Architectural Forum / The Brickbuilder, April 1929
The text was read from the page scans by machine (OCR), so it has mistakes and its columns may run together. See the pages · About this title · At the Internet Archive
Page 1
IHE ARCH [TECTURAL FORUM IN TWO PARIS ARCHITECTURAL ENGINEERING BUSINESS PART TWO APRIL 1929
Page 2
sg dile Sl ID Es 9008? №, E Where they are away from snow and ice No garage is better than the doors which enclose it. That is why Slidetite equipped doors are such a good investment. And they not only assure your car the protection it deserves, but they save you an endless amount of time, trouble and annoyance. Because they slide inside the garage, Slidetite doors are not exposed to wind, rain, sleet, ice or snow. They won't blow shut. They won't stick. They won't sag, shrink or rust. Another advantage of Slidetite garage doors is that they do away with dangerous center posts, and thus give you an unobstructed, full-width opening. Slidetite, with lock-joint brackets, is packed in complete sets for 3, 4, 6 and 8 doors. To insure satisfaction buy complete sets only. New York -© + + AURORA, ILLINOIS, U.S.A. . . . chicago Boston Philadelphia Cleveland Cincinnati Indianapolis St. Louis New Orleans Des Moines Minneapolis Kansas City Los Angeles San Francisco Omaha Seattle Detroit Montreal * RICHARDS -WILCOX CANADIAN CO., LTD., LONDON, ONT. · Winnipeg R-W Garage Door Hard- ware includes a type and style to meet every con- ceivable condition
Page 3
April, 1929 BRICK FACE Natco Unibacker is a universal unit which pro- motes great speed of erection, and consequent labor economies. It is admirably adapted for use in all brick-faced load-bearing or curtain closure walls. A mechanical bond is provided every sixth course, so strong that full bearing value is allowed on the full masonry wall thickness. The weight of Natco Unibacker as compared with solid brick masonry materially reduces foundation and steel costs in large structures, without sacrifice of strength and permanence. Three courses of Natco Unibacker can be bonded with two courses of column covering. The mortar requirements are decreased one-third. Full bearing is provided for floor joists. The standard tile is dovetail scored for interior plaster, but can be furnished glazed on special order. NATCO THE COMPLETE LINE OF STRUCTURAL CLAY TILE TURN TO “SWEETS” THE ARCHITECTURAL FORUM 111 ot STUCCO Natco Double Shell Load Bearing Tile is designed for vertical web load-bearing walls to receive ex- terior stucco and interior plaster directly on its surfaces. The outstanding feature is the double shell web construction which provides a wide, non-continuous mortar joint, which positively seals the outside face cell structure, and positively prevents moisture passage from outside to inside by capillary attraction. With properly staggered joints all webs are brought into vertical alignment, developing maximum wall strength. Natco Double Shell Load Bearing Tile provides permanent fire safety; eliminates cutting and fitting; provides “built-in” insulation, which adds to comfort and economy; provides through the dovetail scored tile surface an ideal base for both plaster and stucco; prevents plaster discoloration by its non- continuous mortar joints; and furnishes chases for pipe and conduit installation. NATIONAL FIRE PRGOFING:COMPANY General Offices: Fulton Building, Pittsburgh, Pa. Branch Offices: New York, Flatiron Bldg; Chicago, Builders Bldg; Philadelphia, Land Title Bldg; Boston, Textile Bldg. In Canada: National Fire Proofing Co. of Canada, Ltd., oronto, Ontario
Page 4
112 ARCHITECTURAL ENGINEERING AND BUSINESS Part Two (Ihe Handbook of the Steel Window Industry Pee fo members of the Architectural and Lngineering l'afession j HIS new addition of “Drafting Room Stand- Casement, Projected, Donovan Awning Type, ards” (A. I. A. file size), was developed in Continuous, Basement and Underwriters’ Win- accordance with the simplified schedule of nomen- dows; Steel Frames; Tension, Torsion, and Rack clature, sizes, styles and division of products and Pinion Operators; Stock, Slide, Swing, Folding, recommended by the Bureau of Standards of the Bi-Fold, Lift, Lift-Swing, Industrial, Railroad, Fire U. S. Department of Commerce. It contains =ни SECRET Department and Hangar Doors; Steel Lintels. scale details of the application of steel windows, mechanical operators and steel doors to con- structions of all kinds including Double-Hung, The Handbook “Drafting Room Standards" contains practical and useful data for the archi- tect's office. Copies will be sent on request. OF SUCCESS TRUSCON STEEL COMPANY, YOUNGSTOWN, OHIO STEEL WINDOW DIVISION The Largest Company the World Over Manufacturing a Complete Line of Steel Building Products
Page 5
April, 1929 THE ARCHITECTURAL FORUM 113 The outstanding and exclusive feature of standard Raymond Concrete Piles is the use of these spirally reinforced steel shells that are left in place on every pile in the ground-—for very sound reasons. Raymond, Concrete Pile Com NewYork: 140 CedarSt. Chicago -IlllWest MomroeSt. Raymond Concrete Pile Co., Ltd., Montreal, Canada Branch Offices in All Principal Cities
Page 6
114 ARCHITECTURAL ENGINEERING AND BUSINESS Part Two KEWANEE. Water GARBAGE Heating BURNERS The By-Pass (a distinctive Kewanee кре feature) prevents the garbage from Every building must have hot water, thering the fire—the fl. ircu- ë Ий Gon 3 and amitti кунан and the most economical method of женин дани getting it is by using rubbish and garbage as part of the necessary fuel. Here is a real Kewanee Product — solidly built of steel, riveted. А water- heating garbage burner as strong and dependable as Kewanee Boilers. Three types—fourteen sizes to heat from 200 to 2600 gallons per hour Catalog 75 gives details KEWANEE BOILER CORPORATION Kewanee, Illinois Branches in 40 Principal Cities STEEL HEATING BOILERS RADIATORS WATER HEATERS TANKS AND WATER HEATING GARBAGE BURNERS
Page 7
April, 1929 THE ARCHITECTURAL FORUM 115 Ў А Advantages! 3,000 more “locking keys" to the square yard--a better bond. Thousands more steel strands--a more even distribution of reinforcing. A mesh that is completely embedded in the scratch coat--protection for the steel. No waste of plaster in droppage-- a base and reinforcing which makes-- Good Plastering Cost Less Samples and Circulars on request Obtainable everywhere. Prompt deliveries. NORTH WESTERN EXPANDED METAL Co. 1234 Old Colony Bldg. CHICAGO
Page 8
116 ARCHITECTURAL ENGINEERING AND BUSINESS Part Two lf your control of efficiency de- pends on exact and economical control of temperature, YORK engineers can help you as they have many in like situations. One consultation may point the way to refrigeration efficiency K ICE MACHINERY CORPORATION Ы
Page 9
April, 1929 THE ARCHITECTURAL FORUM 117 гә Leading Publishers Use BLOXONEND Flooring LOORS play a major role in the publish- ing of a newspaper. Absolute SMOOTH- NESS is essential to expedite trucking and to prevent the pieing of forms; QUIETNESS and RESILIENCE are important for the comfort of employees; Urmost DURABILITY is necessary to withstand the gruelling abuse a floor gets 365 days a year. That BLOXONEND meets these requirements is evi- ie d Flooring installed th h M * а охопеп ooring in t t i - denced by the fact that 75 of America's leadin$ news- partments of new home for eme New ety ыр, and Evening Journal. Geo. Pancoast, Engineer. С. E. papers have installed it. In addition to Hearst, users in- Birge, Architect. clude Cleveland News, New York Telegram, Chicago Daily News, Philadelphia Record and Kansas City Star. The durability, resiliency and lasting smoothness of BLOXONEND will appeal to your industrial or school client. Write for sample and specifications. CARTER BLOXONEND FLOORING COMPANY Kansas City, Mo. Branch offices in leading cities BLOX= =F ND FLO ORI NG | Lays Smooth Stays Smooth Bloxonend comes in 8 ft. lengths. The tough endgrain forms the wearing surface.
Page 10
118 ARCHITECTURAL ENGINEERING AND BUSINESS Part Two Residence of Mr. S. N. Hicks, Cherry Hills, Denver, Colo. W. A. Marean & A. J. Norton, Architects. Residence of Mr. Da- nm | A vid Lawrence, Washe >” \ ington, D. C.; nad ‘There can be but one “Best” RICE is the most unimportant thing in the world—when an automobile won't run or an incinerator won't w-o-r-k. The Kernerator is made by a permanent, solidly organized com pany which introduced flue-fed incineration 15 years ago. It has never been successfully imitated—in design, quality of parts or in the thoroughness with which it destroys all garbage and waste without fuel. The owners of many of the homes it serves read like "Who's Who". Some of them appear below. But remember this—the owner of a bungalow is often a severer critic of poor performance than he who dwells in a mansion. Miss Anne Morgan, New York Senator James Couzens, Detroit, Mich. Payne Whitney, Manhasset, L. I. Booth Tarkington, Indianapolis, Ind. Samuel Appleton, Marblehead, Mass. L. M. Alexander, St. Petersburg, Fla. S. Z. Mitchell, Locust Valley, L. I. John Е. Jelke, Jr., Lake Forest, Ш. Senator Walter Edge, Atlantic City, N. J. Craig Cullinan, Houston, Tex. Residence of Mr. F. Dr. Gilbert Grosvenor, Washington, D. C. E. B. Stern, New Orleans, La. L. Maytag, Newton, H. Watt Ellison, Richmond, Va. Judge Wilson A. Taylor, St. Louis, Mo. Iowa. Cervin & Horn, Asa G. Candler, Atlanta, Ga. Newton D. Baker, Cleveland, Ohio Architects, Rock Is- Chas. E. Ringling, Sarasota, Fla. Fred'k B. Patterson, Dayton, Ohio land, Ill. Edsel Ford, Detroit, Mich. nni „ш. The Kernerator was selected for each of the Model Homes of the Home Owner ч "d i e Institute in 30 principal cities. "m ) See Sweet's, write for Kernerator catalogs in a ready-to-file A. I. A. Folder or “phone your local Kernerator representative. Offices in over тоо cities. f Ci KERNER INCINERATOR CO. m TRO 641 East Water Street Milwaukee, Wisconsin — >. ERNERATOR INCINERATION Garbage and Waste Disposal for New and Existing Buildings Residence of Mr. J. Ogden Armour, Lake Forest, Ill. Arthur Heun, Architect.
