrete Hangars at the Palyvestre Airport, near Toulon Reinforced Concrete Hangar at Bion The interiors of these hangars have a network of steel trolley beams ex- tending from end to end, so that they may be used for the construction of airships. The doors, built about two years ago, are slid- ' and are operated by power and hand. They are not intended to be permanent, the design adopted being selected only for reasons of econ- The cost of the hangars, including the tions have been made. omy. The “Dornier EOX" which are of reinforced concrete meter thick, but not including the cost of the temporary doors and end covering, was about 12,500,000 francs each іп 1926, With the change in the value of the franc, and also in the materials that have since 1926, these much foundations, slabs 1 rate of wages and cost of come about would cost more today in French currency. For military purposes Г cannot imagine any thing better in the way of hangar construction than that exemplified at Orly. A shell would pass through the envelope without doing much dam- age. The hangar could be riddled with shells and still remain standing. As a practical demonstra- tion of the extraordinary inherent collateral or in terlocking strength of this form of construction, en of an actual occurrence. Last ample is g year it doors of the hangar, both in height and width. This reguired cutting through one of the cor- was decided to enlarge some of the side rugated ribs, and it was done without the use of needles or supports, the load distributing itself diagonallv into the adjoining ribs.

Page 33

622 ARCHITECTURAL ENGINEERING AND BUSINESS Part Two The Hangars at Orly with Temporary End Enclosure and Doors Altogether, for boldness of conception, en- the hangars at Orly, and they are an object les- gineering skill of the highest order and first class son to American engineers and architects in the workmanship, I have never seen anything to equal possibilities of reinforced concrete. HIT 777 77 sth YY Ж ~ (4111 The Reinforced Concrete Hangars at Orly, near Paris

Page 34

HOUSING BUSINESS ORGANIZATIONS FOR I increasing size has characteristic of Americar EFFICIENT OPERATION BY HARRY ARTHUR HOPF** the past two decades the factor of rapidly јесоте ап outstanding 1 business organizations. This factor has made its influence felt to such an extent that special Ноизпа themselves upon the consi ecutives and they have solutions mainly by the trial and error method needless to say, the solu manner have not always s g problems have forced deration of busine been compelled to tions arrived at in this atisfied the needs, With increasing size o we usually find as concor of functiona duction, accompanied by and standardization of eq ingly complex conditions operating req influence on requirements planning the housing con which must the performance of work l. Need for more eff control. in connection with uirements w Need for increased accurac business organizations nitants the development ization, specialization and mass pro- mechanization of work uipment. These increas- , in turn, create special hich have an important siderations. Among the be taken into account in physical setting to be provided for are t ective nese : organization and and dispatch routine operations. 3. Need for better adjustability of space to operating requirements. 4. Necessity for achieving higher standards of illumination, ventilation, acoustics and other physiological factors. 5. Introduction of mechanical intercommuni- cating devices, 6. Suitable location of centralized suites for executives, as well as of offices for depart- ment heads. 7. Proper location of vaults, storape rooms and supply departments, 8. Provision of adequate service elements, 9. Provision of adequate facilities for recep- tion of public. 10. Provision of adequate facilities for receiv- ing, storage, shipping, etc. 11. Adaptability of space to varying rates of departmental growth. "Presented before the Chicago Chapter, American Institute of Architects, February 11, 1930. **Senior member of Н. A. Hopf and Company, Management Engineers and Building Planning Spe- cialists, New York. [bv] 12. Maintenance of sound balance horizontal and vertical expansion, The architect who is faced with the problem of bringing to expression in a building which he has been commissioned to plan, a logical and compre- hensive scheme of utilization which will meet the needs just mentioned, together with many other needs of related character, often finds himself hampered from the very beginning of his study by the fact that, as а rule, the client either does not know his own operating requirements or is unable to express them in terms which the archi- tect can understand. Furthermore, it is frequently the case that the client has committed himself to the purchase of a site without consultation with those competent to advise him, and thus, regard- less of operating requirements, the possibilities open to the architect are sharply limited by the fixed conditions. For the purposes of the present discussion, and in order logically to develop the theme of building economics as affected by operating requirements of business organizations, let us accept as a postu- late the principle that in all building planning, and particularly in the case of a special purpose office building intended for exclusive occupancy by one organization, the proper point of departure is a study of the organization and its requirements. I shall endeavor to outline the major elements in a practical program covering a special purpose office building project and, against such a background, to describe briefly the specific manner in which the physical conditions of the building must be adapted to operating requirements. between ) OPERATING REQUIREMENTS AND THEIR EFFECT ON PLANNING Assuming that a business organization is about to embark upon a new building project, the first practical step to be taken is to ascertain the effect of its operating requirements on the planning of the structure. In order to secure the basic facts, a study of departmental organization should be un- dertaken and a statement prepared giving the names of the various operating units, together with comprehensive descriptions of the functions performed by each. With such a statement avail- able, the next step is to identify all the depart-

Page 35

ARCHITECTURAL 624 ments particularly concerned with service to the public, for it is obviously necessary to give such departments preferential locations so as to facili- tate their contacts with the public. laving determined in a preliminary way the manner in which outside contacts are to be main- tained, the next step is to ascertain in а tentative manner the desirable physical grouping and loca- tion of operating units, based upon : Character of supervision required. 2, Related nature of work. 3. Frequency of personal intercommunication. 4. Proximity of supervising officials. he influences on space planning exerted by these four factors often prove to be of conflicting jecomes a nice problem to геп character. Tt therefore determine which of the four factors shall be g ht and how reconcilement of diff achieved. Unless the problems location and layouts are solved from the broad point of view of benefit to the whole, it will be impossible to avoid costly changes and alterations after the organization 18 roused in the new building. MECHANIZATION ОЕ Work. One of the standing characteristics of modern management is the trend toward mechanization of work. The inereasing need for accuracy and speed occasioned the most wei ences may b volved in departmenta ш- out- yy the exacting demands of business makes it im- jossible to continue to achieve satisfactory г sults through the application of human en alone, Consequently, in the last decade or two, we have witnessed enormous developments in the d of office machinery and the subordination of office procedures and systems to the possibilities resented by the use of standardized machinery. The introduction of such machinery has, per- force, had an influence over the provision of space and the modification of space as over the augmentation of wiring servic yeyond anything which could have been imagined ten years ago. It has, moreov srought about the necessity of installing acoustical treatment so г to reduce to a minimum the strain upon the ner- vous systems of workers caused by the noise of machine operation. To be convinced of the pro- found influence of the trend toward mechaniza- tion of office work upon the physical conditions of the environment in which the work has to be performed, one has only to make a comparison between the characteristics of the modern-day office building and those of the office building of ten or fifteen years INTERCOMMUNICATION. Among the more im- requirements, viewed from the may be mentioned the andards, as well = Ват ago. portant operating effect upon office planni need for more rapid performance of work and more expeditious intercommunication, The pace ENGIN EERING AND BUSINESS Part ‘Two of business today is far faster than it was ten years ago, Whatever the cause for this condition, modern office planning must take account of it as a factor of the highest importance. In practice, the solution of the problem of accelerated activity is predicated upon the effective location of operating units in both the horizontal and vertical relation- ships and the provision of mechanical and elec- over- trical intercommunicating devices which come distance and which. dispatch messages and papers at a rate of speed far exceeding the high- est standard possible of attainment by human means, DEPARTMENTAL SPACE. Another factor linked with operating requirements is the determination of departmental space standards and of the vary- ing rates of growth experienced by different de- partments of the organization, so that adequate provision of space may be made for both present future needs and the twin dangers of scanty allowances may be guarded anc or over-liberal spe against. The importance of determining accurate space standards cannot be too strongly stressed, this task should be approached by established techniques which have been devised for determin- anc ing net areas required. [n a large bank whose rapid growth had n sitated the occupancy of several buildings in the financial district period of nearly three months of painstakingly careful analysis and study to measure present and prospective space requirements preparatory to planning a new bank building. The study was un- dertaken by trained engineers in the employ of the bank planning committee, and every single element entering into the detailed space calcula- tions was checked back with the department heads concerned before the definitive space schedules covering existing requirements were ultimately compiled. After this had been done, the engineers prepared estimates of the personnel and equipment requirements as of the approximate time of com- pletion of the new building and for a period of five vears thereafter, and from these they finally determined the probable space requirements for of an eastern city, it required a the same dates. It will readily be seen from the foregoing dis- cussion of operating requirements and their effect upon planning, that studies along the several lines indicated are essential in order to provide the owner and architect with information of valid and detailed character for the purpose of undertaking a new building program on a sound basis, Unless the influence of operating requirements over building planning is thoroughly recognized and its cal limits, the suc- implications are pursued to logi cess of any new building program will be open to пезпоп.

Page 36

April, 1930 THE DETERMINING THE CHARACTER OF THE BUILDING After operating requirements have been ascer- tained, the next practical step involves the de- termination of the character of the building which is to be erected, Eliminating from discussion the subject of building regulations—which differ in various parts of the country—we may proceed to à consideration of the questions of size and gen- eral proportions. Both of these usually present in- teresting and many-sided problems. We will as- sume that, although the question of financial in- vestment із naturally an important one, organiza tions whose affairs justify housing in a special building are usually im a position, within reason- able limits, to subordinate problems of building finance to other practical considerations, As a rule such organizations are governed by the desire to erect rather monumental buildings and at the same time to provide suitable space to meet their requirements for an indefinite period oí years. In the past, however, it has frequently hap- pened that business organizations such as banks, insurance companies and important commercial and industrial concerns, which have planned more or less elaborate buildings, have failed adequately to forecast their space requirements. Conse- quently, within a brief period of уе: pancy of the new offices, Шеу have found that their quarters were becoming crowded and have been compelled either to increase the density of space occupancy or to add in makeshift fashion to the existing buildings. In recognition о this situa- tion the pendulum has now swung in the opposite direction, and a tendency has developed to erect buildings larger than estimates of future space requirements warrant. This condi- tion has caused the adoption of extravagant space standards, the tying up of capital in unproductive investment and excessive maintenance costs, FACTOR OF ORGANIZATION. It should be recog- nized at the outset that the factor of organization has an important bearing upon size and propor- tions of the building. Most businesses will find, after study of their organization characteristics, that there are relatively few major functions to be performed. As a rule these embrace, specifically, finance, production, distribution, accounting, en- gineering and service. Properly to integrate these functions, it is often found advisable to locate the departments responsible for their performance on different floors of the building, or at least to group them on three or four levels. Such an arrange- ment obviates the creation of conflicts due to the demand for additional space caused by varying rates of departmental growth. The functions named are hardly ever found to require areas of like size, and the proper grouping of them usually makes it possible to provide for their rs of occu- reasonable ARCHITECTURAL FORUM 625 future growth by means of horizontal expansion. From the foregoing considerations, it appears that the practice of estimating space requirements for many vears in advance need no longer be fol- lowed and that the problem of size resolves itself into finding the practical answer not to the query, "How big a building shall we build?” but rather to the question, "How small a structure will reason- ably meet operating requirements for a limited period of time?" When the need for additional space evidences itself, this may be provided by the erection of wings attached to the first unit, and this procedure may be continued until the opti- mum size of the building, taking into account de- sign and mechanical facilities, as well as limitation of the plot of land upon which the structure is erected, has been reached. It is essential, of course, in considering size and general proportions of the building, to study care- fully such questions as ceiling heights, elevators, exposure to light and air, location of fixed service elements, number of subterranean levels and in- troduction of special features such as vaults, stor- age rooms, building service units, etc. HORIZONTAL AND VERTICAL EXPANSION. Гог every organization it becomes necessary sooner or later to determine and maintain a balance be- tween horizontal and vertical expansion. If the building is so designed as to violate permissible limits in either of these directions, it may be as- sumed with certainty that excessive operating costs, insofar as staff and equipment are con- cerned, will be erienced. In one instance, the office layout which had been planned resulted in separating, by a distance of about two hundred and forty feet in the horizontal direction, two im- portant groups of executives, the character of whose activities necessitated constant personal contacts, When this defect was pointed out to the organization, the validity of the criticism was ad- mitted but the conclusion was expressed that noth- ing could be done about it since all arrangements had already been consummated, 1t remained for the engineer whose advice had been sought with respect to the space problem, to make the obvious suggestion that the organization arrange to ex- change one-half of the space on the floor in ques- tion for an equal area on the next floor above, in direct vertical relationship to the half floor to be retained, This plan was finally adopted, a separate stairway connecting the two floors was introduced, and the two groups of executives found them- selves located within fifteen feet of each other in the vertical direction. Easy communication was, of course, furnished by the stairway, and the re- sult of the change was to facilitate extremely im- portant contacts of constant occurrence through- out the business day and thus to save а substan- tial expenditure of time, money and energy.

Page 37

626 Cesc Heicuts. In considering further the problems of size and general proportions of the building, a factor of great importance is the pro- vision of adequate ceiling heights. The modern trend in planning offices is entirely in the direc- tion of the application of the open office principle. No longer are clerical stafts separated from each other by partitioned spaces which obstruct the flow of the work and foster the "departmental" in- stead of the "organization" viewpoint, In the well planned office, groups of clerical workers are brought together in large, open, unobstructed areas which strengthen esprit de corps and permit of planning for expeditious procedure acc: rding to the principle of forward movement of work. For such offices, ceiling heights of more than the usual commercial standards must be provided. One defect of the commercial type of office building for planning large areas to be occupied by scores if not hundreds of clerks lies in the fact that, with standard ceiling heights of ten feet or thereabouts, the provision of adequate arti- ficial illumination at desk level brings the remote fixtures into the line of vision of clerks and thus creates an unsatisfactory lighting condition. Moreover, from the psychological point of view, a relatively low ceiling height in a large open office causes an unpleasant sense of s[ and consequently has an adverse effect upon the desire of employes to work. For these reasons and others which might be mentioned, ceiling heights of buildings designed in accordance with the re- quirements of large clerical organizations should be at least eleven to twelve feet in the clear; the extra cost involved in supplying this feature is, cording to experience, more than offset by its favorable influence upon work productivity. LIGHT AND Ак. Considering now the questions of exposure to light and air, it is essential in order to capitalize the relatively large investment con- stituted by the annual payroll of a clerical organ- ization, to provide good conditions of illumination and ventilation. Therefore, in determining the problems of size and general proportions, we must bear in mind that, until such time as dependence may be placed entirely on artificial illumination, fenestration should approach fifty per cent of the total wall space, and wings should, as a rule, not exceed fifty feet in width, If these two standards are adhered to, one may be assured that the cleri- cal staffs to be housed in the building will, for the major portion of the business day, enjoy natural illumination and the most favorable conditions of ventilation which can be provided in the absence of an artificial system, to which specific reference will be made later. ARCHITECTURAL AND WORK OBJECTIVES. As far as design of a special purpose office building is ce restriction ARCHITECTURAL ENGINEERING AND BUSINESS Part Two concerned, it may be permitted to a layman to venture the opinion that it should be characterized by simplicity, individuality and impressiveness. In general, business organizations which contemplate the erection of an office building for their own occupancy, are likely to consider first of all the architectural elements of the problem. With the highest possible regard for the importance of ihese elements, it should be recognized that the prime purpose of erection of a building of the type described is 10 further the work objectives of those whom the building is intended to house. Physical environment exercises a tremendous in- fluence over work productivity, and the first and last problems of all special purpose building plan- ning should be concerned with the creation. of conditions which will be conducive to the achieve- ment of a decrease in operating costs. Many years of experience in dealing with prob- lems involved in special purpose building planning justify the opinion that the difference in work accomplishments between an organization located in a poorly planned, badly lighted and crowded office and one housed in a building which brings to expression the results of purposeful planning, based upon intelligent analysis and adherence to high standards, amounts usually to an increase of from fifteen to twenty-five per cent in the produc- tivity of the staff. Translated into terms more readily understood, this means that the increase in staff productivity is often sufficiently great to exceed the interest on the complete investment re- quired to finance the cost of the new building. From the foregoing discussion, the conclusion is justified that the determination of the character of the building must be based upon elements such as those referred to and that a definite relationship may be worked out between the needs of the or- ganization and the characteristics of the building which is to house it. It should be especially noted at this point that careful study of all the factors to which reference has been made should logically precede the architectural planning stage. Unfor- tunately, this consideration is honored more in the breach than in the observance, with the result that the burden of responsibility of the architect, in any case great, is needlessly augmented, and a series of delays, compromises and adjustments of conflicting viewpoints complicate the creative period of his work. The majority of architects who have had experience in the planning of spe- cial purpose buildings have learned to their cost how discouraging and detrimental such a condi- tion can be. It is therefore regrettable that archi- tects, as a rule, are without influence in the shap- ing of the program which should logically lead up to the planning stage. (Concluded in THE ARCHITECTURAL Forum, May, 1930)

Page 38

STANDARDIZING APPRAISALS JOHN TAYLOR BOYD, JR. A appraisal is used in deciding the amount of money to be loaned on a projected building or in determining the value of an exist- ing building as an investment or speculation. Ap- praisal is the means of determining the risk, qualitatively and quantitatively. The method of appraisal, as everyone knows, is a much disputed issue. We in the building industry have no au- thoritative standard of appraisal today, —we cannot even agree on the factors that enter into the production cost of a building. There is con- stant complaint on various phases of the subject ; mortgage loan issues are in default too frequently for the good of the industry; confusion exists. One is reminded of Mark Twain's famous remark about the weather. After four centuries of trouble with appraisals, it is time that the building industry should do something about it. How otherwise can we convince the public of the in- vestment value of building securities? Fortunately, a powerful interest has recently taken appraisal in hand. The Investment Bankers' Association of America has formally adopted, “in convention assembled," the 1929 Report of its Committee on Real Estate Securities, outlining those particular items that should be included in real estate appraisals for purposes of a bond issue. A full summary of this important report will be found in the Commercial and Financial Chronicle, November 2, 1929, Vol. 129, pp. 2754- 2757. 1 quote freely from that part of the sum- mary dealing with real estate appraisals. The Committee reports: "While a great many have studied this involved subject for a good many years, very few organizations or groups have actually set down on paper any final conditions as to what does and what does not, in their esti- mation, constitute good practice. This is a subject hard to standardize and one which presents new angles for each case considered. Your Committee has, however, after consulting with representa- tive men, institutions and organizations through- out the country, formed a general opinion as to what might well be considered good practice, and it wishes to outline the reasons for its conclusions. "A very commonly used phrase is that 'no property is worth more than it can earn,’ but it is pointed out that an appraisal should not “be based on the capitalization of earnings alone. "Tf an individual desires to purchase a building as an investment, he has undoubtedly become in- terested because of the present and expected future earnings of the property. He engages a real estate expert to check the entire situation. He in turn must be satisfied with the trend of growth of the district of the city in which the building is located, and with its adaptability to the site оп which it is located and many other factors contributing to the worth of the property as an investment. He checks the available pieces of property in the immediate vicinity, endeavor- ing to inform himself as to whether or not a building can be erected on another piece of prop- erty for less than the asked price of the first building, keeping in mind, of course, that the standards of construction and the earning capac- ities of the buildings should be the same. He figures the replacement cost of the building under consideration, and the value of the land ; he figures the earnings and capitalizes them at a proper per cent to arrive at a capitalized earning value. He checks all related data, and from all this árrives at the final appraisal value. For a similar build- ing, an appraisal for purposes of a loan issue should be made along substantially these same lines. Opinion on proper appraisal will probably not differ widely in the case of an existing build- ing, but the procedure to be followed in making an appraisal to be used in connection with a construction loan presents some debatable and very difficult questions: "First. What items can properly be included in the physical value of a building when completed and ready for occupancy ? Second, If the capital- ized estimated earning value is greater than the physical value, should any increased value be given to the physical in arriving at the final ap- praisal value? А more concise statement of the situation could hardly be made." PHYSICAL VALUE. As was mentioned in last year's report, there are those who believe that every item going into the cost of a building, from labor cost and materials to the discount on the bonds, should be included to make up the physical value for the purpose of a loan issue, while, on the other hand, a certain large insurance company considers in physical value only the cost of ma- terial plus the cost of labor with no allowance for contractors’ profit and architects’ fees, reducing this to market value for purposes of a loan. In- cidentally, at a regional conference of A, T. A. Chapters of New York State in 1929, it was said that a savings bank in up-state New York would not count the architect's fee in appraisal as part of the cost of a building. On this point the Com- mittee says: “Those two examples probably could be said to represent the two extremes in thought, between which there must be a middle ground 627

Page 39

628 supporting sound practice. ^ "herefore, after care- ful study and also realizing that appraisal practice does not lend itself easily to standardization, your Committee beieves that in most instances only these items should be included in the total esti- mated physical value of a project that is being appraised for purposes of a construction bond issue. Market Value of Land. Cost of Materials. Cost of Labor. Contractors' Fees. Architects’ Fees. Interest paid, Insurance and Taxes during Construction.” As to including discounts on bonds, the Com- mittee rejects the idea, remarking that “the poorer the credit of the borrower, the greater the bond discount, which added to the physical value of the property would make а higher appraisal, and eventually, in the hands of an optimistic lender, probably a larger loan. The addition of each succeeding item of this type, although represent- ing a cost to the owner, nevertheless cuts down, if the bond issue is made on the basis of a fixed percentage value, the real tangible security back of the loan. Items of this type should be cluded.” The reference to the use of a high dis- count to inflate the loan has a familiar ring to those architects who have protested against the cubage system that is employed by some mortgage institutions for computing construction cost on the ground that the higher the proportion of waste space in a building the greater will be the appraisal of its physical value,—a method which penalizes good design and puts a premium on bad planning. CAPITALIZED EARNINGS. On the subject of cap- italized earnings values, the report observes: “In the case of a building already up and producing earnings, it is a simple matter to compute this value with a real degree of confidence. Where a construction loan is contemplated, however, the capitalized earnings value cannot be based on an earnings experience, because obviously no earn- ings will exist until the building is actually up. These earnings, therefore, must be estimated. In cases where large and responsible concerns have contracted for space on long time leases and a large percentage of the total available space has been. leased in this manner, it is possible of course, to arrive at a much more accurate estimate of prospective earnings than would be the case were the building to depend on reaching normal occupancy through the ordinary course of inter- esting a large number of smaller tenants. “Until the building is actually completed, op- erating and seasoned, it cannot definitely be told whether or not it is to be a profitable investment. ARCHITECTURAL ENGINEERING AND BUSINESS Part Two For that reason your Committee believes, with last year’s Committee, that in the case of ap- praisals to be used in connection with construc- tion loans no added value for capitalized earnings should be given. In the case of an established improved property, it is sometimes found that an added value beyond the physical value is possible because of an attractive earning history and ex- pectancy, but in the case of a project under con- struction the expectancy is not backed up by a history of earnings and should receive no added capitalization. For purposes of a bond issue your Committee believes that the loan should be made on the physical value of the property, land and buildings, this value being checked with the cap- italized earnings value as a check on the sound- ness of the entire project. Naturally, if the c italized earnings value is less than the physic the project is unsound. “These points cover, your Committee believes, the main points of trouble in appraisal of con- struction projects for purposes of a bond issue. The appraisal itself, of course, should be full and informative; in fact, should place the lender in possession of all information needed by him in determining the quality of the loan. It should for the information of the investment banker, cover in addition to the expected and customary data, these details : 1. Need for the building (including a complete survey of the district). 2. Physical value of land. 3. Physical value of buildings (giving the separate items making up the totals). 4. Estimate of earnings. 5. Capitalized earnings value. 6. Final appraisal value. This report is based on representative opinions collected from various parts of the country, and the recommendations suggested apply to practice in no one locality, but to the country in general." In this report of the Investment Bankers' Asso- ciation are seen the outlines of a real standard,— a standard formulated on the basis of scientific study of facts, after obtaining the considered opinions of experienced men all over the country as to what the standards of appraisal should be. This standard is expressed in a few clear prin- ciples that can be applied in practice. Doubtless further refinement of this outlined standard may be needed, but the building industry might well consider adopting it, without waiting until someone invents a better. In accepting such a standard, it is essential to have an equally definite, uniform classification of security issues. Al- though the report is confined to bonds, there is no reason why its findings should not apply to stocks. Taking a broad view of the appraisal standard outlined by the Investment Bankers’ Association, al,

Page 40

April, 1930 THE one perceives that it rests (1) on a clear grasp at every point of the distinction between invest- ment and speculative risk in properties; (2) on the necessity of calculating accurately the specula- tive factor in appraising a specific property ; and (3) on admitting the fact that, in general, build- ings under construction and not rented in advance are decidedly more speculative than are income- producing properties. Obviously, building se- curities should be classified and sold to the public on this basis, with special reference to the third point—the speculative character of buildings under construction and not yet rented. Failure to recognize this principle is, I believe, the cause of much of the trouble with appraisals. OVER-CAPITALIZATION OR OVER-PRODUCTION. Default of bond issues is often ascribed to over- capitalization, but failure to rent is often at the bottom of loss in the investment value of a build- ing. The most careful appraisal survey of trend of growth, rental conditions, etc., in a district can- not guarantee that a building will not be put up that will not rent. Practical experience proves that assertion. Failure to rent is caused not merely by a number of minor, intangible factors that cannot always be foreseen, but,—much more im- portant,—by the over-production in a district of competing buildings, coming on the rental market soon after the building in question was completed. The promoters of the later buildings causing the over-production should not have built at all, but nevertheless, they often do, and in practice there seems to be no way to stop them. Results of this all too common experience are seen in the indica- tions of surplus production of both hotels and office buildings in some sections. The report of the Renting Committee of the National Associa- tion of Building Managers and Owners says that the conditions of increasing vacancy percentage in the office building field of the country as a whole have been getting worse for the past few years; and that to a condition of 11.55 per cent of vacancy in October, 1929, in the 1676 struc- tures surveyed, almost another 10 per cent of office space is coming on the market in 1930. Now, why did not the appraisers of this latest crop of buildings foresee this situation? PREVENTING FORECLOSURE. More important still, would a conservative capitalization be sure to keep all these structures from foreclosure? Tt might, as far as bonds are concerned, but junior and eguity issues could scarcely escape a heavy shrinkage in value. Here I think is a good argu- ment for the new finance. There should be less over-production of buildings where responsibility for the value supporting junior long term issues is accepted by the issuing house. Many people believe that the first mortgage institutions do not worry too much about the investment value of ARCHITECTURAL FORUM 629 buildings оп which they lend. Their immediate interest is to see that the percentage of building cost is so low that even a great shrinkage in value will not endanger their mortgage risk. The promoter takes the risk of over-production. He takes the risk all too frequently, and as a result the industry is much too defenseless against the ravages of the weak marginal producer. There- fore, until the building industry, through more accurate statistics and knowledge of expansion trends in districts and cities, is in a better position to protect itself against the ravages of the mar- ginal producer, we cannot well deny the statement in the Investment Bankers’ Association report, already quoted. "CONSTRUCTION BOND: "Until the building is actually completed, operating and seasoned, it cannot definitely be told whether it is to be a profitable investment." This being the case,'is it correct to label a security issued as a construc- tion loan a "mortgage bond" or a “first mortgage bond" with all the implication of 100 per cent investment value that is associated with these terms? Possibly the answer is “Yes, if the per- centage of cost represented by the issue is low enough." Even here, | suggest the defense that the use of the words “mortgage” and "first mort- gage" bonds is a bit too technical. In practice, loan issues become much less frequent and less spectacular in their injurious effect on the build- ing industry through loss of prestige with the investing public. Until that day, it seems justifi- able to ask the question, Is not the correct term to use of a security issued for purposes of a con- struction loan, a "construction bond" ? That would be fairer also to the institutions that market to the public conservative first mort- gage bonds or certificates, guaranteed or not by the issuing company, on income-producing prop- erties, One of the very safest investments of this class are the guaranteed first mortgage certificates of the “old line” first mortgage institutions, issued against first mortgages on a number of income- producing properties. Defaults on this class of securities have been practically unknown for a number of years, at least; they are excellent in- vestments for that large class of "widow and orphan" investors to whom the building industry wishes to appeal, and these issues are entitled to use the "conservative" label. STANDARD CLASSIFICATION OF REAL ESTATE Sr- CuRITIES. It would seem, then, that the building industry, for its own protection as well as for that of the public, should establish a uniform standard for labeling secürities, somewhat on this basis: 1..4 Mortgage Bond, or a First Mortgage Bond, guaranteed or not in either case, should be issued on a conservative basis against income-

Page 41

630 producing properties, either singly or in groups. 2. If bonds are issued for the purpose of con- struction loans, they should be labeled Construc- tion Bonds. Where construction loan is "guar- anteed,” a Debenture Bond of the company mak- ing the guarantee should be the correct form. 3. И desirable, issues floated for purposes of a construction loan may correctly have provisions for conversion into various classes of securities issued on an income-producing building, and would be Convertible Construction Bonds. An example is the 6 per cent notes of the Henry Mandel Associates, convertible into 6 per cent accumulative preferred stock (which is preceded by a mortgage) of the building within one year after completion of the building, etc. 4. After the building is completed and its in- come is proved, it is correct to issue conservative First Mortgage Bonds against it; Preferred Stocks representing junior mortgage portions of earnings and physical assets values ; and Common Stocks against the earnings and equity. 5. Standards for issuing preferred stocks against buildings under construction and not ye well occupied by tenants, should be thoroughly protected. It would seem that this suggested standard for labeling building securities is fair and accurate; that it is adapted to the special nature of rea estate, that it is based on the standard of appraisal of the Investment Bankers’ Association, and finally that it is in accordance with common usage both in financial quarters and among the general public, since Wall Street is usually rather carefu about placing the right labels on its various issues. The character of preferred and common stocks should be as clearly settled as part of any stand- ard of classification. In Wall Street, a preferred stock is usually considered to be a fixed income share, junior to bonds only (or mortgages in the case of real estate), or else it is the senior security where there are no other obligations. It may be secured to some extent by physical assets, and in most buildings it necessarily would be; but in any case it should be amply protected by a good margin of earnings. As to common stocks,—there's the rub. The star of the common stock has risen high in the zenith in recent years, except that, for a few days in October and November, 1929, many people wondered whether it had been knocked out in collision with a comet or the sun. The sup- posed collision, so our financial astronomers are informing us, was no more than an eclipse, and the star of the common stock is not on the wane. Doubtless that is true, but one cannot escape a suspicion that the “new finance” has not fully proved its case. я ARCHITECTURAL ENGIN Part Two EERING AND BUSINESS COMMON SHARE VALUES are based chiefly on earning power and public confidence in the man- agement and in the competitive strength of the enterprise. There is much to be said for the theory that judicious purchase of common shares in our great enterprises, which participate in the expansion of the country, is a desirable method of increasing one's income in an era of rising liv- ing standards. Оп the other hand, the very intangible nature of common stocks makes agree- ment on their “normal value" more difficult even than is real estate appraising. The only way so far discovered to establish their value is through the consensus of opinion of experts and public. A security exchange provides the only practical yardstick for appraising its values. The prices fixed in the trading represent the consensus of both public and experts as to the merits of any stock, or in other words, as to the future pros- pects of the real estate properties on which the stock is issued. Thus in its trading a securities exchange is useful in appraising individual stocks and classes of stocks. Nevertheless, the common stock still fluctuates to an extraordinary degree at times. Tur PRESENT TREND. I believe that the con- struction interests of the building industry will welcome the proposal to standardize appraisals and to label correctly all building securities. И will remind them of the extensive collaborative movement in the construction industry, aided by the U. S. Department of Commerce, under Mr. Hoover's secretaryship, to standardize building products, and to adopt a clear, just and uniform system of grading construction materials, follow- ing the method first used in the steel and cement industries, The success of this effort has saved hundreds of millions of dollars for the industry and has created confidence in its products. It is possible that architects, engineers, construction men, material manufacturers and supply houses will not think that the trouble and effort required to make the change will be a valid argument against making the attempt. They will recall that the same arguments were advanced against the movement to establish grading of materials of construction. When, similarly, a uniform standard of apprais- ing properties is established, recognizing the basic distinction between investment and speculation; and when a fair and reasonable system of label- ing securities, also based on the distinction be- tween speculation and investment, is adopted, then, supplied with these two standards, the build- ing industry will itself understand accurately its complex finances. And it will be in a position correctly to inform the public. The building in- dustry should take this step for its own protection.