Page 11
April, 1929 THE ARCHITECTURAL FORUM 119 Old Fashioned Ha Puddled Come E Wrought lron Pine Made by the Genuine Wrought Iron process adopted by the founder in 1852, Cohoes Pipe has un- swervingly kept the faith with architects, builders and contractors. One pipe with one ideal — to be impervious to acids or the elements. Cohoes has no substitute. Send for our hand book "Pipe Facts" for complete information regarding uses and sizes. by д. Ж | COHOES ROLLING MILL CO. © COHOES., NEW YORK BRANCH OFFICES: PHILADELPHIA - CHICAGO -LOS ANGELES-NEW YORK- CLEVELAND-BOSTON-NORF OLK F.J. WHITNEY, Western Sales Manager. 1041 Citizens National Bank Building, LOS ANGELES
Page 12
120 ARCHITECTURAL ENGINEERING AND BUSINESS Part Two LCE ИПТТТТТЕРНИЕТЕТОТЕИИТЕТИИ Ө Hearst Publications Building, 8th Ave. and 57th St., New York, N. Y. Joseph Urban, architect; Geo. B. Post & Sons, associate architects; Turner Construc- tion Company, builders; Eugene Duk- lauer, plumbing contractor. Jennings Vacuum Heating Pump, for removing condensation and air from re- turn line heating systems. where quality is wanted In the construction of the new Hearst Publications Building in New York, quality products only were installed in the heating and plumbing systems — quality valves, piping, fixtures, and, of course, a Jennings Vacuum Heating Pump. THE NASH ENGINEERING CO. 12 WILSON ROAD, SOUTH NORWALK ONN. Jennings Pumps
Page 13
April, 1929 THE ARCHITECTURAL FORUM 121 The new Fidelity-Philadelphia Trust Build- ing in Philadelphia . . . designed by Simon & Simon, Architects, is protected against any outside current interruption with Exide Batteries for Emergency Use. NO Light Failure Here The architect protected the new Fidelity-Philadelphia Trust Building with Exide Batteries for Emergency Use ша ши a) аш аш ya muü m wm am ышы ыш má ка Wa wma ы md mU Nd Ad GS XJ Thislarge Emergency Lighting Battery of 60 cells has a ca- pacity of 1600 ampere hours at the 8-hour discharge rate, cap- able of carrying an emergency lighting load of 33,000 watts for two hours to a final voltage of about 105 volts at the bat- tery terminals. The battery is connected to emergency cir- cuits, providing lights in the bank, elevatcrs, stairways and basement rooms, in case the power supply to the building isinterrupted. The battery is also connected at all times to the control cir- cuits of the oil circuit breakers in the power supply system, and tothe clock, fire alarm and watchman's circuits. It is kept fully charged by means of a small motor gener- ator or trickle charger, floating across its terminals at a low charging rate. In theevent of an emergency lighting discharge, the battery is afterwards charged from a large motor generator set of sufficient capacity to fully recharge the battery within 12 hours, after which it is again placed on trickle charge with the small motor gener- ator. NOTHER huge structure protected against light failure. For, today, the Architect guards the hospital, school, auditorium, office building, against the chance of current inter- ruption. And he specifies protection that is flexible and reliable. His building needs vary, but the pro- tection must never vary in dependability. The natural choice is Exide Batteries for emergency use. They are available in a wide range of sizes. They are designed with forty-one years’ experience behind them and are controlled with simple and automatic devices. Consult an experienced Exide Representative. This entails no obligation. Just write. Exide EMERGENCY LIGHTING BATTERIES THE ELECTRIC STORAGE BATTERY COMPANY, Philadelphia Exide Batteries of Canada, Limited, Toronto
Page 14
122 ARCHITECTURAL ENGINEERING AND BUSINESS Part Two THE ARCHITECTS OF AMERICA ARE INVITED TO ATTEND THE THIRD ARCHITECTURAL AND ALLIED ARTS EXPOSITION — WHICH ACCORDING TO EMINENT AUTHORITY “WILL CLIMAX THE GREATEST EXHIBI- TIONS OF ARCHITECTURE AND THE ALLIED ARTS EVER HELD ANYWHERE." APRIL 15TH—27TH 1929 AT GRAND CENTRAL PALACE NEW YORK UNDER THE AUSPICES OF THE ARCHITEC- TURAL LEAGUE OF NEW YORK AND WITH THE ENDORSEMENT OF THE SOCIETY OF BEAUX-ARTS ARCHITECTS AND OF THE NEW YORK BUILDING CONGRESS.
Page 15
April, 1929 THE ARCHITECTURAL FORUM 123 EAEE PELUSA PET РЕМА i. Supreme Tribe of Ben Hur, Crawfordsville, Ind. Building ааа Hiessie-Simplex Boilers SAVE ^ 2.600 a Wear “For a number of years we pur- chased heat for our 5-story building which contains approx- imately 14,000 square feet of radiation from a public heating plant. This service cost us from $5,400 to $6,000 per year. **Last year we installed two Heggie-Simplex Boilers, with oil burners. The total cost of oper- ating them during the first heat- ing season was only $3,400. That is, we saved over previous years $2,000 to $2,600. *Inaddition wekept the building heated for a longer period of the year than we had formerly done.” (Signed) J.C. SNYDER, Supreme Chief Supreme Tribe of Ben Hur, Crawfordsville, Ind. v P | | | $ It will pay you also to use Heggie-Simplex Boilers in your buildings—in the new ones to assure, at the start, Ert EET — maximum efficiency and D 1 + economy —in the old ones to ‚ reduce heating costs hun- dreds, perhaps thousands of dollars annually. "TEL Heggie-Simplex Boiler Co., Joliet, Ill. Representatives in principal cities — telephone and address listed under **Heggie-Simplex Boilers.” HFGGIE- SIMPI ЕХ STEER HEATEANG BOILERS
Page 16
124 ARCHITECTURAL ENGINEERING AND BUSINESS Part Two When You Are In Chicago We will be delighted to have you call at our new offices 75 East Wacker Drive MATHER TOWER BUILDING Seer} "HE ARCHITECTURAL FoRuM is pleased to announce that its mid-western staff is now located in new offices in the Mather Tower Building, 75 East Wacker Drive, Chicago, Ill. Together with the staffs of the other fifteen publications which make up NATIONAL TRADE JOURNALS, Inc., they are now occupying the entire sixth floor of this beautiful new structure. With all modern facilities now available to make for prompt and efficient service, the members of THE ARCHITECTURAL Forum staff extend a cordial invitation to all their friends to call. m mE i Ь | I Br Demon If visitors wish to make our offices their business head- quarters while in Chicago, they will be furnished a private office for conferences and with stenographic, telegraphic and mail service to suit their requirements. Delivery of telegrams and mail will receive most careful attention. T9 Hm orem 4 T As now organized, there are four groups, and a nucleus for a fifth, making up NATIONAL TRADE JOURNALS, INC., each group having their respective staff in these offices. These groups are: National Building Publications; National Food Products Publications; National Diesel Publications; National Sports Publications; and a Na- tional 'Textile Publication. Specialty Salesman Magazine is also a property of NATIONAL TRADE JOURNALS, INC. =a ts = e =——— The magazines of NATIONAL BUILDING PUBLICATIONS are THE ARCHITECTURAL FonvM, BUILDING Аск, HOME BUILDERS CATALOG, GOOD FURNITURE MAGAZINE, THE HEATING & VENTILATING MAGAZINE. Mather Tower Building is conveniently located for business visitors to Chicago. THE ARCHITECTURAL Forum staff will welcome the opportunity to serve you when you are in Chicago.