Page 42

THE SUPERVISION OF CONSTRUCTION OPERATIONS BY WILFRED W. BEACH CHAPTER 15, MASONRY (Continued) Eorror's Nore. In the discussion of the supervision of the masonry, Mr. Beach, in the previous installment, pub- lished in the February issue of THE ARCHITECTURAL Ео- RUM, was discussing the trouble that frequently arises in the laying of brick. When it is specified that the brick must be "drenched" in warm or dry weather, the duty of the superintendent to enforce this is sometimes difficult, Mr, Beach here continues the discussion of this phase of masonry construction. HERE is therefore, a constant inclination on the part of masons to want less water applied to such materials than the superintendent under- stands is essential. Again, the experienced man makes use of his knowledge and tact to establish correct procedure. “Drenched just before place- ment" does not mean that each brick shall be drip- ping or soaking wet when the mason picks it up, but drenched in the pile before being loaded into hods or barrows. Then, if not laid within half an hour, they will, if exposed to hot sunshine, need re-drenching. After a rain, they may not need further wetting all day, though it may be found that only those in the outer tiers absorbed the rain, the remainder being still too dry. АШ of this is up to the superintendent to determine. He knows that each brick or tile must be neither too wet nor too dry, that there is no danger of the former, but that he must enforce the latter demand, or expect to suffer the humiliation later of seeing his employer picking out worthless mor- tar with his finger nail. But he also knows that, if he goes a shade too far in his demands, the brick layers are likely to quit in disgust, and the work be at a standstill, and then delay will result. Our superintendent also experienced difficulty in getting some of the masons to "shove" the brick as laid. This was distinctly called for, and is considered the only sure way to guarantee that а wall will be solidly built; but it is easier just to lay the brick in the mortar and tap them down, depending entirely upon "slushing" in the mortar to fill the vertical joints. If these have been squeezed down to 34 inch or so, the act of slush- ing will not drive the mortar in very far. Addi- tional requirements were that the brick must be "bonded completely through the wall every sixth course," and that "all walls shall be laid to a line inside and out, except that all brick and tile walls that are to be plastered need be laid to a line on one side only. Al walls shall be carried up true and plumb and, as nearly as possible, at uniform height around the building. АП walls shall be securely braced and shall be covered on top when work on them is interrupted." Various bondings for brick facing are in vogue, depending upon the demands of building ordinances and the requirements of design. If it is to be bonded to the backing by means of metal anchors, the in- spector must see that these are of the kind and quality specified and properly spaced and placed, ordinarily, one or two to each superficial square foot of wall. If the facing is against concrete, the anchors must be inserted in the forms. CHAPTER 16 TERRA COTTA, CUT STONE AND PRE-CAST STONE HE production of terra cotta in the United States is in the main confined to a few com- panies whose standing is well known. Architects are therefore accustomed to award such work to concerns in which they have confidence, prefer- ring not to take the chance of delaying construc- tion by having to reject members that might re- quire weeks to duplicate. Terra cotta is a fa- vorite material with many designers because it so readily lends itself to ornamentation and to the use of desired colors and textures; and yet there is no material brought to a job which a novice is less capable of judging. The writer has seen samples of terra cotta, reputed to be 4,000 years old, and still in good condition. Не has also witnessed the disintegration of terra cotta that had not lasted through a decade. One is quite naturally inclined to favor those manufacturers whose product has lasted longer than ten years. A superintendent's interest in the subject may begin with an inspection of shop drawings (in- cluding full-sized details made at a scale of 13 inches to the foot, to allow for shrinkage in the kilns) or with a trip to the plant to expedite de- livery. * The shop drawings are reviewed for general and specific compliance with the archi- tect's details, but it is well likewise to observe the scheme of numbering on the setting diagrams. Members numbered consecutively, regardless of location, are not easily identified by sorters. Each course should have its individual number or letter, following which the next digit should be one that will locate the member with fair accuracy, some- *See discussion of "expediting" in chapter preceding. 631

Page 43

632 where in that course, А system of numbering which would locate a block marked “С-46” im- mediately above “B-21” means a great deal of extra work Гог the sorter. The better designation would be a system that would locate “3-С-46” over “2-C-45, 46 or 47" ; the first digit referring to the course, the second to the pier or spandrel (or whatever), and the third to the exact loca- tion. With the exercise of a little tact, the man- ufacturer may be persuaded to so change a poor numbering system as to cause worth-while saving of time and annoyance at the site. Checking of shop drawings and the expediting of materials are functions of the superintendent only when specifically directed by his employer, and yet he is supposedly fully capable of attend- ing to them when called upon to do so. In any event, he must make himself familiar with all drawings and must keep posted as to the progress of material through factories and yards and to the premises, In addition to internal defects possible in terra cotta, it is subject to serious deformations in burning and, due to its extreme brittleness, it demands most careful handling. After being taken from the kiln and allowed to cool, each piece is examined for serious checks and inequalities, then laid out on the fitting floor and fitted against its adjoining members in the structure. Ií its de- fects are slight, they are ignored, or edges may be cut or ground to produce a fairly even joint of the size called for. There is an awkward chance here of there being disagreement between maker and architect, but most producers have learned not to take too many chances (having an eye to their reputations), and most architects have learned not to be too particular on the subject of terra cotta, but to accept it for what it is. This is especially true for work above the first story, where minor defects will not be discernible. Terra cotta is most difficult when intended to produce long straight lines in belt courses and in fluted columns, pilasters and the like. Owing to limita- tions in the burning, the blocks are generally from 24 to 30 inches in maximum dimensions, and the edges are not always absolutely straight. Ex- perienced setters will compensate for imperfec- tions in the laying, if not too serious,—and, in order to keep going, also those that are quite serious,—if permitted. It is here that the judg- ment of the superintendent is brought into play, —and he should be very sure of the stand he is about to take,—before he takes it. Pieces of terra cotta are rejected because of (1) chipped edges, (2) crazed surfaces (hairline cracks in the finishing), (3) undue warping of plain surfaces, (4) crooked edges, (5) too much or insufficient allowance for jointing, (6) de- formations preventing good alignment, (7) poor ARCHITECTURAL ENGINEERING AND BUSINESS Part Two WAZ 7 ІІ” = — towar Chord| of Truss y si узу: 4 SECONDO ANO THIRD ศั ฑา ร ร ร FLOOR CONSTRUCTION i "nuno; Ш.Ш FIRST FLOOR CONSTRUCTION Tile Furring Anchor tn Zach Joint. SSRN KINT $ SSS AT SS Wall, Floor and Roof Section of School House modeling, and (8) failure to accord with samples as to texture, color, etc. But, since none can be counted upon to be absolutely perfect, it is ob- vious that the man who passes upon it must know what he is about, else the work will soon be in

Page 44

April, 1930 turmoil, and be unnecessarily delayed, and the inspector forced to weaken on some of his de- cisions. The present tendency of designers to depart from the kind of masonry that demanded fine “buttered” joints and the near- perfection of "ach unit in a wall surface that was thereby made necessary, has materially simplified the terra cotta man's problems and, correspondingly, those of his critics. А terra cotta inspector must learn to be discriminating, rather than intolerant. Much of the foregoing applies as well to cut stone as to burnt clay products, but stone is even more diversified as to structure and density than is the manufactured material The chief con- cerns of the superintendent as to stone are to see that all that is supplied shall conform to sample, shall be practically free from defects when in place, and that it is properly set and anchored in the wall. Except in the case of strictly first class work, such as the finest of monumental construc- tion, one can perhaps be slightly less meticulous in the matter of permitting patching of chipped stone than should be the case with terra cotta, due to the fact that stone is a homogeneous material, whereas the facing of terra cotta differs ma- terially from its body; also because this facing, once broken, is permanently damaged. One of the most palpable inconsistencies confronting a superintendent is a specification definitely pro- hibiting any and all patching of cut stone on work where minor patching could well be left to his discretion, as the contractor is likely to sup- pose it was intended to be. This school building which we are discussing having been designed with brick facing and cut stone trim, our superintendent was absolved from any terra cotta worry, but he concerned himself most assiduously with the cut stone. In order to be properly efficient in the inspection of this material, it is essential that one possess a general knowledge of building stones, their chief char- acteristics, the various methods of preparing them for use, and the proper manner of handling the finished product until it finds its ultimate destina- tion in the structure. He cannot derive all this information from a set of specifications; but, having acquired а fundamental education on the subject as а background, he should then be able to interpret the terms of a particular stone speci- fication with comparative accuracy and fairness. Building stone falls naturally into three classes : (1) that used for rough work in walls or founda- tions, either in block, rubble, or crushed for con- crete; (2) that used for base courses and wear- ing surfaces; and (3) that used for other exposed and ornamental work. “The use of stone for foundation work, other than in concrete, has be- come so rare that no mention was made of it in the chapter on “Masonry.” However, in a few THE ARCHITECTURAL FORUM 633 locations close to quarries, stone walls are still being constructed. In building these, the chief concerns of the inspector are to see that the mortar is fresh, that it fills all interstices, that the stones are not so dry when laid as to be unduly absorbent, and that they are laid with good bond, both longitudinally and through the wall. Stone masons are accustomed, in such work, to follow their own lead and can generally be counted upon to produce surfaces of as good appearance as is feasible with the material at hand, but one finds them less concerned with the stability of a wall. These rough stone wall surfaces vary from the crudest of uncoursed rough quarry or split-faced work to carefully designed polygonal, cobble or range masonry, random or coursed. For any finished work, a sample wall should be approved in advance, as otherwise there is no fixed crite- rion, and each mason may use too much individ- uality. This will be apparent, not only in the size, shape and relation of the rubble or ashlar, but also in the thickness and character of the jointing. For base courses, steps, door sills, platforms and other members subject to hard usage, it is customary to specify granite unless, for reasons of economy, a sandstone or limestone of known hardness is used, Slate, bluestone, soapstone and other hard stones are also used for wearing sur- faces, but seldom for wall facing. For steps and door sills subject to extra heavy wear, granite, concrete, steel or cast iron are most commonly designated. Granite is ordinarily segregated from other cut stone work, owing to trade customs and to the frequent desire of the architect to com- pare its cost with that of a cheaper substitute. Due to its great density, its working is more dif- ficult and expensive than that of any other build- ing stone; but the characteristics of the finished blocks and their setting, items in which the in- spector is most concerned, are no different from those of other building stone similarly specified. Besides familiarizing himself with the working and shop drawings and the models (as discussed under the subject of "Terra Cotta" at the begin- ning of this chapter), the superintendent must have on hand approved samples of cut stone and granite, showing permissible color ranges and the textures of surfaces. These latter may be speci- fied to be any one or more of all the variants from the coarsest of rock-faced surfaces through sawed, sanded and the variously tooled textures, to the honed or polished finishes of marble and granite, The cut stone for our school house was of limestone with a sanded finish. It arrived in due time, and trouble started at once. One of the board members was interested in the trucking company which did the general contractor's haul- ing. This was the ordinary small city type of

Page 45

634 concern, with no special equipment for handling the stone off of the cars. Consequently, they made use of “dollies” (rollers) and crowbars on the first load, and several blocks had the mould- ings and arrises so badly chipped as to necessitate ordering substitutes. The mason foreman pro- duced the inevitable can of “dugan” (stone-patch- ing cement), and the setter did his best to so patch the damaged places as to render them in- visible. Тһе superintendent, nevertheless, re- jected all but a few pieces on which the spalling was trivial. He would permit no patching what- ever on projecting members. It was evident that the contractor had a charge against the trucking company, and therefore it was not long before the interested member of the board put in an ap- pearance. He insisted that the patching should be deemed acceptable and that the superintendent was too arbitrary in saying that some stone would pass muster and some would not; whereupon the superintendent declined to accept amy patched members and referred the whole subject to the architect. The latter, at the time of his next visit, supported the superintendent, and ай the damaged pieces were ordered replaced, since, in case of a law suit, it would have been difficult to establish just where the line should have been drawn. Con- fronted with this, the contractor advised the trucking company to consult a lawyer, to whom he made it plain that there would be money saved if the superintendent were persuaded to revert to his original stand, and not interfered with. This course was adopted, and the truck owners were thereby excused from making good the incon- spicuous defects. In this matter of handling, the superintendent found that the use of improper tools by truckmen was not his only cause for complaint. The weather being fair, they were likely to dump the stone on the soft ground, rather than take time to deposit it carefully on the specified planking, apparently oblivious of the fact that the next storm might cause serious staining. They were therefore taught to lay each stone carefully on well supported planks, in such manner that the numbering could be easily read, and that no fin- ished surface of any stone was turned upward or supported its own or other weight. Children at play (and laborers as well) have a fondness for using a row of cut stone or terra cotta for a raceway, especially оп muddy days. Damages from all such causes must be carefully guarded against, particularly, when the building operations are not protected by fences. The entire subject of the treatment of cut stone, its cutting, handling and setting, is so well and exhaustively treated in the "Specification Manual" of the Indiana Limestone Co. ( Bedford, ARCHITECTURAL ENGINEERING AND BUSINESS Part Two Ind.), that every building inspector and superin- tendent should by all means familiarize himself with that publication. This and the specifications for his particular work, combined with the afore- mentioned fundamental general education on the subject, will supply sufficient foundation upon which to base judgment of such material and its placement and protection. The experienced ob- server will closely watch the bedding and an- chorage of the stone, the alignment and thickness of the jointing, and, in the case of Indiana limestone or other stone subject to staining, the adequate protection of embedded surfaces by whatever method may be called for. Except for this latter precaution, the practice in setting cut stone is likewise that for terra cotta, except that heavier stone demands the use of a derrick, and that all cavities which occur in terra cotta within the outside plane of the wall must be well filled. Whereas cut stone is a load-bearing material, terra cotta is not, and this fact is not to be ignored. Terra cotta, therefore, demands closer attention to bonding, both by metal anchors (as detailed on shop drawings) and by the masonry backing, in order that it shall be truly integrant with the wall. In the setting, either material may vary, due to slight inequalities in successive course members. If not closely watched, a cornice (or other belt) course, the joints of which should center over brackets or other certain members, may be allowed to “crawl” to such an extent as to be an inch or more out of place at the end of a run. The setter will then want to trim a member to get back to position, but he must be compelled to re-lay as much of the course as is necessary. The man of experience also sees that lug sills are bedded at ends only, until time for pointing ; that no mortar or other material is permitted to carry weight on top of projecting mouldings; that the wooden wedges sometimes used by setters are thoroughly wet when placed; and that outside steps and platforms are not set until adjoining walls have received their settlement, if any. The footings under steps and their but- tresses (or cheek walls) are frequently (and unavoidably) disproportionate to those under bearing walls, and hence much care should be exercised in joining onto the latter, to obviate all chance of there being settlement cracks. Sometimes such joining is slotted, to permit slight settlement without damage. The door sills of the school were granite slip sills; the platforms and steps of concrete, with nosings of paving brick ; the buttresses of limestone: all of which con- struction was deferred until the exterior work of the building was otherwise completed. (Chapter 16 will be continued in the May issue of THE ARCHITECTURAL FORUM)

Page 46

BOOK DEPARTMENT "SMALL HOMES OF ARCHITECTURAL DISTINCTION" A REVIEW BY CLIFFORD WAYNE SPENCER OST members of the architectural profession are familiar with the purposes and services of the Architects’ Small House Service Bureau, but probably few realize the extent to which its plans have matured and the lasting effect its endeavors have had on the quality of American domestic architecture. For those who are unfamiliar with the Bureau, we might say that it is a non-profit erganization established by a large group of architects for the purpose of helping to im- prove the character of small house architecture in the United States. It is closely affiliated with the American Institute of Architects which exercises an indirect con- trol over its policies by being able to appoint a majority of the directors. It offers to home builders, who for any reason do not consider themselves able to employ the services of an architect, a service which, as far as it goes, is based on the best architectural practice. Most of the plans are contributed by architects gratis for the pur- pose of improving the quality of small houses from the standpoint of good appearance and construction. With many of the gifted architectural designers of the country contributing their efforts, it is not surprising that the Bureau has accumulated an excellent collection of house designs, each of which is a leader in its own par- ticular class. The Bureau has further added to its useful- ness by making careful selection from among these de- signs and publishing them in a volume for the use of prospective home owners, and incidentally of architects and builders everywhere. Here the man who is planning to build himself a house of not more than six rooms may find a design to fit almost any requirement that may gov- ern in his particular case, and if he is not able to avail T is not necessary to point out to archi- tects and architectural students the merits of this widely known work on the history of architecture. For several dec- ades it has been read and studied or used as a work of reference because of its be- ing authoritative, concise and well docu- mented with references and bibliographies. But it is sometimes possible to improve 521 FIFTH AVENUE A NEW EDITION OF A STANDARD WORK «A History of Architecture on the Comparative Method" By Sm Banister FLETCHER, F.S.A., Е.В.Т.В.А. 929 pages; 6 x 9% ins. About 3,500 illustrations. A4 $12 NET e= THE ARCHITECTURAL FORUM even a well known and standard work, and the History of Architecture, now appearing in its Eighth Edition, has been revised and enlarged, and considerable new matter has been added. The Eighth Edition possesses every valuable charac- teristic of the earlier editions, and it in- cludes, besides, the results of recent travel and research to increase its value. NEW YORK Unless otherwise noted, books reviewed or advertised in THE ARCHITECTURAL FORUM will be supplied at published prices. A remittance must accompany each order. Books so ordered are not returnable. 31

Page 47

32 THE ARCHITECTURAL FORUM BOOK DEPARTMENT himself of the actual services of an architect, either be- cause there is none within reach of his particular location or because he feels t fee, however small it be, is beyond his means, he may obtain from the Architects’ Small House Service Bureau а set of plans, specifications, details, lists of materials, contract forms and other working documents which will give him, up to a certain point, the services usually rendered by an architect, The Bureau strongly urges its clients to employ the services of an architect in supervising the execution of the work. The volume of course will be invaluable to the contractors and speculative builders as a source of ideas and plans for their work, and it is to be hoped that the architectural quality of such buildings will be im- proved in many cases by the use of these designs. In this review it is our purpose to consider the work of the Architects’ Small House Service Bureau, as typi- fied in the recently published book of designs, as it affects the individual architect. Many will say that by furnishing plans to home builders on a wholesale scale the Bureau is taking work away from architects who would otherwise be called upon to do it. As a matter of fact, he amount of money lost to the profession in this man- ner is so small as to be negligible, and the benefits which are derived greatly outweigh the disadvantages. In the first place, it is probably true that the designing of small houses, such as fall within the scope of operations of the Bureau, on an individual basis is highly unprofitable, and most architects do not care to engage in it at all. People who use the Bureau in most instances, if deprived of it, would not employ an architect in any case and would be forced to build without plans or else to secure them from hat an architect's Part One some one of the great wholesale planning organizations, and the quality of the design would be quite likely to be far inferior to that which could be had through the Architects’ Small House Service Bureau. Another Белев which architects receive from the work of the Bureau results from the publication of a large number of designs representing the best efforts of a large group of highly skilled architects. These furnish precedent and ideas for use in their own work, be it in small or large houses. The present volume is in itself a cross section of the best in small house architecture for all parts of the country from Maine to California. It furnishes ideas easily adaptable. As is to be expected in a volume of this sort, the out- standing feature is the illustrations. Floor plans of course are most essential and are clearly reproduced in all cases, giving an infinite variety of arrangement for houses of all kinds up to the six-room limit. Elevations and per- spectives are presented either as black and white render- ings or from photographs of buildings actually structed from the plans of the Bureau. Interiors and close-up details of interesting features add greatly to the charm and practical value of the work. In some instances variations in the plans are possible and alternate schemes are presented. Each example is accompanied by a brief discussion covering such important problems as the type of construction and advice as to materials to be used. Much lee-way is allowed in this respect, and in many cases two or more houses are built from exactly identical plans but of different materials with considerable varia- tion in the appearance of the buildings. In one or two cases where this has been done views of both houses are shown. These should be of great interest to the architect, con- Skyscrapers and the Men Who Build Them by Colonel W. A. Starrett "Curiously enough, this is the first full-length treatise on skyscrapers to be published in America. . . . Опа! Colonel Starrett took his pen in hand, no one had thought to tell the story of it—that is, its story as structure, not as mere work of art. The competence of the author goes without saying. He and his brothers have built more skyscrapers than any other group of men, and have probably had a larger share than anyone else in the successive advances of the craft... . The American Mercury. "Colonel Starrett has compiled a book which should do much toward crystallizing ideas upon the subject of modern building. His is a thoughtful and yet entertaining story of the building of the huge skyscrap- ers which more and more are coming to be an important phase of our urban civili- zation. . . The building of skyscrapers is to the ordinary man a romantic subject. Colo- nel Starrett has written a romantic story." —Boston Transcript. | Arehitectural Forum It is out of this rich and first-hand knowledge that Colonel Starrett Writes."—H. L. Ж Mencken in "Here is set forth, for one who would know something of it, the story of the sky- scraper, its small beginnings and triumph- ant development, the more and more daring answers to the problems set up by earth, air, water and building laws, the extraor- dinary skill required to assemble the mate- rial and organize the labor that form the fabric, the many diverse and intricate tech- nical processes that play a part. It is in- teresting reading . . . to any опе... alive to this fascination of the building of a scraper.”—Philadelphia Record. пи ши пи ша ин nmn ни ип ши ก 521 Fifth Avenue. New York ШЕ Unless otherwise noted, books reviewed or advertised in THE ARCHITECTURAL Forum will be supplied at published prices A remittance must accompany each order. Books so ordered are not returnable.

Page 48

April, 1930 since they afford an interesting illustration of the effect that the choice of materials may have on the appearance of buildings. The suggested interiors as shown in small sketches and illustrations from photographs for many of the houses are rich in ideas, and in all ca are strictly in keeping with the exterior characteristics of the buildings. Many treatments of the all-important mantel and its surroundings and details enrich the ma- terial included in the volume. There are also details of effective dormer treatments, close-ups of simple but at- tractive entrance door details with their railings and steps for all styles of houses, balconies for the Spanish type of house and other details to go with nearly all the examples shown. Naturally in such a varied collection there will be some designs which will not appeal to the individual taste of all who see them, and the trained and discerning eye of the architect will discover many fea- tures and details of which he may not approve. However, it is by the v detection of such defects that his own taste is improved, and he will be prepared to guard against them in his own designs. Picturesqueness has al- been the keynote in the design of small houses, and ses it has been responsible for much This quality is much in evi- dence in the pages of this work, but in practically all cases it has been subjected to such dignified restraint that the collection of houses cannot fail to be generally pleas- ing even to the most exacting taste. The arrangement and grouping of the examples are particularly good. Starting with several little architec- tural gems in the form of three-room cottages, the size and importance of the houses develop until the limit of six major rooms and $10,000 cost is reached. Nor has style been neglected. АП the popular periods and national styles are represented, including the Colonial, English, French, Spanish and Italian, and there are even one or two based on more unusual precedent, Such a house is a charming little, five-room cottage which takes its prece- dent directly from the Swiss chalet. Every detail is care- fully worked out into as picturesque and convenient a modern home as one could wish to find. The plans are made still more helpful by being grouped in the index under practical headings, —“Plans for Narrow Lots," "Plans With Living Rooms Across the Front," “Plans With Living Rooms at the Side," "Living Rooms in Miscellaneous Positions," “Plans with Bedrooms or Space for them on Two Floors," *Plans Without Dining Rooms." All the million and one little improvements that go to make the modern small house convenient and at- tractive are presented in some one of the many illustra- tions, and countless suggestions for making the most of a house are made. For instance, there is an illustration showing how the space in an attic high under the rafters may be transformed into a bedroom of the greatest charm imaginable and at the expenditure of very little money. With its exposed studs and rafters and pine boarding it would make an ideal setting for early Amer- ican furniture, and even the collar beams are made to play a part in the decoration. As the Architects! Small House i sureau is constantly having new designs sent in, the editor of the volume has included some plans and views received after the book was partly made up. These were felt to be so unusual that it was decided to add them to the already large collection. They are shown at the end of the volume and add greatly to its value. w. when carried to exce that is trash and ugliness vice Unless otherwise noted, books reviewed or advertised in THE ARCHITECTURAL Forum will be supplied at published prices. A remittance must accompany each order. ТНЕ ARCHITECTURAL FORUM BOOK DEPARTMENT Small Manor Houses Farmsteads in France By Harold D. Eberlein and Roger W. Ramsdell Chateau de Misery, Cote d'Or N all the wide search for architectural types in which to design and plan the American home, there has been found nothing more beautiful and appropriate than what is called "French Provin- cial" the term applying to the better order of farm houses, manoirs, and even to minor cha- teaux. It is a type full of graceful informality along with the touch of dignity or sophistication which renders it just a trifle formal; it is expressive of eighteenth century charm, and it suits admirably the needs of the present-day builders of suburban or country homes. In the refined and slightly reti- cent exteriors of the old French country houses, much emphasis is placed upon excellent architec- tural lines, while their interiors show carefully ar- ranged and spacious rooms with well placed chim- neypieces, doors and windows. This excellent and authoritative work should be in the library of every architect whose practice in- cludes work of any kind of residence character. It brings to the attention of American architects a type which is fresh and new without being freak- ish. It includes 254 illustrations from original pes ag ba showing subjects complete as well as in great detail, together with many measured draw- ings and perspective plot plans. Flat Quarto (7% x 11 ins.), bound in handsome library blue buck- ram, stamped in gold, uncut edges with gilt tops. In a Box—Price $15 THE ARCHITECTURAL FORUM 521 Fifth Avenue New York Books so ordered are not returnable. о CA

Page 49

THE ARCHITECTURAL FORUM BOOK DEPARTMENT SHOP FRONTS English, American and Continental Examples Edited by FREDERICK CHATTERTON A “у of the modern shop front, drawing for inspira- tion on the fine old fronts which still exist in England, France, and other countries of Europe. The volume includes in many instances plans and details. This is a work of icd E to architects called upon to plan and design the facades to small buildings, mak- ing them practical as well as architecturally attractive. 104 pp., 934х12 inch. Price $7.50 THE ARCHITECTURAL FORUM 521 Fifth Avenue New York A Valuable Time-Saver for the Architect in Getting the Ideas of His Client as to Style HIS new collection of photographs and floor plans of 250 artistic, modern homes will prove an interesting addition to the library of the architect who is asked to design houses of six rooms or less. It contains descriptive text regarding each house, with large views of interesting details. All were designed by compe- tent architects. When some friend asks your help, on a house under $10,000, just turn to your copy of Every type of house is offered: for narrow lots, with bedrooms on ground floor, with living rooms across front and at sides, without dining rooms, with bedrooms or space for them on two floors, etc. There is a detailed discussion of a model farmhouse. Among the architectural styles represented are Colonial, Dutch Colonial, Spanish, Italian, Modern American, Georgian, and Tudor; the finishes include clapboard, face and common brick, Ше, shingles, and stucco. — MÀ == ARCHITECTURAL FORUM 521 Fifth Ave., New York. | Enclosed find $5.00 for "Small Homes , of Architectural Distinction," Send to 278 Pages, 87% x 12% Inches. Cloth $5.00 Postpaid. Name . Address Part One The architect who is called upon from time to time to design a small house will find that a copy of this work will be a great aid in ascertaining the wishes of his clients and will be instrumental in establishing a starting point from which he may develop the project in accord- ance with his own ideas and to suit the wishes of the owner, In this way a great deal of time will be saved and small house design be made much more profitable. The text descriptions accompanying each of the 250 plans for homes are full of good advice for the home builder, and much can also be learned by professional builders and planners as to the advantages of the various styles of houses and as to their suitability to specialized condi- tions. The work of the Small House Service Bureau has already had a marked effect on the quality of do- mestic architecture, and the publication of this new volume is bound to increase immeasurably the influence for good that this organization exercises in its special field, The book is especially timely, since all indications seem to point toward greatly increased activity in this de- partment of the building industry in the near future. Builders and architects who have copies of it in their libraries will be in a position to take advantage of all opportunities and give up-to-the-minute advice and sug- gestions to their clients. It is so seldom that we come across a so-called plan book in which the designs are not either freakish or merely dull that we feel sure the pres- ent volume will prove very popular with homebuilders. SMALL HOMES OF ARCHITECTURAL DISTINCTION. А Book of Suggested Plans Designed by the Architects Small House Service Bureau, Inc, 278 pp. 812 x 12 ins Price $5. Harper & Brothers, New York. Small Homes of Architectural Distinction Please Use Coupon at the Left Unless otherwise noted, books reviewed or advertised in THE ARCHITECTURAL Forum will be supplied at published prices. A remittance must accompany each order. Books so ordered are not returnable.

Page 50

Фф THE EDITORS' FORUM $ NEW YORK THE EVER-CHANGING By WILLIAM SCHACK N writing of the New York Life Insurance Building about a year ago, I noted that when I suggested to the telescope man in Madison Square that he turn his instrument away from the heavens toward this creation of Cass Gilbert's he looked at me as if I were crazy. My simple intention, of course, was to increase his business, but he did not understand it so. Now I note that the man in Bryant Park has pointed his telescope at the towering top of the Chrysler Building just nearing completion and is making money on it. The peaks of the six gilt obelisks which crown the new Lefcourt-Colonial Building are turned by the morning sun into six glowing torches. If those tall structures which do not sufficiently emphasize their verticality are faulty in principle, they do at least provide us with “castles in the air.” Among the new white office buildings which surround it, the Brunswick Building at Fifth Avenue and 26th Street looks hopelessly old fashioned. Its red brick alone would date it as an antique. And how can a 13-story structure pay so little homage to the skyscraper principle without incurring such a penalty? Its bracketed cornice above the second story, the frieze at the third, the bal- cony at the 12th floor running the entire length of the building, and the cornice with its decorative crest,—all are emphatic horizontal lines to compass the building in- to a formal unit firmly attached to the ground. It thus seems like an ancient monument. Nor is it only sky- scrapers embodying the principles of a new style in architecture which possess this insidious advantage. The tall apartment structures on Fifth Avenue north of 59th Street also make their formerly distinguished neighbors, — Renaissance palaces,—seem somewhat puffy and ridic- ulous. As most of these tall buildings have no architec- tural distinction beyond that of size, their superiority is merely that of contemporaneity, of fashion in a narrow sense, as, in a period when long dresses are worn, every long dress,—no matter how indifferently designed,— makes every short dress of a preceding era,—no matter how well designed,—seem ridiculous and old fashioned. Architecture is the most obliging of the arts. It builds what must be built and asks no questions. It did not say to the Pharaohs: "How can you have the colossal vanity to demand such pyramids for your tombs, when the worms and vandals will get you anyway?" Instead, it set to work on a construction that presumably would keep worms and vandals away. It did not say to the feudal lords: "Why do you, with drawbridge, tower and battlement, shut yourself off from a world you had bet- ter learn to know?” Instead, it set to work to build the most secure and handsomest drawbridge, tower and bat- tlement that it knew how to build. It did not say to Louis XIV or the two hundred princelings who imitated him: "Do you really find such bejeweled palaces fitting for the homunculi who fill the world and whom you have such fair samples here?" Nor does it ask today, “Must you pile up 50 stories with a Gothic ardor to house offices and showrooms of dealers in cotton goods and real estate, millinery and radio supplies, towels and tin cans, publishers, and dealers in hot water bottles ...?” It sim- ply goes ahead and builds, It is only during the last few years that the stressing of the vertical as the basic prin- ciple of skyscraper design has been fully accepted by any considerable number of architects. One can hardly think of its purity being infringed on already. Yet the new Stewart Building, for example, demonstrates that a tall structure need not emphasize the vertical very much. The argument depends on the definition of "tall." Twen- ty years ago anything beyond five stories was tall. Now there are a great many houses of 12 and 14 stories, With 50-story buildings going up, our standard of tallness is once more stretched, and it becomes difficult to say when а building is tall enough to be known as а skyscraper. Against a 50-story edifice shooting upwards, may a 15- story structure, thus hopelessly outdistanced, logically revert to Greek temple earthiness? Perhaps the less tall of the skyscrapers of the future, may, from choice, adopt more horizontal modifications of design similar to those made out of compromise before the skyscraper principle was accepted. Such a turn would be a powerful symbol of our age, for purism has in the past died much harder. When the raking cornice of the Doric pediment was first broken up, it shocked the purist and no doubt also a good many who did not consider themselves purists, That hor- rid gap where there used to be the apex of an inevitable triangle? Impossible. But the gap was filled with an urn or a cartouche ; the broken ends were composed into а curve; the "fragments" of the raking cornice in time also took wing and curved. Soon the pure Doric pedi- ment was itself an archaic looking thing, impotent to scold its changed descendants. But the change took sev- eral centuries. We do things much more quickly now. ROSTER OF CALIFORNIA ARCHITECTS NE of the most complete books of its kind, the re- vised pocket edition of The Architects’ Directory of California, has just been issued by Cornell T. Malone, of the Los Angeles Builders’ Exchange, Chamber of Commerce Arcade, Los Angeles, and Pacific Building, San Francisco. The new edition is now ready, The new Directory lists southern California architects alphabetically, giving individual and firm names, also names of architects connected with firms, as well as the names of licensed architects employed as designers, draftsmen or superintendents, Following the alphabetical list, practicing architects in the Los Angeles downtown district are arranged by streets and buildings, giving the names of the architects in each building, together with room numbers, names of designers, specification writers, draftsmen, mechanical, heating and ventilating, electrical, structural and consulting engineers and superintendents with each firm as well as those engineers practicing inde- pendently, and the class of work specialized in is named.