Page 17
April, 1929 THE ARCHITECTURAL FORUM 125 CRAFTSMANSHIP is the first element in VAN KITCHEN EQUIPMENT A specially de- signed machine in the Van Fac- tory bends pipes to any desired shape. AN CRAFTSMEN have at their hands the most ingenious machinery, the most durable materials and the latest scientific designs — to which they add their own incomparable skill of manufacture. Not by chance has the Van plant grown from a modest origin seventy years ago to the largest kitchen equip- & а è Those who use and those who specify equip- ment factory in the world. It is the personal pride of ment invariably prefer Van products —because of low cost, negligible upkeep and long life. Shown here is part of a recent Van Kitchen in every Van Craftsman that his handiwork shall be superior to any you have ever known, shall cost less a istian B. Holmes Hospital, Cincinnati, than you expect, and outlive your expectations for it. Samuel Hannaford & Sons, Architects. The Great VAN FACTORY c3 ойе John Van Range@ 2 e See SWEETS, pages C4040 to C4045 for EQUIPMENT FOR THE PREPARATION AND SERVING OF FOOD important architec- Cincinn ati tural information. DIVISION OF ALBERT PICK-BARTH COMPANY, INC. Chicago Sales Office Detroit Sales Office New York Sales Office 1200 West 35th Street 180 East Larned Street 38 Cooper Square
Page 18
126 ARCHITECTURAL ENGINEERING AND BUSINESS Part Two uL ШП + A typical Frigidaire cooler for The Chas. E. Hires Company’s Puroc bottled water installed in the lobby by one of Philadelphia’s banking institutions for the convenience of its patrons. oof! 3,000 Frigidaire Water Cooler Units installed by a single water company in 10 months F you have any doubt as to the wide application of Frigidaire-equipped Water Coolers, read this inter- esting letter. “Our first frank reaction was that the public would not think of drinking water in terms of electrical refrig- eration, but after trying the idea out, there seemed to be no question as to the receptive mood of the average office and industrial plant. They could not overlook the value of convenience, sanitation and properly cooled water.” “The result has been that in the past ten months with but very little advertising we have succeeded in placing 3,000 Units.” “We can attribute our success to the fact that there is a distinct need for an apparatus of this kind, and, due to the public’s confidence in Frigidaire’s mechanical performance, appreciation of its convenience, its sani- tary features and its attractiveness, it has not been very difficult to interest the average user of Water Coolers.” . | Charles E. Hires, Jr., President, The Chas. E. Hires Company, Philadelphia. Such experiences as this demonstrate that buildings are more salable, more rentable—more profitable in every way when equipped with Frigidaire Water Coolers. Let us send you the facts and show you how our complete line can furnish the service adapted to your specific needs. Let us quote the favorable G. M.A.C. terms to architects and builders by use of which pay- ment can be made out of income, if desired, rather than out of capital. Frigidaire Corporation, Subsidiary of General Motors Corporation, Dayton, Ohio. FRIGIDAIRE PRODUCT GENERAL MOTORS
Page 19
"U. S." Paracore Rainbow Finish And many years from now- This permanent record of your electric cir- cuitsmay save yourclient from added expense These 8 colored wires give you a permanently marked wiring system—a different colored wire for base outlets, side wall outlets, main outlets, switches, etc. The Rainbow Line of “U.S.” Paracore Wires costs no more than ordinary black insulation wire. With the Rainbow Finish, circuit testing is practically eliminated. Alterations and addi- tions are easily and quickly made. Saves time in checking the contractor’s work. Years after your building has been erected a stranger to the job can trace out the electric circuits as easily as though they were on blueprints. The Rainbow Line of “U.S.” Paracore Wires is a valuable addition to the present complete line of wire now furnished by the United States THE RAINBOW LINE OF “U. S." Rubber Company. It is made with all the skill, resources and facilities that are at the command of this world-wide organization. “U. S.” Paracore Wire — Rainbow Finish— can be furnished from size No. 18 A.W.G. to 1,000,000 C.M., and in Code, 30%, and Inter- mediate grades. Judge the many advantages of this outstand- ing advance in wire manufacturing yourself. Samples on request. Please address inquiries to Room 409 of the New York office, or to the “U.S.” branch nearest you. United States (y 1790 BROADWAY - NEW YORK Branches in every industrial center Rubber Company PARACORE WIRES & CABLES
Page 20
128 ARCHITECTURAL ENGINEERING Guaranteed sound insulation e. o 5| o [dS available for the better. apartment buildings Sound insulation of real effectiveness is today considered essential in the better apartment buildings. Tenants and particularly owner- tenants are demanding, in ever increasing num- bers, privacy and freedom from noise intrusion. Recognizing the serious problem which this demand presents to architects, the United States Gypsum Company has made available a system of sound insulation with a written guaranty of effectiveness . . . at a cost which makes it practical for use in apartment buildings. The USG System is not a material, but rather is a supplemental construction of a fire- proof nature, which provides sound insulation for floors, partitions and ceilings, as well as for all types of mechanical equipment. It is in- stalled only on a contract basis, thus assuring undivided responsibility. AND BUSINESS A few USG sound insulated buildings Park Lane Apartments, Hackensack, N. J., Arthur E. Dore, Architect . sound insulation of partitions between apartments. *Phelps Apartments, Cincinnati, Ohio . . . sound insulation of par- titions between apartments. *Rilz Carlton Hotel, Boston, Mass. . sound insulation of partitions and doors between suites. Kingsley Arms Apartments, Asbury Park, N. J., E. П. Schneider, Archi- tect... sound insulation of sleeping rooms from dance floor above. Medinah Athletic Club, Chicago, Ш., Walter W. Ahlschlager, Archi- tect .. . sound insulation of bowling alley, rifle range, ladies’ plunge, rest room, elevator machinery rooms, telephone booths. Union Building, Pittsburgh, Pa., Hanna and Sterling, Architects . .. sound insulation of apartments from bowling alleys below. *Raulf Hotel, Oshkosh, Wis. . . sound insulation of theatre and hotel from bowling alleys below. Sherman Square Studios, New York, N. Y., Tillion & Tillion, Architects . complete sound insulation of studio apartments. *Installed after building completed and occupied. Part Two A consulting service is available, without tion address Sound Insulation Depart- US obligation, on all problems concerning the pre- ment, United States Gypsum Company, vention of noise transmission. For full informa- Dept. 27K, 300 W. Adams St., Chicago, Ill. USG SYSTEM OF SOUND INSULATION Created by the United States Gypsum Company
Page 21
April, 1929 THE ARCHITECTURAL FORUM 'The Lincoln Building, New York City. Another 100% Youngstown Pipe and Youngstown Buckeye Conduit job. Architect, J. E. К. CaRPENTER—A ssociate Ar- chitects, E. J. WiLLINGALE, KENNETH B. Nor- TON, WM. HARMON BzrERs—Consulting Engineer, CLYDE R. PLace—Builder, DwicuT P. ROBINSON & Co., Inc. “Мо Sounder Specification Can Be Written f) HE NAME YOUNGSTOWN on Pipe or Sheets and “Youngs- town Buckeye” on Conduit is a safeguard of quality and a symbol of lasting service. Leading architects and engineers have found through wide experience that no sounder specification than Youngstown can be written. In thousands of buildings Youngs- town pipe is proving its permanence in plumbing, heating, sprinkler and refrigeration systems; Youngstown Buckeye Conduit is demonstrating its lifetime protection to electrical wiring; and Youngstown steel sheets are giving abundant evidence of lasting serviceability on all types of sheet metal work. Every district sales office of The Youngstown Sheet & Tube Company is a “service station” for Architects and Engineers, where an experienced steel-trained counsellor will be found anxious to serve you—without obligation. THE YOUNGSTOWN SHEET AND TUBE COMPANY One of the oldest manufacturers of copper-bearing steel, under the well-known and established trade name “Copperoid”. General Ofices—YOUNGSTOWN, OHIO DISTRICT SALES OFFICES PITTSBURGH-—OI S. NCISCO. ATLANTA —Healey Bldg. DETROIT —Fisher Bldg. BOSTON —80 Federal St. KANSAS CITY, MO.— BUFFALO- Liberty Bank Bldg. Commerce Bldg. MINNEAPOLIS — Andrus Bldg. CHICAGO —Convway Bldg. CINCINNATI—Union Trust Bldg. NEW ORLEANS- Hibernia Bldg. CLEVELAND —Union Trust Bldg. NEW ҮОКК —30 Church St. DALLAS—Magnolia Bldg. | PHILADELPHIA— DENVER—Continental Oil Bldg. Franklin Trust Bldg. PIPE SHEETS 55 New Montgomery St. SAVANNAH-—M and M T Terminals "EIL ST. LOUIS—Shell Bldg., 13th and Locust Sts. YOUNGSTOWNT- Stambaugh Bldg. LONDON REPRESENTATIVE—The Youngstown Steel Products Co., Dashwood House, Old Broad St., London, E. C. England CONDUIT YOUNGSTOWN 129
Page 22
Insulation ARCHITECTURAL ENGINEERING AND BUSINESS Part Two Balsam-Woolisa guaranteed Weyerhaeuser product—a blanket of fluffy wood fibre that looks and acts like sheep's wool. Itis TRUE In- sulation—keeping the house warm in winter and cool in summer—because it is— FLEXIBLE-THICK EFFICIENT WINDPROOF WATERPROOF FIRE RESISTANT VERMIN PROOF LIGHT WEIGHT PERMANENT 4 is a VITAL part of HEATING EQUIPMENT SOLD Because its purpose is to save heat and conserve fuel, house insulation should be considered a part of the complete heating equipment. If true insu- lation is selected the savings it effects will quickly repay the cost and provide luxurious comfort. Balsam - Wool is true insulation — made for no other purpose. Because of its high efficiency in making the house heat-tight a reduction of at least 25% in necessary radiation can be made where full inch blanketing is specified. And every year fuel costs can be cut from 25% to 40%. Balsam -Wool is not to be confused with rigid types of insulation. It is flexible —a light, thick, woolly blanket of wood fibre that tucks into cor- ners and crevices and molds snugly into spaces T H RO U GH RETAIL between joists, studdings and rafters. A full inch blanketing seals the heat in — seals the cold out. Think of Balsam-W ool and the heat it conserves when specifying heat-producing equipment. Make the heating job complete. But first let us send you samples and full technical data. Let us answer your questions — give you plain facts on one of today's most important building topics. WOOD CONVERSION COMPANY CLOQUET, MINNESOTA Makers of Balsam-Wool, the Flexible Insulating Blanket. Also Makers of Nu-Wood—the All Wood Insulating Wall Board and Lath Sales Offices: New York, 101 Park Ave.—Detroit, 515 Stephenson Bldg.—Chicago, 360 N. Michigan Ave.—Minneapolis, Baker Bldg. Kansas City, 231 W. 47th St.—Seattle, 6659 White Bldg. LUMBER DEALERS