Page 51

40 ARCHITECTURAL DESIGN Part One — ระ A s BENE: OF MANBOS RN BLE ts- H, Craig GOOD BUILDINGS DESERVE GOOD HARDWARE The Bank of Manhattan Building, newest member of that famous group of New York office buildings which use only Good Hardware-Corbin— throughout. P. & Е. CORBIN Е NEW BRITAIN, CONNECTICUT, U. S. A. The American Hardware Corp., Successor New York Chicago Philadelphia

Page 52

VOL. LII, No. IV THE ARCHITECTURAL FORUM CONTENTS PART ONE—ARCHITECTURAL DESIGN APRIL, 1930 Cover Design: Interior, Chicago Civic Opera House The Editors’ Forum Chicago Civic Opera Building ARTICLES Chicago Civic Opera Building Color and Curtain, Chicago Civic Opera House Chateau D'O A Venetian Villa at San Antonio Cottages of the Cotswolds Chapel, Kent School, Kent, Conn Beach Clubs e oo % PLATE ILLUSTRATIONS Chicago Civie Opera Building Funeral Chapel at Long Beach, Cal. A Venetian Villa at San Antonio From an Oil Sketch by Chesley Bonestell Page 39 . From ап Etching by Anton Schutz Frontispiece Author Page Anne Lee 491 497 Arthur H. Gilkison — 531 Edmund B. Gilchrist 537 Harold Donaldson Eberlein 587 Kenneth M. Murchison 594 Architect Page Graham, Anderson, Probst & White 499 Hugh К. Davies 515 . William McKnight Bowman 539 PART TWO—ARCHITECTURAL ENGINEERING AND BUSINESS Chicago Civic Opera Building ARTICLES Structural Design of Chicago Civic Opera Building Acoustics of the Chicago Civic Opera House Stage Equipment and Lighting Electrical Installations, 20 Wacker Drive Building Mechanical Equipment, Chicago Civic Opera Building Policy and Opinion Recent Airplane Hangar Construction in Europe Housing Business Organizations for Efficient Operation Standardizing Appraisals Supervision of Construction Operations Frontispiece Author Page Magnus Gundersen 595 Paul E. Sabine 599 . R. D. Berry 605 Е. Loucks 608 C. 4. Frazier 610 615 Eugene W. Stern 616 Harry Arthur Нор! 623 John Taylor Boyd, Jr: 627 Wiljred W. Beach 631 PARKER MORSE HOOPER, A.LA., Editor KENNETH K. STOWELL, A.LA., Managing Editor ARTHUR T. NORTH, A.LA., Associate Editor Contributing Editors: Harvey Wiley Corbett; Aymar Embury II; Charles С. Loring; Rexford Newcomb; С. Stanley Taylor; Alexander B. Trowbridge Тик ARCHITECTURAL Forum is published monthly by Building Division, National Trade Journals, Inc. 521 Fifth Avenue, New York. . Redfield, Chairman of the Board and Treasurer: How- ard Myers, President and General Manager; John Thomas Wilson, Vice-President; James A. Rice, Vice-President; C. Stanley Taylor, Vice-President; Henry J. Brown, Jr., Secretary. Yearly Subscription, Payable in Advance, С. S. А., Insular Possessions and Cuba, $7.00. Canada, $8.00. Foreign Countries in the Postal Union, $9.00. Single Copies: Quarterly Reference Numbers, $3.00; Regular Issues, $1.00. АП Copies Майей Flat. Trade Supplied by American News Company and its Branches. Copyright, 1930, by National Trade Journals, Inc.

Page 53

а C ———— dÁÀ— ———— 2 тт >" 42 Ror row from these Banks А 3 ik AA The National Sav- ings Bank of the of Albany, N.Y. Halsey, McCormack and Helmer, Inc., Architects... Insert shows how easily Telesco can be ad- justed to various ceiling heights.Car- penter is raising telescoping posts and securing them. to the ceiling strips. a ARCHITECTURAL WANA ma ka SN N - А М NN AS DESIGN .. thi style trend in interior woodwork....... HREE bank buildi recently chosen the ва for partitioning offices. The Irving Trust Co. chose walnut for their new building at Numbe r One Wall Street. The Baltimore 1 now the №: viewing the emer Ht every othe er nationally known wood and steel partition manufacturer in the country, has chosen walnut, too. in a row have ne kind of wood Each of these bank buildings chose the same kind of walnut partition. Each of them New Telesco. For New Tele: stheonly artition that offers ric ed American walnut at the cost of sorry imitations that fool nobody with their paint or stain or photo- graphie similarity. For 21 years Telesco has been the most practical p: . the only partition with telescoping post illustrated above. And New Telesco can be erected or re-erected tition made so quickly that tenant changes can easily be taken care of overnight. It is protected by a special scratchless lacquer finish; by an exclu- sive base that is waterproof andacid proof. No wonder users say New Telesco is the least ex- s the most beautiful partition, or booklet describing New Telesco. HENRY KLEIN ๕ CO., Inc. Established 1909 40-46 West 23rd Street + + + New York City Branches or representatives in principal cities Factory: Elmhurst, New York TELESCO || PARTITION | IT TELESCOPES pensive as wel Write Part One

Page 54

We take great pleasure in an- nouncing that on the first of May ROYAL CORTISSOZ will become a contributor to THE ARCHITECTURAL FORUM. This brilliant writer and recog- nized authority on architecture and the allied arts will write each month on a topic of im- mediate interest and inspiration to the profession. For the sub- ject of his first article, in the May issue, he has selected, “The Vitality of Tradition." PARKER MORSE HOOPER, Editor

Page 55

kk фи ТГ A PY 98. qui ge d he “ AM PUR 1 € 1121 т”) м aa mn er ri ec uL ае õlas ee i "PPP а แห | ก ส f mn nr A M THE CHICAGO CIVIC OPERA BUILDING FROM THE ETCHING BY ANTON SCHUTZ GRAHAM, ANDERSON, PROBST & WHITE, ARCHITECTS The Architectural Forum

Page 56

THE ARCHITECTURAL FORUM APRIL 1930 VOLUME LII NUMBER FOUR THE CHICAGO CIVIC OPERA BUILDING GRAHAM, ANDERSON, PROBST & WHITE, ARCHITECTS BY ANNE LEE HICAGO'S new Civic Opera Building is the pride of that mid-west metropolis. The city points to it as proof of its cultural attainments in spite of its reputation for gunmen and political imbroglios; points to it as one of the fruits of coóperative effort under the powerful leadership of Samuel Insull| who likewise is accredited with having put the opera company itself in sound financial condition by use of “big business" methods. The project has aroused the interest of opera lovers everywhere,—in cities such as New York, where opera goers are clamoring for a new and better auditorium, as well as in other communities large and small throughout this country, and perhaps in other countries also, where the struggle to provide such a music center has come to naught because of the probability of facing a deficit. Graham, Anderson, Probst & White of Chi- cago are the architects of this building, an achieve- ment of three-fold magnitude,—opera house, sky- scraper and financing plan. Ranking first in im- portance, there is, of course, the Opera House unit, the raison d'etre of the entire project, but very important in its own right is the 44-story modern office building, a skyscraper of imposing design, built like a protecting shell around three sides of the Civic Opera House, and containing in one of its wings the Civic Theater, a com- pletely equipped, modern theater seating 878. The financing plan involved in this undertaking is the third factor of importance. The Opera House project became a truly civic venture when half of its total cost of $20,000,000 was raised by the sale of stock to 10,000 subscribers, many of whom are numbered among the Opera's 3200 guarantors (80 per cent of the guarantors pay $100 or less per year), the remainder having been raised by mortgage. Sanguine, and believing in their idea, its backers look forward to a self-sup- porting opera by reason of the yield the building will eventually net, itshaving a possible annual income of $2,000,000 in rentals from the 739,- 600 square feet of rentable floor area, —662,000 square feet aside from the floor space devoted to the Civic Opera House and Civic Theater. This phase of the project is attracting the attention and study of numerous cities and organizations interested in the experiment, Although officially known as “The 20 Wacker Drive Building," the structure will inevitably be referred to by the more popular sobriquet of the "Civic Opera" for whose use it was built. The location of the building in a mercantile district, some distance from the Opera's former home and from the hotel and theater centers, has become а much discussed question. The building assumes the role of a pioneer in a district where it will set a new pace for development which is certain to materialize. With a frontage of 391 feet, the building occupies the block bounded by Wacker Drive and the Chicago River, between Madison and Washington Streets, directly across the river from the new Chicago Daily News Building. Situated outside the congested night traffic area, the building it is hoped will prove to be readily accessible. Wacker Drive, a double-decked boule- vard connection with Michigan Avenue, Chicago's main artery between the north and south sides, affords ready access to the heart of the city.

Page 57

492 From the Just across the river are two railway terminals, the Union Station and the Chicago & North Western Station, serving suburbanites using four railroads. Adjacent thereto the contemplated west and northwest side super-highways will have their termini. All of these factors influenced the decision in choosing this site in a mercantile dis- trict which is now entering upon a new stage of development. The extraordinary width of the drive in front of the building will facilitate the planning of a desirable approach,—the develop- ment of a beautiful plaza as a setting for the Opera House,—as soon as the proposed removal of the present elevated railroad extension can be brought about. Jy raising the level of the plaza above the present street grade, it will be possible to extend the lower level of Wacker Drive which now ends a short distance from the site. This lower drive will give ready access to the building, along the front of which 400 feet of curb space will be ARCHITECTURAL DESIGN Part One Front, Opera Entrance Civic Chicago Building. Graham, Anderson, Probst & White, Architects provided, just as on the street level, to facilitate the arrival and departure of cars. [Entrances directly into the building from the lower level were arranged for when the plans were drawn. Another desirable feature of this lower drive is that it will provide a vast, sheltered automobile parking space. It was with such an opera plaza in mind that the architects designed the splendid colonnade which runs the full width of the building and pro- vides a sheltered walk for passengers discharged simultaneously from as many as 40 automobiles. This is but one of a whole series of details that received careful consideration to add to the com- fort and pleasure of opera going. For instance, the box office was separated from the main lobby in order that those with seats need not crowd through lines of ticket buyers, and there is ample space so that the waiting purchasers may stand indoors, protected from the elements. Somewhat reminiscent of the Paris Opera

Page 58

April, 1930 THE River Civic Graham, &White, Elevation, Chicago Opera Building. Anderson, Probst Architects House, intentionally so, is the impressive roofed colonnade with 17 bays between octagonal piers, 35 feet in height, at either end of which there is a spacious portico with sculptured pediment to mark ind the Thea- House the entrances to the Oper ter. [n the center of the colonnade is the entrance to the office building lobby which is flanked by high class shop space. There is access, too, to the stage regions of both Opera and Theater. French Renaissance is the architectural type em ployed for exterior and interior designs, the style having been modernized for adaptation to Ameri can зКузсгарег construction. According to Alfred Shaw, the member of the architectural firm most directly associated with the work of designing the building, a strictly modern style of architec- ture failed to offer as sympathetic a background for the old, conservative traditions of opera as did the type of design chosen. Built of limestone with terra cotta trim, the building is of steel frame, fireproof construction. ARCHITECTURAL FORUM 493 From the Architects’ Rendering Long, vertical lines emphasize its height. By means of cast iron window spandrels interesting vertical effects are obtained in the upper portions of the main tower and the 2 flank it. That the architects took advantage of the unimpeded view from the west is proved by the 2-story wings that effectiveness of the river facade. Monotony has been avoided in the design, the building rising ma- jestically from its arcaded embankment to the peak of из tiled roof. In the upper floors of the Opera House unit, located between the wings of the river elevation, vertical treatment has been repeated most successfully, with a pedimented motif. A motif appears at the extreme top of the structure. Roof portico as the central similar lines of the several units are broken by finials They also appear at Ше set-backs and elsewhere as ornamental details. Rows of circular windows and decorative balustrades contain lyre, palm leaf, laurel wreath and trumpet motifs which are repeated in the ornamental details throughout the

Page 59

494 interiors. Decoration is harmonious and balanced. The entire Madison Street wing of the building is devoted to the lobby and the grand foyer. The lobby of the Opera House, like the lobbies of the office building and the Theater, are faced with filled Roman travertine, with floors of pink and gray Tennessee marble, bronze doors and trim, including elevator doors, and restrained decora- tions in salmon and gold in the ceilings. Off of the opera lobby there are three elevators to carry patrons to all floors, including boxes, dress circle and balconies. It is upon entering the magnificent and spacious rectangular grand foyer that one gets the first impression of the sumptuousness of the interior. This lofty foyer, measuring 52 x 84 feet and 44 feet in height, is flanked by fluted, marble piers surmounted by carved capitals decorated with gold leaf. The ceiling, with an elaborate and deep cornice, is salmon and gold. Ornamental metal lighting fixtures and balustrades show the con- ventionalized palm leaf and the masks of Comedy and Tragedy in their designs. Other decorative motifs include the laurel wreath, the lyre and trumpets, as used also on the exterior and in the auditorium itself. Broad stairways, with carpet- ing in a burnt orange tone, lead to a wide corridor that surrounds the foyer on three sides, on one of which it becomes part of a broader promenade through which the boxes are reached. On the same level one finds the women's lounge, with decorated, vaulted ceiling; the women's dressing rooms; the spacious quarters of the Opera Club, with luxurious carpets and hangings, oak-paneled walls and broad, brown leather chairs; and the men's rooms. On each of the other levels, —dress circle, first balcony and two floors of the second balcony,—there is a lobby promenade with drink- ing fountain and men's and women's lounging rooms. The auditorium, lavishly decorated in the sal- mon and gold scheme used in varying degrees throughout the building, succeeds in focusing attention on the stage, the eye being drawn stage- ward by means of a series of panels and lines leading in that direction. The effect is heightened by the unusual treatment of the proscenium arch, which like a deep, gold frame serves as the setting for a painting which decorates the 35 x 55-foot steel curtain. This painting by Jules Guerin, representing a pageant of characters from a num- ber of operas, carries out the general color scheme, and according to the artist and the archi- tect was planned as the fourth wall of the audi- torium rather than as an independent decoration. Painted on canvas and applied to the steel cur- tain, this mural serves both to beautify and to safeguard the auditorium. It is surprising that this decorative method of meeting fire laws ARCHITECTURAL DESIGN Part One apparently has not been used before. The lower part of the auditorium is paneled in oak, above which are velour-hung niches. The ceiling con- sists of decorative, horizontal panels which step back and up from the proscenium arch, separated by concealed openings for light and ventilation. An unusually wide and deep orchestra pit will accommodate 120 musicians on a platform which may be raised or lowered by electrical apparatus. Тне proscenium arch on either side of the orches- tra pit consists of ornamental plaster organ grilles, so that the organ music may be blended with that of the orchestra. The floor plan of the auditorium is consider- ably broader at the rear than at the stage, this plan having been adopted to assure a full view of the stage from every seat. The idea of securing good vision governed also in the first and second balconies, from the very last rows of which pa- trons have excellent views and audibility. Built on the theory “that those who come to the opera want to look at the stage and not at each other,” the opera's famous “diamond horseshoe” was elim- inated, reducing the number of boxes from the 56 of the old Auditorium to 31—17 front and 14 back boxes, richly upholstered in salmon velour and equipped with brocaded arm chairs ша similar hue. The box tiers are behind the main body of the orchestra seats. Arranged in five sections, with ample space between the rows, the orchestra seats, numbering 1682, meet every de- mand for comfort with large, deeply upholstered arm chairs covered in rose colored velour. Seats in the dress circle and the balconies are just as comfortable and are similarly upholstered. In the pitch of the second balcony a great improvement over other similar auditoriums or theaters is apparent. Although the Opera House seats a total of 3471, only 113 less than the old Auditorium. there is a feeling of intimacy about it that is sel- dom had in a large auditorium. According to Mr. Guerin, who had charge of the entire color scheme for the building, this effect has been attained largely through the intentional constant raising of the scale of the detail and the blend- ings of rose and gold without any abrupt transi- tions. Incidentally, the artist's part in the in- terior decoration represents the most complete coóperation between artist and architect, in that the colors of all carpets, upholstery fabrics, walls and ornament, as well as all decorative painting were chosen in with the artist's scheme. The five requisites which the architects were asked to provide for the new Opera House in- cluded safety, good acoustics, good vision, com- fortable seats, and pleasant surroundings. The building of the fire escapes in large spaces pro- accordance

Page 60

April, 1930 THE vided between the fireproof walls of the main building and the walls of the Opera House unit, illustrates the provision made for safety. No fire can reach the escape stairways, and the open spaces likewise serve to eliminate street noises from the auditorium. Comfortable and attractive dressing rooms, well lighted and ventilated, with private baths are provided for principals and choruses, dressing room No. 1, for the use of the prima donna, having a connecting reception room. Similar to the Opera House in its appoint- ments, its dressing room facilities and its modern stage eguipment, only on a smaller scale, is the Civic Theater which occupies the Washington Street wing of the building. With a seating ca- pacity of 878, this theater was especially designed for experimental or intimate types of productions. Its stage is seven stories in height. The stepped- up auditorium ceiling provides space between the fourth and eighth floor levels for coaching rooms, storage, and orchestra and rooms. Ample storage area is available in the basement and mezzanine-basement, the latter hav- ing access to the shipping dock. An important sub-station of the Commonwealth Edison Com- pany is situated in the basement. The rentable area of the structure commences on the third floor in the main tower and on the fourth and fifth floors of the Madison and Wash- ington Street wings respectiv all the space above the seventh floor of this U-shaped building and all the space in the tower above it being util- ized for offices, outside rooms entirely with un- usually liberal daylight provision for the tenants. chorus rehearsal ARCHITECTURAL FORUM 495 Terra cotta was used for the decorative belt courses on all facades of the building and for the ashlar facing between these courses; the orna- mental features (masks, urns, etc.) and some ash- lar on upper stories, practically all spandrels, as well as the brightly colored roof. Over 2,500 tons of terra cotta were used, which cover more than 33 per cent of the superficial area of the building. The attention and ingenuity exercised to assure Chicago goers,—the cheapest seat as well as the one of the most ex- pensive location,—comíort, audibilitv and good vision in beautiful surroundings have been jus- tified by the results. This building, which was planned, constructed and put into operation in 22 opera occupant of the months after the project was approved, sents something of a record, too, particularly in view of the complicated nature of the structure which includes an opera house with its various dependencies, a huge, modern office building, a theater, an electric sub-station, a group of broad- repre- casting studios, a club, quarters for a safe deposit company, and numbers of tenants with extensive requirements in the arrangement of their space. Тпиз, one does not hesitate to say that Chicago may rightfully boast of its new Civic Opera House Building as an achievement of significance. Eorror's Nore. The unusually difficult engineering problems successfully solved in the construction of the Chicago Civic Opera Building are described at length in Part Two of this issue, as is also the problem of ob- taining perfect acoustical conditions, which work was in charge of Professor Paul E. Sabine of Geneva, Ill., who has written for us an authoritative article on this sub- ject. The description of the stage lighting system and the stage equipment will also be found in Part Two. Upper Balcony of the Chicago Civic Opera House. Graham, Anderson, Probst к White, Architects

Page 61

Part One AL DESIGN R SRCHITECTU 496 mh DET ร แว จ เหว ง จ "ЗНА จ เร ส อ ห ส 'NOSHAONV INVHVHO ASNOH VidO ало อ ว “4 ว เห ว JHL YO ม เพ จ ถก ว ร ส า ก [ да азіміма аму азмовза ' ม เห แพ ก ว ส จ ม ง พ อ ว ฯ 3 ส De Уз

Page 62

THE COLOR AND THE CURTAI CHICAGO CIVIC OPERA HOUSE when collaborate Probst & of the N extremely choice made Jules Guerin with the architects, Graham, Anderson, White, to determine the Chicago Civic Opera Civic Theater. It is fortunate also that this lead- ing painter and colorist was chosen to paint the the Civic Opera House might be a harmonious whole. One notes the warmth and richness of color on enter d foyer with its gracefully piers of travertine. The warm rich,—orange, vermilion and these are the dominant colors throughout the en tire The light travertine enhances the effect of the rich color [he American travertine is admirable in texture for the purposes of this interior. In some cases, where it was felt that the natural markings in wise was was selected to scheme color House and the Chicago curtain in order that the interior of ing the high-ceiling pilastered colors are gol and Opera House. warmth of the the stone were too evident, portions were filled with a special cement mixed with ground traver- tine in order that the color might be the same. The auditorium is a symphony in delicate nuances of vermilion and orange, with the added richness of the lavish use of gold leaf where it effective. 15 most This lavishness, however, is never overdone, and Mr. Guerin has secured an might Each color for every purpose was chosen with that atmosphere of richness where another easily have made the auditorium gaudv. color sense which is one of this artist's rare gifts He selected the fabrics and colors and had thc fabrics dyed especially in order that they might be of the exact hue and tone desired that all of the fabrics were fireproofed without in Incident ally, it is interesting to know any wav affecting either their color or texture, To Mr. Guerin, the curtain enír. proscenium is logically the fourth wall oí an auditorium. W amed by the th the attention of the audience Proscenium Arch and Curtain, Chicago Civic Opera House Graham, Anderson, Probst & White, Architects

Page 63

498 ARCHITECTURAL DESIGN Part One naturally directed toward the curtain, it becomes the important focal point of the entire decorative scheme. Sensing the character of the architecture with its side wall and ceiling panels, Mr. Guerin added to this effect by dividing the curtain sub- Пу into three panels. The setting of the curtain is a rich enframement unusual in its size and effectiveness as it leads back from the edge of the orchestra pit to the footlights. In the richness of line, color and tone it is an excellent frame for the spirited curtain,—íar more effective than the ordinary proscenium arch flanked with boxes The spirit of the curtain is that of high carni- val. A gay procession is on its way early in the night,—stars are seen through the tree trunks against the dark blue sky beyond. The trees bear leaves of gold in rich pattern, forming the upper background of the curtain; festive standards of emerald green with gold caps carry waving ban- ners and pennants which are gray, as a foil for the gay colors. The fleur de lis of the flags are a painted gold,—not the toned gold leaf of the foliage background. The central figure waves a great checkered cloth of orange and vermilion above her head, and one of the balloons forms a setting or background for her profile and dark hair, as she rides one of the camels at the center of the procession. Surrounding her is the crowd of merrymakers with all the accessories that make for gaiety,—drums and trumpets and clang- ing cymbals. Baskets of fruit and grapes are be- ing taken along, and wine will flow, too, for there are bottles of Chianti in the crowd. Everyone is entering into the spirit of the occasion,—children joining in the throng —even the fowls strut along with the procession. One sees Pagliacci with his whitened face and ruche; Madame But- terfly is there, too,—and Carmen,—and two dancers pause to pirouette in the center. АП are going somewhere for a night of revelry; all face in the same direction,—with the single exception of the girl at the extreme right who beckons on the procession. The figures are approximately life size or pos- sibly slightly larger, and are carefully drawn in outline and painted in flat colors with practically no modeling. The flesh tones are treated in orange in key with the warmth of the entire cur- tain. The costumes and accessories are in blues and greens which relieve, emphasize and enliven the entire composition,—the organ in the first panel, for instance, being an emerald green; the clown in vermilion. The enframing borders of the three panels into which the composition is divided carry out in conventionalized design the romantic quality of the curtain, the scrolls and swags, masks and rib- bons, being carefully studied to enhance the effect of the whole without attracting undue attention to themselves,—giving the effect of a tapestry border. The curtain was painted in the studio and then mounted in place on the steel curtain which was very carefully prepared and which made an excellent surface for the mounting of the painting. The curtain, bathed in orange light. enlivens the imagination of the audience and stimulates its expectation, thereby heightening the enjoyment of the opera it serves to introduce. The gaiety and carnival spirit of the curtain pro- vide the first joy of a night at the Civic Opera.

Page 64

APRIL, 193 THE ARCHITECTURAL FORUM PLATE 8 CHICAGO CIVIC OPERA BUILDING GRAHAM, ANDERSON, PROBST & WHITE, ARCHITECTS ONE OF THE ENTRANCES TO THE OPERA HOUSE

Page 65

CORRIDOR = EY ШЕ. o = = = = = = ш = = = = = m= ш = "= m= SECOND FLOOR PLAN Um = шщ б, เณ แพ M М аа А ра В. om = = G э е > э = ๓ е ๓ = э ๓ = о -- P FIRST FLOOR PLAN CHICAGO CIVIC OPERA BUILDING GRAHAM, ANDERSON, PROBST & WHITE ARCHITECTS 500

Page 66

APRIL, 1930 THE ARCHITECTURAL FORUM PLATE 82 VIEW FROM THE WEST CHICAGO CIVIC OPERA BUILDING GRAHAM, ANDERSON, PROBST & WHITE, ARCHITECTS 501

Page 67

zz te ПИТЕР zx: nid TE EET KEN ЖЕ Же CS LASE PLAN PUBLIC СВЕ! DOR. т зи | HTA E A DE - ` == = | mr FOURTH FLOOR Bg p - тора 2 $ 5 = ЖИС. H "PUBLIC = Te อ “1, == ЕТО TE r= = ED г - = <=... nuc: E THIRD FLOOR PLAN CHICAGO CIVIC OPERA BUILDING GRAHAM, ANDERSON, PROBST & WHITE ARCHITECTS а | я -

Page 68

¿ < У; , 7 / д = U = е. CHICAGO CIVIC OPERA BUILDING GRAHAM, ANDERSON, PROBST & WHITE, ARCHITECTS

Page 69

VA-DITAIL-ELEVATION-OPBAYS BETWEEN-COLS-* FLOORS- MCL, LIVER SIDE ° DETAIL OF RIVER FACADE CHICAGO CIVIC OPERA BUILDING GRAHAM, ANDERSON, PROBST & WHITE, ARCHITECTS 504

Page 70

APRIL, 1930 THE ARCHITECTURAL FORUM PLATE 84 GRAND FOYER CHICAGO CIVIC OPERA HOUSE GRAHAM, ANDERSON, PROBST & WHITE, ARCHITECTS 505

Page 71

ХУСКУНУМО NOH МАХОМ ахуно HONONHL LSAM ONINOO'T จ ณา ศร SSOMD “пуача ppt tht {sth ff, 4 P, y БС AMPA AAA seems ПИ

Page 72

APRIL, 1930 THE ARCHITECTURAL FORUM PLATE 85 PORTION OF THE FOYER CHICAGO CIVIC OPERA HOUSE GRAHAM, ANDERSON, PROBST & WHITE, ARCHITECTS | 507

Page 73

SECTIONS THROUGH GRAND FOYER LONGITUDINAL 508

Page 74

APRIL, 1930 THE ARCHITECTURAL FORUM PLATE 86 FIRST TIER BOXES CHICAGO CIVIC OPERA HOUSE GRAHAM, ANDERSON, PROBST & WHITE, ARCHITECTS 509

Page 75

Eum - SES SR cr аи TWENTY-SIXTH FLOOR PLAN s. a и Ка пи т (ыз Ћи пе THIRTEENTH FLOOR PLAN CHICAGO CIVIC OPERA BUILDING GRAHAM, ANDERSON, PROBST & WHITI ARCHITECTS

Page 76

APRIL, 1930 THE ARCHITECTURAL FORUM PLATE 2 H Я DETAIL, SIDE WALL TREATMENT CHICAGO CIVIC OPERA HOUSE GRAHAM, ANDERSON, PROBST & WHITE, ARCHITECTS 511

Page 77

- руда | M MÀ = 1 з чынын а теше п (сетте ч m 8. 5m а а, IE IE HL wm йі. A... TSE DETAILS, SHOWING VARIOUS CEILING PLANS CHICAGO CIVIC OPERA HOUSE GRAHAM, ANDERSON, PROBST & WHITE, ARCHITECTS vi гә

Page 78

FORUM < x „2 с4 т ТНЕ | Е D f | —PA- [T< . SI IA. WAT I ANDERSON, PROBST & WHI IAM

Page 79

SCALE fier-o = Š Е a " о к e = о) 3 Š z > e = = ш © = 2 © E 8 = < Р б 2 2 a о. CEILING OF LOBBIES TO СМС THEATRE Ve REFLECTED CEILING к | necred CEILING ғым | | ее 6 แ ๐ ๐ ๕. оза вы алм OF LOBEY то BALOONY E — DETAIL, CEILING PLAN OF CIVIC THEATRE CHICAGO CIVIC OPERA THEATRE GRAHAM, ANDERSON, PROBST & WHITE, ARCHITECTS

Page 80

APRIL, 193( THE ARCHITECTURAL A SPANISH CHAPEL IN CALIFORNIA Photos, George. Haight FUNERAL CHAPEL FOR J J. MOTTELL, INC, AT LONG BEACH, CAL. HUGH R. DAVIES, ARCHITECT FORUM PLATE 89

Page 81

APRIL, 193 THE ARCHITECTURAL FORUM PLATE 9 ARCADED CLOISTERS CONNECT CHAPEL AND FUNERAL PARLORS FUNERAL CHAPEL FOR J. 1. MOTTELL, INC, AT LONG BEACH, CAL. HUGH R. DAVIES, ARCHITECT 51

Page 82

лит

Page 83

APRIL, 1930 THE ARCHITECTURAL FORUM PLATE 91 THE TOWER FUNERAL CHAPEL FOR J. J. MOTTELL, INC. AT LONG BEACH, CAL. HUGH R. DAVIES, ARCHITECT 519

Page 84

| |с SECOND FLOOR PLAN CHAPEL FOR J. J. MOTTELL, INC. АТ LONG DACH, CAL HUGH R. DAVIES, ARCHITECT

Page 85

АРЕ IHE ARCHITECTURAL FORUM PLATE THE PATIO FROM THE CLOISTER FUNERAL CHAPEL FOR J. J. MOTTELL, IN( AT LONG BEACH, CAI IUGH R. DAVIES, ARCHITECT

Page 86

THE ARCHITECTURAL FORUM SIDE ENTRANCE TO CHAPEI FUNERAL CHAPEL FOR J. J. МОТ! LONG BEACH, CAL. HUGH R. DAVIES INC. AT ARCHITECT ~

Page 87

APRIL, 1930 THE ARCHITECTURAL FORUM PLATE 94 THE PATIO FROM THE AMBULATORY “КАТ, CHAPEL FOR J. J. MOTTELL, INC. AT LONG CH, CALIFORNIA. HUGH R. DAVIES, ARCHITECT UI ว л

Page 88

THE ARCHITECTURAL FORUM ENTRANCE TO BUSINESS ROOMS FUNERAL CHAPEL FOR J, J. MOTTELL, INC, AT LONG BEACH, CAL, HUGH R. DAVIES, ARCHITECT ง 1

Page 89

APRIL, 1930 THE ARCHITECTURAL FORUM PLATE 96 (ABOVE) THE NAVE FROM THE SANCTUARY. (BELOW) VIEW OF CHAPEL WITH THE SANCTUARY BEYOND FUNERAI CHAPEL FOR J. J. MOTTELL, INC, AT LONG BEACH, CAL. HUGH R DAVIES, ARCHITECT ง 1 2

Page 90

CHATEAU D'O, NEAR MORTREE (T, PHOTOGRAPHS ARTHUR H. N a second-hand car, piled high with luggage, sketching material and a dc for we set out the byways, avoiding the highways of France, in 1 of small chateaux and manor houses. А car, no matter how insignificant, gives a sense of freedom from trains and schedules, porters and taxicabs and grants flexibility of movement that is unequaled by any other manner of tourin It would not be out of the way to add a word con searc. cerning the economy of motoring in this fashion Twice I have bought cars on pilgrimages in France. Each time they were easily disposed of before sailing at a price which made their cost ridicu I have heard friends recom mend taking over a car, but if the trip is for three months or less, it is wiser to buy a new cz ously small. abroad, AND GILKISON DRAWINGS since one can be bought and arrangements made with the factory to re-purchase within that time at about three hundred and fifty dollars less than cost price. Ат gements can be made for this in New York with the agency of one of the largest French auto manufacturers, and the car will be delivered at the boat pier ready for your arrival. ^; that It seems to be human nature to want | on and on, the faster This is particularly true, if a definite goal is set for the day's journey. Try as one will, it is hard not to feel that one must hurry оп; consequently the in- tervening towns are apt to be slighted. To over- come this, we found it best not to make a definite objective for the day, deciding where to stop for There is only one objection to motori is speed. the better. The Old Chateau D'O, Near Mortree, in the Department of Orne 531