Page 23
April, 1929 THE ARCHITECTURAL FORUM 131 The prestig e of the AMERICAN RADIATOR COMPANY is back of the name plate* IDEAL GAS BOILERS the best guarantee of GAS HEATING SATISFACTION Send for full information to AMERICAN GAS PRODUCTS CORPORATION 376 Lafayette Street New York м Distributor
Page 24
132 ARCHITECTURAL ENGINEERING AND BUSINESS Part ‘Two Residence of Harry S. Johnston, 1975 Lake Drive Roy Oliver Papenthien, Architect Milwaukee, Wis., YN CINOR-equipped Successor to Velguth & Papenthien “INCINERATION”—OF COURSE You too should specify “‘/zcinor’’— the Clean, Odorless Way— With Gas! Mr. Roy Oliver Papenthien, by specifying a handful of odorless, sterile ash— safely, INCINOR in the beautiful modern homes cheaply, completely, quickly. Is in- he designs, banishes the ever-looming fire stalled as easily as a gas range in the hazard and the disease-ridden basement of any home—new or garbage receptacle for INCINOR, the Home Incinerator, destroys both garbage and trash as fast as “modernized,” large or small. Investigate /zcizor and you'll always specify INCINOR. It is the most satisfactory way to dis- pose of trash and garbage—it’s "the decent way." Send the coupon it accumulates—burning it by gas —the new way, “the decent way." INCINOR dries and reduces bush- els of refuse or garbage at a time to Sweets Catalog C-4089 HOME INCINERATOR CO., MILWAUKEE, WISCONSIN SECURITY BUILDING -INCINOR: THE HOME INCINERATOR Good Riddance GARBAGE.. RUBBISH.. TRASH at once! (01929, H. I. Co. HOME INCINERATOR COMPANY =! E s Dept. I4, Security Building, Milwaukee, Wis. po cere eects Senescence eats tte Serotec Please send me free Architectural File data on home incineration. TIS Sp i cata E Me Dese et
Page 25
April, 1929 THE ARCHITECTURAL FORUM 133 Oneof the pu Better Boiler For Less! Ne jacketed in flaming orange and black, more efficient and econom- ical, with improved automatic draft reg- ulation and larger fuel capacity — the New Pierce- Eastwood Sectional Boiler is the choice of architects who compare! And more — architects will observe how easily and quickly it is installed — will recognize here a very real saving for their clients. Sectional and of push-nipple construction, the New Pierce-Eastwood is the easiest type of boiler to handle and erect. Its six piece jacket is built with continuously formed corner flanges as part of the panels to which the insulation is perman- ently attached. The jacket with its insu- lation is quickly assembled. Setting up a few screws holds it snugly and securely in place. Ask the nearest Pierce Man about this new economy or mail the coupon for com- plete information. PIERCE BUTLER & PIERCE MANUFACTURING CORPORATION 41 East 42nd Street, New York, N Y Western Distributors— PE The Kellogg-Mackay Company ote: 1351 W. 37th Pl., Chicago, Ш. Tu E ees е” | | set ur" | 0 s n i сё E i Р e gr “ | E V Pi ] +° Be MA | | BOILERS RADIATORS e ut aP S 2 | o Ж р? kd j | AND | us (tan DU ETT NE Ay | | РРА A Sto ev б A^ ^ | 7 SAE a OO ur
Page 26
134 ARCHITECTURAL ENGINEERING AND BUSINESS Part Two ONLIWON TOILET PAPER ONLIWON TOILET PAPER ONLIWON TOILET PAPER ONLIWON TOILET PAPER A letter from the purchasing agent of the Milwaukee Public Library ONLIWON TOILET PAPER ONLIWON TOILET PAPER ONLIWON TOILET PAPER ONLIWON TOILET PAPER F. BRADY writes: ''We finally 'fellfor' trying e folded toilet paper other than Onliwon on the basis of lower first cost. Never again. Not only did we substantiate all your claims but also the test that we made in 1922, which showed a saving of the differ- ence between 478 2000-sheet rolls and 338 pack- ages of 1000-sheet Onliwon. By buying A.P. W. 2nliwon we found we could show an additional sav- ing. This is due in part to the fact that many of our people have been with us for years and, like the writer, believe that the better the sheet the less ex- pensive it is."' Onliwon can materially reduce the toilet paper item in your budget. Onliwon tissue is approved by physicians because it is smooth, efficient and strong. This efficiency is not only an important health factor—it is further assurance of economy. What the unique Onliwon cabinets mean А. P. W. Onliwon cabinets ate designed to dispense Onliwon toilet paper cabinet in solid white porcelain. ; Ў Nickel silver door with lock to prevent theft of paper. two sheets, only, at a time. They work. Rolls or ordi- nary flat sheets are illogical for your purpose. They encourage waste; they are often carried away even before they are put into the fixture. Onliwon cabinets save labor because they are quickly, readily filled. The indicator shows contents at a glance. Inferior service, often put up with on the basis of “‘cost,’’ records show is invariably more expensive. Let us give you further information as applied to your specific field. Just mail the coupon. THE ORIGINAL | Please mail tbis coupon A. P. W. PAPER CO., Albany, N. Y. We are interested in the story of Onliwon Toilet Paper. Without obligation to us, send us further data. TOILET PAPER AND | PAPER TOWEL SERVICE г, Е ONLIWON TOILET PAPER ONLIWON TOILET PAPER ONLIWON TOILET PAPER ONLIWON TOILET PAPER
Page 27
Ф BOOK DEPARTMENT Ф "THE FERRO-CONCRETE STYLE” A REVIEW BY CLIFFORD WAYNE SPENCER F the new style of architecture which is undoubtedly now in the process of development is to have a permanent place in the annals of architectural history, it is evident that it will have to be known by some less transitory and more descriptive name than any of those now in general use. In centuries to come it will doubtless seem highly incongruous to speak of a style of archi- tecture developed.in the first half of the twentieth cen- tury as the “modernistic” or "contemporary" style. In choosing a definite and permanent name for this type there is much to be said in favor of calling it "the ferro- concrete style," since it is largely by the use of this com- bination of materials that the new effects are made possible. All the great traditional styles of architecture have had their inception immediately following the dis- covery of new materials or of new methods in the use of materials which were old. By the use of iron and steel in connection with concrete the chief structural limitation of the traditional styles has been overcome,— that of not being able to build extensively in the third dimension. Due to the nature of materials available, it was necessary to build vertically,—one stone or one brick above another, so that all the emphasis was neces- sarily placed on the vertical treatment. Now, however, by the use of reinforced concrete it is possible to extend unsupported members horizontally for much greater dis- tances, and since all good design must conform to con- struction possibilities, an entirely new field in archi- tectural design is thus opened up. The ability of modern engineering science to ascertain accurately the support- ing power of structural members affords unlimited opportunities to the present-day designer. The slowness of architects, especially in this country, to take advantage of these opportunities is probably due to a rather general, erroneous belief that concrete is not adaptable to esthetic treatment in design. The book entitled “The Ferro-Concrete Style," by Francis S. Onderdonk, should do much in correcting this mistaken opinion, since merely to glance at the illustrations is enough to impress one with the fact that so far as form is concerned, use of reinforced concrete has no limits. This fact is brought out by illustrations of such remark- able examples as a garden statuette showing a gracefully poised figure, with wings, rendered in concrete and steel, and another illustration showing a pavilion suspended in mid-air with no means of support other than the stair- way leading up to it. The author points out that it is generally true that those living at the times of great achievements remained ignorant of their advent, and that the general public, as well as the majority of archi- tects, do not now realize that we are witnessing the birth of a new architecture, and that the false opinion in the minds of many as to the design possibilities of concrete is due to the habit of considering the limitations of con- crete design as identical with those of wood form con- struction. As a matter of fact, using wood centering is only one of many ways ef shaping concrete, and many of the others are much more suitable from a design point of view. One of the valuable features of the work is that while the design possibilities are given greatest impor- tance, the text matter gives much technical and practical information as to the up-to-date methods of handling this adaptable material. 'The author of the work was born in New York, but he spent 20 years of his life in Europe, where he re- ceived his architectural training and devoted much time to investigating the possibilities of ferro-concrete archi- tecture. He is now a member of the faculty of the College of Architecture of the University of Michigan, so it may be said that his viewpoint is international, which adds greatly to the interest and value of the work. France, the country in which Gothic architecture had its greatest development, seems to have taken the lead in using the new style of design, and the examples of ferro- concrete work found there and in Germany, as well as in some of the other continental states, are generally much more advanced than those found in America, al- though a great deal has been done in the Pacific coast region. True, a great deal of the so-called modern work is trashy and has been done by those who have not sufficient background to do good work in any material, and yet there are plenty of good examples to point the way to a rational development and to show the possi- bilities latent in the style. Many of the illustrations in this volume are chosen with a view to showing that which is bad as well as what is worthwhile, and the text ex- planation as to why certain things constitute poor design will give a good basis for developing an appreciation of the good in this new architectural style. Perhaps the two most characteristic features of the ferro-concrete style as yet developed, and features that are destined to play a most important part in its future development, are the use of concrete tracery and the parabolic arch. Concrete tracery has been used consider- ably both on our own Pacific coast and in Europe, and it offers a great many new possibilities in the decorative treatment of wall surfaces. The tracery is formed of reinforced concrete in an unlimited variety of pattern, and the apertures are often filled with glass, thus taking the place of windows and achieving very beautiful effects both in the daytime and at night when they are lighted from within. This concrete tracery is being used in residence work as well as in more monumental buildings such as the Bahai Temple at Wilmette, Ill., which is to 135