Page 91

532 ARCHITECTURAL DESIGN Part One Front of Chateau D'O from a Pencil Sketch by Arthur H. Gilkison the night only when the light beg; fail. town with a good inn can invariably be found within a short ride, for with few exceptions every French village has a small hotel with well cooked food and excellent wine. Also, should there be a chateau in the neighborhood, the inn keeper is more than willing to give the history and any details he may know concerning it. Then, too, motoring gives one a greater range in the choice of inns, Tf traveling on limited means, one can always go on if the prices s exorbitant, as one soon learns not to unload the luggage until the terms are settled. Many of the smaller inns make no charge for garage space, but, if the car is small, they may park it in with the cow and the chickens. The more pretentious places usually charge about five or six francs for storing a small car, increas- ing the rate with the horse power and general magnificence. It was on one of our scouting trips that we stumbled on one of the most charming of small chateaux, the Chateau d'O. It is located slightly over one hundred miles away from and almost directly west of Paris, in the department of the Orne, on the out- irts of the village of Mortree. Baedeker gives it only one line, but calls it a “magnificent edifice of the Renaissance,” and truly it is deserving of more space from Mr. Baed Built in 1505, by Charles ФО and his wife Louise, on the rem- nant of an older feudal castle and passing through various periods of res oration, particularly that of 1770. in which the east facade was so unfor- tunately altered that it is scarely recognizable as part of the original building, it still retains its early charm and gives one, here in its quiet situa- tion remote from guides and bus-loads of per- sistent tourists, a much better conception of the great homes of the period, than the large museum-

Page 92

April, 1930 THE ARCHITECTURAL FORUM 533 Side Elevation from Across the Моа! like chateaux of the Loire Vallev, one hundred miles southward. The famous or shall we say infamous grandson of Charles d'O, that Francois d'O, who appears as one of the butchers of St. Bartholomew's Eve, was at one time its notorious owner. Mi Henry III, he figures in French history as Governor of Paris, Minister of Finance, first treasurer of Henry IV and an all around villain, It is probable that a portion of the public funds, which he freely appropriated for his own use, were spent in beautifying his chateau оп of So much we learn from history ; legend adds to The story goes that Francois' young wife, Marie d'O, found too much comfort, spiritual and otherwise, in her religious adviser. One day the suspicious Francois met the cure leaving а room in the chapel. As the cure looked embar demanded of him, whether there wa ) іп the room he had just left; the cure lying to save a lady's honor replied “Хо,” whereupon Francois immediately ordered the doorway walled it, and tells of the room without a door. assed, Francois uryone else

Page 93

534 ARCHITECTURAL DESIGN Part One DETAIL OF THE MAIN ENTRANCE SHOWING TREATMENT OF WINDOWS

Page 94

April, 1930 THE ARCHITECTURAL FORUM 535 ENTRANCE, CHATEAU DO, FROM А PENCIL SKETCH BY ARTHUR H. GILKISON

Page 95

Entrance. Gates, Marie d'O inside. Ве that as it may, Francois’ sins did not remain en- tirely unpunished in his lifetime, for he died of a horrible disease 1n the hands of the bailiff. Comparatively small, as chateaux go, it is no up with the unfortunate 594, leaving Chateau d'O in зап many of our own country houses, The has been retained and broadens out into larger tl old moat a small lake on the west side. There are two ie south, of an earlier date, still possesses fortified the traditional slate-roofed circular towers of defense at the corners. The north wing I have illustrated пезе two wings are joined by a loggia, thus forming the three sides of a courtyard open- ing on the lake at the west totally dif ferent in design, the wings give a curious effect, half castle, half mansion. The north wing has one of the most charming facades to he found on any wings ; t а semi- medieval character, with here. 7 Зет ARCHITECTURAL Part One Chateau. D'O of the French chateaux. Its high pitched roofs broken with richly ornamented dormers and tall chimneys, give it all the characteristic с fusion, richness of sky line and picturesqueness of the Banister Fletcher tells us that the early period. French Renaissance is "a period of transition, in which Renaissance details were grafted on to Gothic forms," Here we have an excellent ex ample of this period, with the small scale of the mouldings, the shell ornament on the dormers, the Gothic feeling of the design, the high pitched roofs md general vertical treatment, all showing the transition from Gothic to Renaissance. Built of light colored, dressed stone, a pleasing interpola- tion of brickwork is used with sufficient restraint ssary intimate domestic quality lack- ing in some of the more famous chateaux. After being unoccupied for years, the chateau 1s now the residence of the family of General d'Aubigny to give a nec

Page 96

A VENETIAN VILLA IN TEXAS WILLIAM McKNIGHT TEX BOWMAN, ARCHITECT T BY EDMUND B. GILCHRIST N a day when there seems to be almost undue pressure to be original in our creations ; when the normal creative desire is so likely to be harried and hurried to the point of becoming a struggle rather than a pleasure ; when minds com- mence to have the habit of thinking in grooves immeasurably more restricted in their chosen way than during almost any one of all the ample epochs of unified design that have gone before, it is reassuring to come upon an architect who goes the pleasant pace, unhurried and self re- liant,—one who obviously, to judge by the accom- panying illustrations and plans, has affection and understanding for all that Italy has ever said to him and which he now tempers so well with his own touch, The plan of this house in the Venetian manner, taking it as а whole, embracing the entire plot, has been worked into nicely balanced and well organized parts. As is true of all good plans, it is rational and organized. It is evident that the author has conceived his problem as starting at the very edges of the property and, working in- wards, has solved the necessities of the house it- self only as a part of the entire scheme. The ques- tionable American tradition, that of building a house on the line of the proverbial backset from the street, —establishing a main and a service en- trance, placing a garage and clothes yard where they are inconspicuous, and then scattering the shapeless grounds with meaningless masses of deciduous shrubs and conifers, was decidedly not considered here. Here there is good plannin every element of the program is turned to effective account and made to play an important part in rounding out the whole. The elements of the pro- gram in the average American house problem are all too few to omit any of them from the category of effective architectural capital. The plan of the house should be an incident in the plan of the grounds. Before asking whether or no our ground plans are good, one should first ask—is there such à plan? How many plans and sumptuous presen- tations we see for large houses with hardly a line to indicate that the author has been thinking of the grounds, or the general aspect of the whole scheme, together with the plan of the building. These things cannot be thought of separately with any more success than were one to complete the first floor plan of a building before giving any thought to that of the second. Without pointing directly to any of the many simple effective and unusual conceptions inthe plan of this house itself, all of which are obvious to one who will study and compare it with the illus- trations, it is clearly a plan that has the beauty of simple organization and smooth outline. It is a plan that one can pass through without question or explanation, and at no point is there the effort more into it than it will hold. The elevations are the direct reflection of a good plan, —robust and gay, not overburdened with sim- plicity and restraint,—most openly, tastefully and skillfully accomplished in a manner perfectly in accord with its locale. The observation that time will do much toward giving surface quality to this work is, as usual, both inevitable and true. Standing at the foot of the long axis at Villa d'Este last fall, and looking back, I wondered how it all must have seemed immediately follow- ing its completion. I fear the lay judgment of today would have been fairly severe with it! As for the interior, these illustrations speak with authority of enthusiasm and invention, a unique and sensitive touch, strength contrasted with delicacy and detail nicely related to mass. Аз beauty rarely seems to exist objectively but rather to be a quality brought to the work by the ob- server according to his own fancy, it would seem best to let the reader go his own quiet and un- escorted way through these rooms, To me there is no delight and stimulus on com- ing away írom a work such as this quite so poignant as the impress, providing one is blessed with the gift of receiving it, that connects the work with the architect and makes it his alone This quality appears without struggle, its source is purely personal, it is always original and gen- erally beautiful. It Aourishes only in the imagina- tive mind, and its very substance is called in- spiration. It is in the light of this quality in Mr. Bowman's present work that 1 am drawn to it. to squeeze Notes by the Architect НЕ house is composed, like so many Vene- tian houses, of a central gabled mass, which contains the large second floor salon or drawing room, flanked by slightly lower wings, and these in turn are extended by a sleeping porch pavilion on one side and a semi-attached garage on the other. The house is situated on the brow of a hill, so that in front there is an elevated terrace, while the opposite side opens on a level with the garden. The front terrace is reached by a flight of steps at each end, one for pedestrian approach, the other for those using automobiles. The house 537

Page 97

538 is built of brick covered with stucco. The trim- ming, balconies, balustrades, urns, etc., are of cast stone. The whole exterior is whitewashed over both stucco and stone. The blinds are green, and the roof tiles a pale clay color. Terrace pavings are of a soft salmon brick made locally. The bambini on the front terrace balustrade are an- tiques from Venice, of pure white Istrian stone. As in all houses in this part of Te» the ser- vants live in a separate building. This s mplifies the plan problem and also provides another ele- ment in the design of a residence in the south- west. The servants' house has the same color scheme as the main building, —whitewashed walls, green shutters, and a tile roof. The garage and connecting archway provide a beautiful terrace above, opening off the library. This garage is not only an ornamental and integral part of the design but is also useful in providing the upper vart of this terrace will be shaded by grape vines on a trellis, while the outer portion will always be left open for enjoyment of the dazzling southern nights. On entering the house one is immediately im- pressed by there being a sense of cool, shaded space. As in Italy, on the hottest days this house with its blinds closed is cool and delightful. The large entrance hall has for its chief decoration a patterned tile floor in yellow, black and white bands, with a black and white cartouche at the center, The walls are painted a grayish mauve, the base is marbleized verd antique, and the doors are veneered in walnut in a diamond pat- tern. Double doors at the left of the hall lead to the dining room, on the right to the guest room, and at the back to the breakfast room, where the doors are glazed in the upper parts. The guest room opposite the dining room has a tile floor of gray, black, white, and two tones of buff. Its walls, trim and cornice are painted robin's egg blue, and curtains and bed spread are of the same color. The bedstead is an unusually fine old carved piece from a villa on Lake Como. The Venetian furniture is painted olive green with red decorations and has coverings of rose and ivory damask, The breakfast room has a floor of buff, mauve and white tiles. Its walls, trim, cornice and ceiling are white. At the win- dows hang antique taffeta curtains of a faded shell ри The antique chairs are yellow with decorations of dull green. They are upholstered in soft pink damask, while the reverse of their backs still have the turkey red, happily introduced by some former owner, The stairway, which leaves the entrance hall between walls, begins with two low steps; then comes a landing flanked by decorated doors, ve- neered in walnut with black and gold mouldings and having mirrors in the upper panels, the lower terrace. ARCHITECTURAL DESIGN Part One panels being ornamented with gilded banjos. One door leads to a coat closet, the other to the play room, the the garage. The stairs continue up to the next landing, where there is a high leaded glass window. From here the open stair well rises 15 feet to the vaulted ceiling, from which hangs a Venetian lantern. At the top of these stairs are the wide doors to the drawing room. This stairway is built entirely of wood. The treads and risers are painted stone color, and the massive railing is marbleized to imitate red Verona, as are the stringers and the trim. The walls and ceiling the same grayish mauve as the entrance hall; carpet is dull vellow. The drawing room, placed as it is in the central portion of the house, on the second floor, has a very lofty ceiling with exposed beams. Screens of leaded glass fill the ends, beyond which are the arches and balconies that form the chief decora- tive features of the exterior. The drawing room walls are painted a dull gray-green which forms a fine background for antique Italian paintings. The rug is camel's hair color, and the curtains are aubergine brocade with a floral design in green and pale yellow. The furniture is an agree- able mixture of antique Venetian and more com- fortable modern pieces. Bright notes of rich yel- low and red are introduced in the upholstery. Two crystal chandeliers provide general lighting, while lamps are conveniently placed for reading. The doors leading to the stairway and the mas- ter's suite are walnut veneer, with raised black mouldings and panels of crotched myrtle. The trim around doors and the baseboard are marble- ized Levanto. The floor is walnut parquetry. The library has walls and ceiling of pine. The walls are finished in amber tones with a high satin finish. The recesses for books and the shelves and also the shells in the cornice are painted dark green and picked out in gold. The field of the ceiling is painted the same dark green, while the raised mouldings are finished like the walls and picked out in gold. The sun bursts and other raised ornaments are gold, and the painted design is in grisaille with touches of plum color. The curtains are green brocatelle, the rug egg plant color, and the furniture a pleasant mixture of greens and browns. Two fine crystal appliques flank the fireplace, the facings and hearth of which are verd antique marble. The French door leads to the terrace which covers the garage. The m: ter's bedroom is painted a pale yellow-green with toile curtains having considerable mauve. The furniture is painted dark green with ivory panels having flower designs. Throughout the entire side entrance and book house color has been used in greater strength and in greater quantity than is usually found in American houses. Italian precedent permitted it, and the good taste of the owner encouraged it.

Page 98

APRIL, 1936 THE ARCHITECTURAL FORUM A VENETIAN VILLA AT SAN ANTONIO, TEXAS HOUSE FOR J. B. ROBERTSON, ESQUIRI WILLIAM McKNIGHT BOWMAN, ARCHITECT

Page 99

APRIL, THE ARCHITECTURAL FORUM PLATE 98 SIMILAR BALCONIES AND TRIPLE ARCADES DECORATE THE EAST FACADE SHOWN ABOVE AND THAT OF THE WEST SHOWN BELOW HOUSE FOR J. B. ROBERTSON, ESQ., AT SAN ANTONIO. WILLIAM McKNIGHT BOWMAN, ARCHITECT

Page 100

FIRST FLOOR PLAN RESIDENCE OF J. B. ROBERTSON, Q., SAN ANTONIO WILLIAM McKNIGHT BOWMAN, ARCHITECT

Page 101

APRI ГНЕ ARCHITECTURAL FORUM PLATI BELOW, THE DOOR BREAKFAST ROOM ONTO THE WEST TERRACE OWER TERRACE BALUSTRADI AND STEPS ON THE EAST SIDE SHOW STRONG ITALIAN FEELING OUSE FOR J. B. ROBERT SON, ESQ. AT SAN ANTO ‘IO. WILLIAM MCKNIGHT ЗОММАХ, ARCHITECT

Page 102

== Гре Dzd-Room kz ват Ра у r "1 ki WY B Hi SLEEPING Ke. AEO | ровси | "Вер'Воом TT | STORE 1 Room SECOND FLOOR P RESIDENCE OF J. B. ROBERTSON, ESQ. SAN ANTONIO WILLIAM McKNIGHT BOWMAN, ARCHITECT 544

Page 103

APRIL, 1936 THE ARCHITECTURAL FORUM PLATE TWO VIEWS OF THE EAST TERRACE WITH OVERHANGING BALCONY AND LOGGIA ABOVE HOUSE FOR J. B. ROBERTSON, ESQ., AT SAN ANTONIO. WILLIAM McKNIGHT BOWMAN, ARCHITECT 545

Page 104

APRII IHE ARCHITECTURAL FORUM PLAT TH OURTYARD AND SERVA HOUSE FOR J. B. ROBE WILLIAM McKNIGHT N AN ЗОМ МАХ АКСНТТЕСТ RTSON, ESQ., $

Page 105

APRIL, 1930 THE ARCHITECTURAL FORUM PLATE 102 LOGGIA AT SOUTH END OF FIRST FLOOR OPENS THROUGH ARCHWAY ONTO THE E T TERRACE AND GARDEN PATH DRIVEWAY ARCH, SIDE DOOR AND REAR COURT YARD WITH OLD TREE HOUSE FOR J. B. ROBERTSON, ESQ., AT SAN ANTONIO. WILLIA McKNIGHT BOWMAN, ARCHITECT 549

Page 106

APRIL, 1930 THE ARCHITECTURAL FORUM PLATE 103 VIEWS OF THE ENTRANCE HALL HOUSE FOR J. В. ROBERTSON, ESQ., AT SAN ANTONIO. WILLIAM McKNIGHT BOWMAN, ARCHITECT ui o

Page 107

APRIL, 1930 THE ARCHITECTURAL FORUM PLATE 104 DOORWAY FROM DRAWING ROOM INTO STAIR HALI HOUSE FOR J. B. ROBERTSON, ESQ., SAN ANTONIO WILLIAM McKNIGHT BOWMAN, ARCHITECT ง 1 >

Page 108

APR 3 THE ARCHITECTURAL FORUM PLATE VIEWS OF EACH END OF THE DRAWING ROOM SHOWING THE WINDOWS OPENING ON LOGGIAS HOUSE FOR Ј. В. ROBERTSON, ESO., AT SAN ANTONIO. WILLIAM McKNIGHT BOWMAN, ARCHITECT

Page 109

APRIL, THE ARCHITECTURAL FORUM (ABOVE) CORNER OF DRAWING FLOOR AND CEILING BEAMS АВЕ WALNUT, TRIM AND BASEBOARD ARE MARBLEIZED LEVANTO DOORS ARE WALNUT VENEER WITH RAISED BLACK MOULDINGS AND PANELS OF CROTCHED MYRTLE THE ARE PAINTED A DULL GRAY-GREEN BELOW) DOOR TO CLOSET AT FOOT OF STAIRWAY ON FIRST ROOM LS FLOOR

Page 110

APRIL, 19 THE ARCHITECTURAL FORUM PLATE 10 COLORFUL DINING ROOM ON THE MAIN FLOOR HOUSE FOR J. B. ROBERTSON, ESQ., SAN ANTONIO WILLIAM McKNIGHT BOWMAN, ARCHITECT 559

Page 111

APRIL, 1930 THE ARCHITECTURAL FORUM PLATE 108 GUEST ROOM FROM ENTRANCE HALI (BELOW) DOORWAY INTO DRAWING ROOM AT HEAD OF MAIN STAIRS HOUSE FOR J. В. ROBERTSON, ESQ. AT SAN ANTONIO WILLIAM McKNIGHT BOWMAN, ARCHITECT 501

Page 112

APRIL, 1930 THE ARCHITECTURAL FORUM PLATE THE PINE PANELED LIBRARY IS CAR RIED OUT IN AMBER, GREEN AND GOLD WITH A RUG IN MAGENTA HOUSE FOR J. B. ROBERTSON, ESQ. AT SAN ANTONIO. WILLIAM McKNIGHT BOWMAN, ARCHITECT 563

Page 113

APRIL, 19 THE ARCHITECTURAL FORUM PLATE 110 WHITE BREAKFAST ROOM ON THE FIRST FLOOR HOUSE FOR J. B. ROBERTSON, ESQ., SAN ANTONIO WILLIAM McKNIGHT BOWMAN, ARCHITECT 565

Page 114

APRIL, 193 THE BREAKFAST ROOM ON THE FIRST FLOOR HAS WHITE PAINTED WALLS, WOODWORK AND CEILING THE CURTAINS ARE SHELL PINK AND THE TILE FLOOR BUFF AND MAUVE D DOORS FROM EN ANCE INTO THE EAST TERRACE FOR J. B. ROBERTSON, E SAN ANTONIO. WILLI McKNIGHT BOWMAN, ARCHITECT ARCHITECTURAL SQ., AM 567 FORUM PLATE 111

Page 115

APRIL, 1934 THE ARCHITECTURAL FORUM PLATE BLUE BEDROOM ON THE FIRST FLOOR HAS AN ANTIQUE BED EAST BEDROOM, SECOND FLOOR, IS DECORATED IN LAVENDER HOUSE FOR 1. B. ROBERTSON, Е50., SAN ANTONIO WILLIAM McKNIGHT BOWMAN, ARCHITECT 569

Page 116

APRIL, 1930 THE ARCHITECTURAL FORUM SKETCH 1 ^ 4 Eu аре: 5 a | Ұға MARIA ARRA AX NEY дз AN OLD COTSWOLD HOUSE FROM A PENCIL SKETCH BY MARIAN GREENE BARNEY

Page 117

APRIL, 1930 THE ARCHITECTURAL FORUM 1 | š i | 3 Hd * š ^" Yo. T % ха буа B == COURTYARD AND COTTAGES FROM A PENCIL SKETCH BY MARIAN GREENE BARNEY

Page 118

APRIL, 1930 THE ARCHITECTURAL FORUM SKETCH TIT ATU P IDN. PORLOGIS: SOMERSE T:-SEEL5 FROM A PENCIL SKETCH BY MARIAN GREENE BARNEY

Page 119

APRIL, 1930 THE ARCHITECTURAL FORUM SKETCH IV Reba Fillipläet an the До esiis” ES The диска) Manor, Brssets Ranh, faves, Home of Sir Akr | EARLY RENAISSANCE POST AT BESSELSLEIGH, BERKS, FROM A PENCIL SKETCH BY MARIAN GREENE BARNEY

Page 120

APRIL, 1980 THE ARCHITECTURAL FORUM SKETCH V -r ج‎ -- FROM A PENCIL SKETCH BY MARIAN GREENE BARNEY

Page 121

APRIL, 1930 THE ARCHITECTURAL FORUM SKETCH VI S УАЗ SOM N AN 2 Сх) Ш yii | == ean, ПА m > 242%. | ч, a jfi E Wy, 4 Tania Qusa oan, ร มะ «ซี ENTRANCE DOOR AND TERRACE FROM A PENCIL SKETCH BY MARIAN GREENE BARNEY

Page 122

APRIL, 1930 THE ARCHITECTURAL FORUM SKETCH VII THATCHED-ROOFED COTTAGES WITH FRONT GARDENS, FROM A PEN AND INK DRAWING BY MARIAN GREENE BARNEY

Page 123

APRIL, 1930 THE ARCHITECTURAL FORUM SKETCH VIII ui. e if Мезе | к Гей ағ” г Я ша y Trudi lii vi uii ed Жыл» КЕТТІ кыйы ды. “шш, | d "y тр кезд `- เค y ш Ims us ze vc | Ш е TYPICAL COTSWOLD СОТТАСЕ BUILT OF STONE WITH WINGS, DORMERS AND GROUPED WINDOWS FROM A PEN AND INK DRAWING BY MARIAN GREENE BARNEY

Page 124

COTTAGES OF THE COTSWOLDS BY HAROLD DONALDSON EBERLEIN HE domestic architecture of the Cotswolds is an architecture to a singular degree condi- tioned by the native materials suitable for build- ing. These are, first and foremost, a limestone of peculiarly rich guality, found plentifully on every hand throughout the region. Next come half- timber work with stuccoed noggi weather boarding with undressed edges, and, for the roofs, when not covered with stone tiles, thatch of straw. This is not a very extensive list of resources, per- haps, but with them the loca past contrived to get marvelous variety, and the legacy they left is а veritable wellspring of in- ว ใช ล น์ เอ ท today for architects and artists. The Cotswold limestone is a material so beau- tiful, and so tractable in the hands of the masons, that it has always been used for every purpose to which stone can possibly be put. The walls are built of it, with masonry of every kind of face; the roofs are covered with stone tiles or "slats" made of it, after it has been split into thin layers by exposing fresh-hewn blocks of it to the cl ing action of rain and frost throughout a winter ; opings, finials, window mullions, mouldings, oorways and all manner of exterior details are carved from it; indoors, fireplaces are chiseled from it, stairs are often built of it, and many a room is paved with slabs of it worn smooth by years of scrubbing and the treading of successive builders of centuries 7 с Photos, John Wallace Gillies generations. It is durable enough to stand the weather without crumbling, and it is of a texture fine enough to be a medium for the most delicate carving. Even períorated finials and other deftly wrought details exposed to the elements show comparatively little erosion, and the roof tiles are so time-resisting that old tiles, on account of their mellow color and lichen growths, are at a high remium for new roofs throughout the Cotswolds. When fresh-hewn from the quarry, the lime stone is of a beautiful creamy color and so soft and close-grained that it can readily be cut with a nife. Used indoors, it either retains this color or jleaches to an ashen hue. Outdoors it weathers to a diversity of colors, hardening the while. In walls it ranges from silver gray to rich tans, tawny browns, olive browns and orange ; on roofs it turns an indescribable silvery brown and har- bors all kinds of mossy growths and lichens. It is, in fine, par excellence the great and omnipresent uilding material of the Cotswolds and one of the chief factors of their architectural beauty. Half-timberwork of oak, with parged or stuc- coed nogging that was sometimes pebble-dashed, played a part in many of the older Cotswold but the "black and white" work was usually of a subsidiary nature. The filling or pug- ging between the timbers, in many cases, was wat- tled and dabbed, that is to say, the space between houses, House for O. B. Capen, Esq. Built at Bedford, N. Y. By Waldron Faulkner, Architect

Page 125

сл се Courtyard at House for O. Built at Bedford, N. Y. Waldron timbers was wattled with plastered over this background ; upon this “wattle and dab" work was spread the outer coat of stucco. osiers, and clay was parge or The weather boarding occurs chiefly in barns. Thatched rooís are almost in- variably made of straw, except in cases whe fetch reeds or е some special effort was made to rushes from East Anglia. There is neither coal nor iron in the Cotswold hills, —only limestone. It has, therefore, always been a purely pastoral and agricultural region. It was once a great wool raising country and the source of much of England's wealth. In the days ARCHITECTU Faulkner, RAL DESIGN Part One Main Entrance B. Capen, Esq. By Architect werc of the great wool merchants la sums spent on building, and the best craftsmen found constant employment. As is the wont of pastoral and agricultural communities, the people have al- ys been intensely conservative, and old man- ners with little change. With them have remained the old tradi- tions of the best craftsmanship, and even today many an old mason or thatcher has a stock of traditionary building lore at his fingers’ ends Most of the Cotswold domestic architecture is strongly tinctured with old Gothic building tradi- and small, w and traditions have lingered tion. Many of the houses, both larg

Page 126

April, 1930 THE ARCHIT ECT RAL FORUM 589 Entrance Waldron were built during the sixteenth and early seven- teenth centuries, and not a few date from the fifteenth, while here and there one comes across from vailing manner of building treasures remaining untouched earlier period, The pr is of the Tudor ап even y Stuart type with certain rities which add zest to the charm. Even the houses of the latter half of the seven nth century, and some of those built in the fore part of the « herence to the earlier style which seems singu- larly suited ation in Cotswold Is, a style sanctioned by the use of ghteenth, show a close ad- to interpre ma- centuries Court House for O. B. Capen, Built at Bedford, М. Y. Faulkner, from Architect Cotswold domestic arc one-sided, and it would there is only one Cotswol phases of eighteenth се frequent interpretation, in the pretation, too, and villages. Indeed, the ntecture, however, 1s not ye inaccurate to say that d manner, for the various ntury classicism found and very pleasant inter- ifferent Cotswold towns earlier influence of Sir Christopher Wren, and even that of Inigo Jones, may be seen plainly ref instance. Then, too, the 1 teenth century left easi ected in more than one nanner of the early nine y distinguishable traces, so that Cotswold house turies assumes a diversi yuilding through the cen- ty of shapes. But if we

Page 127

590 ARCHITECTURAL DESIGN Part One E SED ROOM LI меко ЗЕЕУАМТ 1 vo^ = 16 E BED ROOM... mee SLEEPING PORCH. ма. що” WNERS ROOM во x 10'6” E SECOND FLOOR PLAN cannot say that there was only one Cotswold man- ner, we can truthfully say that there was only one favorite and generally used Cotswold manner, and that was the Tudor and early Stuart manner with Gothic reminiscences, employed long aíter its use had been discontinued elsewhere. One of the most striking characteristics of Cotswold domestic architecture is its picturesque quality, a quality that has made it such a favorite theme for adaptation in America, But this pic- turesque quality which invests the houses with such compelling charm and prompts a spirit of emulation in architects and clients of the present generation is likely to prove a snare and to betray its imitators into absurdities and inconsistencies. That is, it is likely to prove a snare unless they frst take the trouble to go into a little analysis and discover whence it proceeds. Analysis will reveal the fact that Cotswold architecture is pic turesque, not because of deliberate and premedi- tated intent, but incidentally because of its abso- lute, straightforward simplicity and the honest and ingenuous use of materials according to their nature. In every respect, it is altogether spontane- ous. The drawings and sketches, for which this in- troduction is written, have faithfully caught the spirit of building in the Cotswold hills and reveal its eminently picturesque value with a literal ex- actitude free from any exaggeration or artist's li- cense of idealization, But fairness to the Cotswold builders of old demands that we of today accept their work in the spirit in which it was wrought, not stressing romantic and pictorial quality as the first and dominant essential but obtaining it as the consequence of candor in plan and of di- rect and sympathetic use of materials. PANTRY. STUDY เล ier |ріміма ROOM. | wo x too HALL л? NTRANCE Š [T LIBRARY. SUN RM 16 оти от AS FIRST FLOOR PLAN HOUSE FOR О. В. CAPEN, ESQ. BUILT AT BEDFORD, N. Y. BY WALDRON FAULKNER, ARCHITECT

Page 128

April, 1930 THE ARCHITECTURAL FORUM 591 GARDEN FRONT ENTRANCE DOOR HOUSE FOR O. B. CAPEN, ESQ. BUILT AT BEDFORD, N. Y. BY WALDRON FAULKNER, ARCHITECT

Page 129

592 ARCHITECTURAL DESIGN Part One < Photos. Van Anda CHAPEL nent- 0 5 неее 0 KENT CHAPEL. KENT, CONN ROGER H. BULLARD AND SHREVE, LAMB & HARMON, ASSOCIATED, ARCHITECTS

Page 130

April, 1930 THE ARCHITECTURAL FORUM 593 KENT CHAPEL, KENT, CONN ROGER H. BULLARD AND SHREVE, LAMB & HARMON, ASSOCIATED. ARCHITECTS

Page 131

BEACH CLUBS KENNETH M. MURCHISON EACH clubs are beach clubs, and there you are! Beach clubbing is a new form of amuse- yeing since that time ittle exclusive, when trippers and basket dogs that something ment which has sprung into when people wanted to be a our beaches got so full of parties and hot dogs and live just had to be done. So the and it has now attained a definite place in our so- each club was born, cial setup,—say what we may about democracy. Of course, to have a beach club one must have a beach, but near New York t ing less and less attractive, g ıe beaches аге grow- and the water is get dead and un-alluring 35 must have swim- ting more and more full of debris; therefore beach clu ming pools, and really, once a club builds a pool, the ocean or the sound or whatever else the club faces on, becomes deserted, and all the clubby stuff is done right in the pool. The Sands Point Bath Club is located quite near New York (one might say just a nice drink- ing distance away !), on a spit of sand extending out into Manhasset Bay on the north shore of Long Island, It has a preéminent position, and the marine life one sees from the veranda of the club reminds one of Fifth Avenue, with the motor- boats as numerous as the Fifth Avenue buses та band playing every night ле water and lights flash- and still, nevertheless, wit and moonlight on t ing on the pool, it makes the tired business man from the glad that smart fellow had the idea of a beach club in the first place. The Dunes Club at Narragansett, R. L, is a city some Photo. Underwood & Underwood much larger proposition than the Sands Point Bath Club, inasmuch as it has 30 sleeping rooms ed “week end house" for bachelors only, especially for t come by the fumes of salt wat French provincial style was cause the architects didn't know any other style, but bec to lend itself best to the sand dunes surrounding it and to suggest that it alwavs had belonged there. The most enjoyed feature of The Dunes is the out in ne single cabin is 12 x 10 16 x 12 feet. The Club member for 20 years for and baths and a so-cal hose who are over- er. Here again the followed,—not be- use it seemed rcles, group of 48 cabins, laic three semi-c all facing the beach. T feet in size, the double rents a single cabin to a $700 plus a small servi for $1600. The Club prc shower, one electric out terior painting. Everyt tenant, but with gay cretonnes, cushioned chairs, cellarettes and bars, they are the talk of Rhode Island and have attracted an enormous amount of attention during their one-year career. The Dunes has a pool for children and also many, many bathhouses, over half of them with showers. A large sun yard is provided for the males, where they gather and swap stories and ce charge, a double cabin vides the building with a et, an awning, and the ex- hing else is done by the compare sunburns. Everyone there dines on the porch too, during the summer, so at least they are spending most of the time in the open air where the sun is supposed to draw out most of the im- purities in one's system and in one's disposition! Dunes Club, Narragansett, R. 1. Kenneth M. Murchison, Architect 594