Page 28
THE ARCHITECTURAL FORUM BOOK DEPARTMENT Part Two “School Building Programs in American Cities" By N. L. ENGELHARDT Professor of Education, Teachers College Columbia University HIS volume is the most compre- hensive and thoroughgoing treatise on the planning of school building pro- grams which has yet been published. It illustrates clearly, by definite reference to specific cases and places, how school building programs should be developed. It includes the latest technique used in analyzing school building needs. The variety of situations presented makes it possible for a superintendent to adapt the specific methods of study to his own local school conditions. The volume represents a cross-section study of school building conditions in the United States. School building condi- tions in the east, the north, the south, and west are represented in this volume. WELL DEFINED school building program is an essential need in every school system. Hundreds of thou- sands of dollars are spent annually for school buildings. School boards, school superintendents, and school architects should spend this money only in terms of a definite plan of program. "This vol- ume will assist very materially in safe- guarding future expenditures and in providing school conditions which will be superior for the children of many communities. 560 Pages. Contains 97 Tables. 20 Charts, 120 Maps, and 70 Illustrations. Price $5. THE ARCHITECTURAL FORUM 521 FIFTH AVENUE NEW YORK have a dome formed completely of concrete tracery. The use of concrete tracery will enable the architect to "fulfill his supreme duty to create poetry and tell stories in stone" much more readily than ever before. Wall surfaces treated in this way can be made as decorative or as simple as may be desired without losing any of their structural soundness. The record characteristic feature of the ferro-concrete style which is stressed by Mr. Onderdonk is the beautiful parabolic arch. Re- inforced concrete structures have the advantage of being made up of one complete mass and not having reams or joints as is the case with other materials where columns or walls are laid up and the intervening spaces spanned by horizontal members or arches of very limited extent. In the new designs, arches based on the parabola, nearly vertical at the base and curving gradually more and more till at the top it approaches a semi-circle, permit of vastly greater unimpeded floor areas, and produce buildings of great dynamic beauty. The parabolic arch is more or less familiar in bridge construction, but it has not been used extensively for buildings in this country. In Europe, however, a surprising number of important buildings have been built from designs based on the parabola. The collection of illustrations of this type of building con- tained in this book is very complete and well chosen, and one cannot help being inspired to a firm belief in the future of this style. In addition to being a remarkable treatise on the use of ferro-concrete architecture, this volume may be said to be one of the most complete and inspiring recent works on modern style in architecture. THE FERRO-CONCRETE STYLE. By Francis S. Onderdonk. 265 pp. 8x11 ins. Price $12. Architectural Book Publishing Co., New York. THE VILLA MADAMA. By W. E. Greenwood. 76 pp., 10x 1234 ins. Price $20. William Helburn, Inc., New York. A FELLOW of the Institute of British Decorators, this author shows great fidelity to and love of his subject in his compilation on the Villa Madama, and his publisher is equally to be congratulated on producing a fine piece of book making. This volume, of some 75 pages of text, has been generously enriched with fine color reproductions, to the number of about 30 plates. It has the extraordinary advantage over most architectural studies of being, within its limited scope, exceedingly scholarly and well annotated. The full color reproduc- tions are not only delightfully done and well reproduced, but they present a very complete synthesis of what is probably the most representative, and possibly the finest, bit of Italian Renaissance wall and interior vault decora- tion still existing. They will be invaluable to any archi- tect working in that style. Mr. Greenwood has evidently made of this recon- struction a labor of love, and his text omits no detail of the subject which might for any reason be worth mentioning. In fact he precedes the introduction and historical notes with four pages of references which not only tie the Villa Madama in with the work of other students, but with other good contemporary examples. His references include the works of Vasari, and extend on down to the later German students, and the people whose imagination and genius went into this magnif- icent work come in for a series of illuminating notes. In his introduction, Mr. Greenwood says: “There is no doubt that the perfections we have hinted at in this work Any book reviewed may be obtained at published price from THE ARCHITECTURAL Бозум
Page 29
April, 1929 THE ARCHITECTURAL FORUM . 137 * * onvenient ... Miodem n Sane clephone ( )utlecs in nearly every Room The new way às to plan complete telephone arrangements in advance... for appearance, comfort, and efficient service 7T Y* F Тнімоѕ which are convenient, modern and smart appa to architects. They know the valuė of pro- viding those little touches which make a home more livable and more attractive, without adding greatly to its cost. Complete telephone arrangements . . . tele- phone outlets in nearly every room, for ease in placing and answering calls . . . form the new conception of convenience that is meeting with favor everywhere. Architects are finding it desirable to plan for these arrangements in advance. Provision is made in the plans and specifications for conduits, pro- tector cabinets, telephone cabinets, service en- trances and other facilities. Improved appearance is thus obtained and additional telephones can readily be placed, when desired, at convenient locations. Architects are recognizing the advantages of hav- ing homes completely equipped with telephone service; including such auxiliary equipment as arrangements for intercommunication among the household telephones: switches for temporarily disconnecting the servants' telephone: portable tele- phones for plugging into jacks atappropriate places: auxiliary bells, lights and other signaling [je н for special uses. If you have not yet received your copies of the two booklets, Planning for Home Telephone Con- veniences, and Planning for Telephones in Buildings, or if you desire additional information, it is sug- gested that you communicate with the Business Office of your local Bell company. Outline telephones indicate additional FIRST FLOOR
Page 30
138 THE ARCHITECTURAL FORUM BOOK DEPARTMENT Period Lighting Fixtures 7, By far the most complete and authoritative work on this im- portant subject, it is a study of lighting fitments of all the his- toric styles of architecture and decoration. Carefully written by Mr. and Mrs. G. Glen Gould and lavishly illustrated, the volume is a dependable guide in the designing of fixtures for the most severely simple or the most elaborate interior. 274 pp., 6 x 9 ins. Price $3.50 THE ARCHITECTURAL FORUM 521 Fifth Avenue New York v TPES IC KOC Y Y EE. T PREC iL Zn mem ESE PAPPP EHE РЕЛЕ P3 ap. : SHOP FRONTS English, American and Continental Examples Edited by FREDERICK CHATTERTON cA dy of the modern shop front, drawing for inspira- tion on the fine old fronts which still exist in England, France, and other countries of Europe. The volume includes in many instances plans and details. This is a work of practical value to architects called upon to plan and design the facades to small buildings, mak- ing them practical as well as architecturally attractive. 104 pp., 994x12 inch. Price $7.50 THE ARCHITECTURAL FORUM 521 Fifth Avenue New York Part Two are, as examples of mural decoration, among the finest, if not the finest, in the world today. They are certainly the best of the period, that golden age of art, of which the divine Raphael was the guide and shining light. As the same artists were employed on both the Vatican Log- gia and the Villa Madama, and as the work at the Villa was executed after the completion of the decorations in the Vatican, the artists had, of course, profited from their experience and perhaps from kindly criticism. We in this later age may be over-critical, but many of the criticisms that can be leveled against the Vatican deco- rations cannot be made against those in the Villa Madama.” Libraries of Italy and the continent which have been delved into to enrich this volume have apparently yielded some remarkable facts. In his historical notes, the author in referring to them says: "We may well sur- mise that, were it not for a number of original drawings and plans that have, from time to time, been identified as bearing upon its genesis and construction, the Villa Madama would have had little interest apart from its marvelous interior decoration. These drawings, few though they be, and altogther inadequate for a complete understanding of the splendid project of Cardinal Giulio de Medici, are nevertheless of untold value. For they are intimate documents bearing upon the planning and decoration of what, had it been completed, would have been the most sumptuous villa of the Italian Renais- sance.” It would appear that the Villa Madama may be considered not only as an almost perfect example of the Italian villa of the Renaissance, but also as the most important example of the mural paintings of that period, particularly as representing the work of Raphael and his assistants. And Mr. Greenwood has gone into these matters carefully. He notes that, “when Bramante died and Raphael was made architect of St. Peter's, two worthy assistants were given him,—men whose know!- edge and talent had already been appreciated by Bra- mante. These two were Giuliano San Gallo and Fra Giocondo. As a matter of fact, Raphael had several tal- ented architects around him besides these, not the least being Antonio and Aristotile San Gallo. It was in 1516 that Antonio San Gallo joined him. Аз this was the date when, so far as we can ascertain, the Villa Madama was first projected, and a large plan of the Villa designed by Antonio has been identifed at the Uffizi, we need have no hesitation in affirming that, while Raphael may have inspired the first designs for ithe Villa and watched the work closely, it is to Antonio San Gallo that we must give the honor as its architect. From other plans existing in the Uffizi we know that we must also add the names of Battista and of Antonio, the younger. From 1516 to 1521 the work proceeded, and though only a part of the project as originally planned by San Gallo was actually completed, the plan seems to have been followed so closely that, as C'ausse says, 'the architect who was the author must have also superintended the execution.’ " And Mr. Greenwood is not without his prophetic vein. He is particularly pertinent, in this reviewer's estimation, where he calls attention to the inconsistency in our great architecture of today in the lack of application of cor- respondingly great mural treatment therein. It is dif- ficult to wholly agree with the author where he says “we need a greater demand for mural decoration to give Any book reviewed may be obtained at published price from THE ARCHITECTUFAL FORUM
Page 31
April, 1929 THE ARCHITECTURAL FORUM 139 ATTENTION “ do Paint Users DIXON’S | INDUST RIAL | PAINTS now made in. ; 14 COLORS ——— MÀ ma a Red Lead-Graphite Standard Red Oxide Primer Dark Red Extra Light Gray Light Green Light Gray Dark Green Battleship Gray Bright Aluminum Medium Gray B вне Dark Gray (Natural) Dark Aluminum- Black Graphite The present line of Dixon’s Industrial Paints—known for more than 65 years as Dixon's Silica-Graphite Paints—has been extended to fourteen standard colors, including a Straight Aluminum paint and a Standard Red Oxide paint. This provides a complete line of paints for the protec- tion of all industrial structures and equipment. Proven to be the most protective of paints at lowest cost per gallon, judged by years of service. Our laboratory facilities have been increased to provide for the matching of special colors. This laboratory is at your service to assist in the solution of your paint problems. DIXON’ S. Maintenance Floor PAINTS Made in 8 standard colors Write for new color card No. 224-BI PAINT SALES DIVISION. JOSEPH DIXON CRUCIBLE COMPANY JERSEY CITY, N. J., U. S. A. Established 1827 Light Gray Oak Dark Gray Dust-proof (i Rich Brown Special Tan Standard Mahogany Green Red À This paint has been developed à for the protection of wood, composition, cement, and con- crete floors of office build- ings, factories, hospitals, hotels, homes, ete. On concrete floors they will effectually withstand ‘“‘dust- ing" and the disintegrating effect of alkali. Send for Color Card 224 -BF в
Page 32
140 THE ARCHITECTURAL FORUM BOOK DEPARTMENT stimulus to artists and to arouse their latent powers." The present-day disuse of murals in our buildings has its cause rooted in something deeper. What we do need today is perhaps, first of all, architects with a feeling for fine and significant wall decoration. The result of their foresight and coóperation would doubtless be a healthy stimulus to the work of our contemporary painters. There is no lack of painters, but there is undoubtedly a lack of understanding, of coöperation between these men and successful architects of our period. If there are to be great murals painted to adorn the fine free spaces of our public buildings today, it is undeniably from the hands of the architects that opportunities for this work will be given,— not primarily from the hands of building committees. This in spite of the fact that there have probably been notable examples where it was the painter's initiative which created his own opportuni- ties,—witness Raphael of Italy of the sixteenth century and Diego Rivera of Mexico today. It is unfortunately true that in present-day America the excellent work be- ing done by a number of gifted men is not receiving proper recognition. А. reconstruction such as has been accomplished in this volume is truly stimulating. This work on the "vineyard of the pope," which received the best efforts of a Raphael and the San Gallos, will be peculiarly im- portant to those of the architectural profession who are interested in significant wall decoration. The impor- tance of the volume's subject matter well deserves the care with which the work has been produced. It is a volume which will delight the decorator, and its value to the architect should secure it a place in every library. KITCHEN MANAGEMENT Construction, Planning, Administration ]. O. DAHL Author of "Restaurant Management” ERE is a work of enormous value to restaurant owners and managers, architects, chefs, stew- ards, kitchen engineers and manufacturers, in fact to all in any way connected with institutional kitchens. The author is a well known authority in the hotel and restaurant field. This book is the result of his ex- perience, and of his interviews with literally thou- sands of experts, over 200 of whom directly coóper- ated in preparing the work. It discusses expertly all phases of kitchen design, construction, equipment, and administration. It points out methods of standardizing every branch,— and in the most efficient, economical manner. Filled with practical suggestions and concrete examples, this work will save owners and managers of large kitchens many thousands of dollars. It is indis- pensable in the equipment of restaurants, hotels, clubs, community houses, and in architects’ offices. Price $5 THE ARCHITECTURAL FORUM 521 Fifth Avenue New York “Specifications for a Hospital” A volume which sums up in terms of actual specifications the practice in connection with hospital building and equipment of a widely known and highly successful firm of New York architects. The work, which covers the specifications prepared by York & Sawyer for a large hospital in Pennsylvania, goes into every item which is included in the broadest definition of the word “specifications.” 488 pp., 814x11 ins. Price $6 THE ARCHITECTURAL FORUM 521 FIFTH AVENUE NEW YORK American Theaters of Today By R. W. SEXTON and B. F. BETTS With a Foreword by S. L. Rothafel (“Roxy”) AN extremely valuable and practical work on the modern theater, its design, plan, construction and equipment of every kind. The volume deals with the- aters, large, small, and of medium size; with houses designed for presentation of various forms of drama and with other houses intended for the presentation of motion pictures. Lavishly illustrated, the work shows the exteriors and interiors of many theaters in all parts of America, giving their plans and in many instances their sections to show their construction, while the text deals with every part of the theater,— its lobby, auditorium, stage or projection room, and with every detail of equipment,—heating, cooling, ven- tilating, lighting, stage accessories, its stage mechanism, etc. A work invaluable to the architect who would successfully design a theater of any size or description. 175 pages, 914 x 1210 ins. Price - - $12.50 Net THE ARCHITECTURAL FORUM 521 Fifth Avenue New York Any book reviewed may be obtained at published price from THE ARCHITECTURAL FORUM Part Two
Page 33
April, 1929 THE ARCHITECTURAL FORUM 141 | Screwless Plates align sutomatically "e 2 1. Screw Metal Under-plateto \ switch—when wiring is done. 3. Snap on Screwless Cover j Plate of Bakelite. ITH every Hubbell Screwless Plate of ‚ lite. No screws or other ‚ metal fastenings mar the perfectly insulated | Bakelite plate surface. And the Hubbell plate finishing service enables ep are Er you to provide switch The electrician simply screws Under- -plate and outlet plates which exactly match to switch or outlet when wiring is done. the color and material of the background Then the device is automatically brought to which they are affixed. flush with the plaster as it is fastened to the outlet box. Since most walls are uneven this self-aligning feature of Screwless Plates saves from 25 to 50% of installation time. Bakelite goes the self aligning Metal Under- | plate which saves costly ES > Ч 2. Fasten switch to outlet box— i b ui 1 d in 8 -u P w h en no *''building-up" necessary. | walls are uneven. Clip the coupon to your letter-head for our A. I. A. Bulletin which contains a complete description of Screwless Plates. Clients will approve the appearance as well HARVEY HUBBELL, Incorporated as the economy of Screwless Plates of Bake- BRIDGEPORT, CONNECTICUT, U. S. A. Шш HUBBELL Screwless Plates 3 Mail Coupon to our nearest office & Please send A. I. A. Bulletin No. 31C-7 Main Office: Boston, Mass. S Philadelphia, Pa. Name 176 Federal St. Bridgeport, Conn. Fifth St hia Atlanta, Georgia Chicago, Illinois iladelphia Bourse 138 Marietta St. 318 W. Washington St. (Exhibition Dept.) Address H.C. Biglin Denver, Colo. San Francisco, Cal. A. F.—4-29 New York City, N. Y. 1109 Broadway 390 Fourth St. 30 East 42nd St. The Sales Service Co. Garnett Young & Co. F City and State
Page 34
Part Two AS LONG AS THE BUILDING STANDS SHERARDUCT is comparable only with SHERARDUCT. Chemically, zinc-metallic and enamel treated inside and out- NATIONAL CTS side; threads of pipe, couplings and elbows alike ———— the permanent raceway. National Electric Products Corporation National Metal Molding Division Pittsburgh, Pa.
Page 35
CONTENTS THE ARCHITECTURAL FORUM PART ONE—ARCHITECTURAL DESIGN Cover Design: House of Nations. International Press Exhibition, Cologne From a Water Color by Edward A. Batt Jumel Mansion, New York Frontispiece From a Water Color by Frank A. Wallis PLATE ILLUSTRATIONS Architect Plate Church on Tempelhofer Field, Berlin 97-101 Stadtbaurat Brauning Grundtvig Church, Copenhagen 102-101 P. V. Jensen-Klint 105-112 Ivar Tengbom Hogalid's Church, Stockholm Infirmary, Choate School, Wallingford, Conn. 113-116 Cram & Ferguson Baker Memorial Library, Dartmouth College, Hanover, N. H. 117-128 Jens Fredrick Larson LETTERPRESS Author New Amsterdam and Its Hinterland Frank A. Wallis Some Modern European Churches Milton D. Lowenstein Old Trappe Church, Trappe, Pa. Marie Kimball Baker Memorial Library. Dartmouth College, Hanover, N. H. Jens Fredrick Larson 1928 Common Brick School Competition The Museum and the Architect Shepard Vogelgesang In the Interest of Architectural Design George Malcolm Beal PART TWO—ARCHITECTURAL ENGINEERING AND BUSINESS An Airport Terminal Frontispiece From a Drawing by Chester B. Price Airports,—The New Architectural Opportunity 593 Tyler Stewart Rogers Choice of Structural Material and Types of Construction 603 Theodore Crane Architectural Superintendence of Winter Con- struction 611 Leicester K. Davis Building Promotion from the Buildzr's Standpo:nt William A. Starrett The Painting Problem and Its Solution W. C. Woodyard Soundproofing Apartment Houses; Part One У. L. Chrisler The Building Situation Supervision of Construction Operations PARKER MORSE HOOPER, A.LA., Editor KENNETH K. STOWELL, А.І.А., Associate Editor Contributing Editors: Harvey Wiley Corbett; Aymar Embury II; Charles G. Loring; Rexford Newcomb; C. Stanley Taylor; Alexander B. Trowbridge Published Monthly by NATIONAL BUILDING PUBLICATIONS DIVISION OF NATIONAL TRADE JOURNALS, INC. 521 Fifth Avenue, New York APRIL 1929 Page 473 483 521 628 629 H. J. Redfield, President and Treasurer; Howard Myers, Vice President and General Manager; Joseph E. Browne, Vice President; John Thomas Wilson, Vice President; C. Stanley Taylor, Vice President; James A. Rice. Vice President; Henry J, Brown, Jr., Secretary.
Page 36
ARCHITECTURAL ENGINEERING AND BUSINESS Part Two Von Жиргїп Self -Releasing Fire Exit Latches Sweet's, Pages B2605-B 2609 AIA 27c5 Sturdiness and reliabil- ity are not particularly interesting virtues -- but they are indispensable in time of emergency. ov VONNEGUT HARDWARE CO. Indianapolis, Ind.
Page 37
Page 38
"n LI Re, tann ИП AN AIRPORT TERMINAL. From a Drawing by Chester B. Price. THE MIAMI PASSENGER TERMINAL OF THE PAN-AMERICAN AIRWAYS, INC. DELANO & ALDRICH, ARCHITECTS The Architectural Forum
Page 39
T ARCHIT VOLUME L B H E CTURAL FORUM NUMBER FOUR APRIL 1929 AIRPORTS, —THE NEW ARCHITECTURAL OPPORTUNITY BY TYLER STEWART ROGERS S? rapid has been the development of civic and commercial aéronautics that it has already reached the point where its further growth is largely dependent upon the provision of adequate ground facilities in the form of landing fields, airports, and the many types of accommodations that must be provided for the care of airplanes, pilots, passengers, and cargo. It is only within the last year or so that American cities have awakened to the fact that they must provide air- ports immediately if they are to benefit by the stimulation which aviation can give to commerce, industry and transportation. In a bulletin issued in the fall of 1928,—less than six months ago,—the United States Depart- ment of Commerce listed fewer than 400 airports either completed or actually under development, exclusive of those used for military and naval forces, During an address presented before air- port interests at the aviation show in New York in February, Colonel Harry H. Blee, Chief of the Airways and Airports Section of the Depart- ment of Commerce, said that there were approxi- mately 1,000 airports then actually in use or under construction, and that about 1,000 others were being studied by chambers of commerce, municipalities and other interests with a view to selecting sites, arranging finances and otherwise preparing for active work. Не qualified the state- ment by saying that even these figures were not reliable because they were changing daily. Esti- mates of the amount of money being expended in this new field are likewise vague for this same reason. Figures covering the last year and a half showed the enormous amount of $300,- 000,000 already spent or pledged for airport de- velopment, and a forecast was made that at least $500,000,000 would be spent in the next year and a half for such work. If these figures are out of date today, they are merely conservative, and un- doubtedly a few years hence will be insignificant compared to the amount of money being ex- pended annually for ground facilities to serve air transportation systems and the use of private aéroplanes for recreation and commuting. Here is a vast new field of activity that involves very important problems in architecture, engi- neering and city planning. What have architects done to take their logical place in this new work? A recent bulletin published by the Department of Commerce lists 28 organizations or individuals rated as airport designers and constructors. Of these 28 not over four or five are architects or engineers serving in a purely professional capacity on design problems. The others are former avia- tors who have entered this new field or construc- tion organizations that have seized the oppor- tunity to capture desirable contracts of this char- acter, and in a few instances companies that have been formed to advise professionally on airport designs, calling themselves “airport engineers." No implication is intended in this statement that the 23 or 24 organizations, exclusive of estab- lished architects and engineers, are not qualified for the work they are engaged upon; it is merely significant that so few well trained and well estab- lished architects and engineers or city planners have yet achieved recognition in this field. Architects, engineers and city planners can and must solve America's airport problems. They are already trained for this work. They alone have the background needed to handle such oper- ations in a constructive and farsighted manner, and they lack only an appreciation of some basic aéronautical requirements. Even these require- ments are rapidly becoming public property through the dissemination of information by the Airways and Airports Section of the Department of Commerce, the National Aéronautical Asso- ciation, the National Advisory Committee for
Page 40
594 ARCHITECTURAL ENGINEERING AND BUSINESS Part Two Entrance to Passenger Station, Tempelhof Field, Berlin Aéronautics, and other organizations of like character. There is a close parallel between the present- day development of airports and the early expan- sion of railway transportation systems and ter- minals in this country. The passenger stations and terminals that were built a half-century ago were badly designed structures, not adapted to serve the enormous expansion in railroad traffic that subsequently followed. They were designed poorly (from the present-day point of view) largely because there was little precedent for planning such structures and because few people could visualize the requirements that were subse- quently imposed upon them. Within recent years hundreds of millions of dollars have been spent to revamp, reconstruct and often re-locate not only important terminals but literally thousands of minor railway stations to adapt them to modern needs. 'The modern airport, like the railway station, will become a gateway to the city which it serves. It must possess dignity and quality in keeping with its important civic character. There is al- ready a very noticeable tendency for some airport developers to create structures of more or less temporary character which will rapidly become obsolete and inadequate to meet the requirements of air traffic. In fact many of America's existing airports are comparable to a railroad terminal consisting of a round house, track yards and a freight shed which also houses the ticket office and waiting room. Out of the hundreds of mil- lions of dollars to be expended for airport de- velopment in the immediate future, a very sub- stantial proportion will be wasted through obso- lescence if the problem is not immediately at- tacked in a broad way and if an effort is not made to visualize future requirements and to provide for them in the initial layout and construction of airport facilities. "This has already occurred at Croydon, England, where structures which cost some $600,000 have been scrapped and replaced Modernistic Restaurant in Tempelhof Field Airport, Berlin by modern buildings costing over a million dol- lars. Even the famous Tempelhof airport at Berlin, undoubtedly the finest airport in the world today, has been undergoing constant evolution for the past several years to meet the rapidly ex- panding air traffic of which it is the center. Com- paratively few American airports have yet been carefully planned to provide for expansion at the rate already experienced by the leading European airports. Most of them have started with merely landing fields, and their structures have grown haphazardly. There is not even general con- sensus of opinion as to the proper method of developing American airports, and in some cases municipalities have leased parts of the landing areas they control to air transportation systems which have erected their own structures with- out any regard to the others or to the general utility of the field. Such conditions are regrettable but perhaps in- evitable at this stage. It is a fact that the de- velopment of commercial aéronautics has been so rapid that the ground problems which have been created have multiplied far more rapidly than they have been solved. It is essential that airport design be considered with the intelligence and foresight that has been applied to aérodynamics and the design of flying machines. Architects, engineers and city planners, trained to solve plan- ning problems of this magnitude, must turn their attention to airports, not only for the sake of commercial and civic aéronautics but because here is a new field of business which they should logically develop. Undoubtedly the very recent announcement of the Lehigh Airports Competition among archi- tects and engineers for the design of a modern airport is the most significant move that has been made to bring architects, engineers, and city planners into public notice as the logical persons to guide the future development of America's airports. This competition is sponsored by the '" Lehigh Portland Cement Company of Allentown,
Page 41
April, 1929 THE ARCHITECTURAL FORUM 595 The Waiting Room in the Croydon Airport, Show- ing Time Indicators and Weather Map Pa., which has posted $10,000 in prize money to be awarded those supplying the 14 best designs which are submitted. The competition has been planned with the utmost care and under the guidance of some 25 recognized authorities in the four fields of architecture, engineering, city plan- ning, and aéronautics. The preliminary work which had to be accomplished in order to formu- late a sound competition program is in itself of considerable interest to architects, because it was necessary to touch upon every phase of airport layout and facilities and to attempt to visualize the hitherto undeveloped possibilities for the ar- rangement of airport units, in order to give the competitors free rein to work out new and in- genious solutions of the problem without being hampered by the often unsatisfactory precedents which the world's existing airports now consti- tute. Some of these matters will be touched upon later. The competition is exceedingly timely and should prove of the utmost value to the archi- tectural and engineering professions and to city planners, as well as to the entire aéronautics industry. A number of people prominent in public life, including William P. Mac Cracken, Jr., Assistant Secretary of Commerce for Aéronautics ; F. Tru- bee Davison, Assistant Secretary of War; Sena- tor Hiram Bingham; former Postmaster General, Harry S. New; Dr. Samuel S. Stratton, President of the Massachusetts Institute of Technology; and others, have indicated their interest in this competition because of its potential value in stimulating sound airport development. In com- menting on the work of the committee, Mr. Mac Cracken said: * *Build the bird house and the birds will come’ is an old saying, but it is more true of human beings than it is of our feathered friends. “The character and attractiveness of America's airports have a direct relation to the people's in- Entrance to Airport Administrative Buildings, Croy- don, England. Control Tower on Left terest in the growth of air traffic, public and private. The degree to which any community can participate therein is directly in proportion to the provision which that community makes for getting airplanes in and out of the air. In other words, it means bigger and better airports and more of them. Any municipality which over- looks today's great opportunity for providing for air traffic of not only the future but of the pres- ent, will be found in the same position as those which refused to accept the railroad in pioneer days. “The airport architecture which is being de- veloped by the Lehigh Airports Competition will be of particular help to American municipalities in solving their airport problems. It should, therefore, command the good will of all forward- looking people." 'The company in sponsoring this competition has entirely removed any possibility of there be- ing a commercial aspect by giving the program committee and the competition management carte blanche authority to establish the requirements of the competition in whatever manner will be of the greatest value to the competitors and to munici- palities, air transport companies, flying clubs, chambers of commerce, and others interested in the creation of future airports. It is a far- sighted gesture for the benefit of many interests, from which the sponsors expect no return other than added good will and prestige. Roland D. Doane, representing the company, has merely asked that the competition drawings indicate the structures as though built of Portland cement products where feasible, admitting reinforced concrete construction, concrete blocks, or stucco over other sound and permanent structural ma- terials. When this competition was first proposed it immediately became apparent that the program could be prepared only after a great deal of study of the character and the facilities demanded in
Page 42
596 ARCHITECTURAL ENGINEERING AND BUSINESS Part Two General View of Croydon Airport, Showing New Administrative Buildings, Control Tower and Several Hangars a complete, well appointed airport. It was then decided to obtain the advice and counsel of lead- ing architects, engineers, city planners, and aéro- nautics experts through the medium of a program committee to which would be entrusted the prep- aration of the competition program and subse- quent oversight of the entire contest. Harvey Wiley Corbett, is general chairman of the pro- gram committee, and Francis Keally is the pro- fessional adviser. The architectural section of the committee includes Mr. Corbett as chairman, Raymond M. Hood, Professor William A. Bor- ing, Dean of the School of Architecture, Colum- bia University; Parker Morse Hooper, Editor of Tue ARCHITECTURAL Forum, and Mr. Keally. Engineering matters bearing upon airport design were considered by an engineering section headed by Morris Knowles, of Pittsburgh. Other mem- bers of this section are Francis Lee Stuart, one of America’s outstanding engineers specializing in port, terminal, and transportation work ; Har- old M. Lewis, Executive Engineer of the Regional Plan of New York and its environs ; Gavin Had- den, and Colonel Willard Chevalier, Publishing Director of Engineering News-Record. Airport planning is so definitely a part of city and regional planning in the relationship of air- ports to other transportation methods and to the communities they serve, that it was quite essen- tial to have guidance on these problems. At the same time it was recognized that municipal, state, and county authorities are keenly interested in airport design and location. In consequence, a third section of the program committee was or- ganized, headed by George B. Ford, city planner, as chairman. The membership of this group in- cludes E. P. Goodrich, city planning consultant to the Chinese government, who is now in China planning airports as a means of expanding aérial transportation systems in that country in lieu of the slower and more expensive extension of the national railway system; Fred C. McLaughlin, Mayor of White Plains, N. Y., and President of the New York State Conference of Mayors and of the Westchester County Federation of Plan- ning Boards; Samuel P. Wetherill, Jr., President of the Regional Planning Federation of the Phila- delphia Tri-State District; and Harold Butten- heim, Editor of American City. Necessarily, the most vital matter in the formu- lation of a competition program as well as in the actual designing of any airport is the need for solving practical aéronautical problems. The aéronautics section, headed by Dr. George W. Lewis, Director of the National Advisory Com- mittee for Aéronautics, as chairman, was thus organized to secure the counsel of men repre- senting every leading aéronautical organization as well as the practical management of commer- cial and municipal air terminals. The member- ship of this committee includes Porter Adams, Chairman of the Executive Committee, National Aéronautic Association ; Major John Berry, Man- ager of Cleveland Municipal Airport; Colonel Harry H. Blee, Chief, Airways and Airports Sec- tion, Department of Commerce; L. К. Bell, Secretary of Aéronautical Chamber of Com- merce; Colonel Paul Henderson, Vice-president, Transcontinental Air Transport, Inc.; Charles S. (Casey) Jones, President Curtiss Flying Service; Ernest Jones, Aéronautics Expert, Department of Commerce ; and Harry Schwarzschild, Editor of Airports. The problems considered by these four sections of the competition program committee are the problems which face any architect, engi- neer, or city planner undertaking the design of a well equipped air terminal, and a brief discussion of the more vital matters may prove of interest. Site Requirements for Airports There is a universal feeling that airplanes will be so developed in the future that they can land
Page 43
April, 1929 THE ARCHITECTURAL FORUM 597 Hangars at the Ford Airport, Dearborn, Mich. and take off in less space than is now required. Undoubtedly, this is true, and the progress al- ready made, including the development of the autogyro abroad, will probably make it possible in the future to utilize less landing area than is now necessary. On the other hand, it must be remembered that there will be an equivalent ex- pansion in the use of planes, not only for com- mercial transportation, but by private owners for recreation and commuting, and as this growth takes place, more planes will arrive and take off simultaneously, requiring correspondingly larger areas for maneuvering. Furthermore, it has al- ready been demonstrated that the establishment of an airport stimulates realty values in the lo- cality and leads to development of vacant land nearby with industrial plants associated with the aéronautical industry, with homes, and with all of the structures which naturally congregate around any center of transportation, such as hotels, stores, and amusement places. Thus, when the boundary of an airport site is once estab- lished, it is exceedingly difficult to expand the site by acquisition of adjacent vacant land, be- cause in a few years increased values make such land out of reach for airport use, or what vacant land there was when the airport was established becomes developed with more or less costly struc- tures which cannot be removed. Consequently, it is important to take as much land as possible when an airport is first established and to main- tain control of the entire area in order to provide for future needs as well as to give an adequate, effective landing area for present-day airplanes. It is not necessary to discuss in detail the per- missible minimum sizes for flying fields. The United States Department of Commerce, through its Airways and Airports Section, publishes bul- letins which are available to architects, engineers, and others interested, in which these dimensional requirements are discussed and a rating system is established. Colonel Harry H. Blee, chief of this section of the department and a member of the Lehigh Airports Competition Program Com- mittee, in considering this matter felt it advisable to recommend an effective landing area of 3,500 feet in all directions, but at the same time he said that this is in excess of the space required for the highest airport rating. In other words, while 2,500 feet in each direction or even shorter run- ways, will suffice for minor airports and emer- gency landing fields, it is good judgment to take the largest area available up to approximately a square mile. 'The gross area consists of three major space units, the first of which is the landing and take- off area which is wholly free from obstructions of any kind, and it is this part of the field which should be as large as circumstances will permit. Modern airplanes have a safe gliding angle of 7 to 1 and can gain altitude in approximately the same ratio. Hence, the effective landing area must be protected by the second space unit, which may be termed a marginal strip. The marginal strips must have a width which is seven times the height of any building or other elevated obstacle bordering on the landing field. It is perfectly feasible to utilize these marginal strips in various ways, providing the structures erected upon them do not project above a line having a 7 to 1 starting at the edge of the effective landing area. Such space may be used for parking automobiles and for mooring planes which do not require hangar protection, as well as for playgrounds, outdoor restaurants, parks, and various other types of concessions and amusements. In fact, the mar- ginal area may be developed to produce an important revenue to the airport, for all of the European airports experience a steady flow of visitors who come to watch the flying activities. Over weekends from 10,000 to 12,000 persons regularly visit the Tempelhof field in Berlin to patronize the beer garden, the promenades, and the amusements while they watch transport
Page 44
598 ARCHITECTURAL ENGINEERING AND BUSINESS Part T'wo Perspective by Maurice Chauchon, French Architect, for a New International Airdrome at Pau, France planes arrive and depart. The third section of the site is that part reserved for the important airport structures which will be mentioned later and which must be separated from the effective landing area by the same type of marginal strip which protects the other borders of the feld. This vacant space, however, between the airport buildings and the landing field, is usually re- served for the maneuvering of planes, and is not available for public use. The ideal airport must permit airplanes to land and take off into the wind at all times. Theo- retically, the field should provide runways or lanes in all directions, even though the prevailing wind in any given locality may be predominantly from one quarter. Experienced flyers find no difficulty in landing into a quartering wind, but it is exceedingly difficult to land a plane cross- wise with the wind. It is practicable, therefore, to have runways or landing strips in eight direc- tions, equivalent to the four cardinal and four quarter points of the compass. The problem of developing the field surface for landing and take off is one of the most difficult and expensive matters that is encountered in cre- ating an all-purpose airport. Perfect drainage is essential at all times, and particularly for spring conditions, when the ground is thawing. When funds permit, it is of course vastly better to have the entire landing area surfaced or paved uni- formly, but today the expense of such prepa- ration is quite prohibitive. For some years to come, therefore, it will be necessary to provide landing strips or runways especially prepared for the landing and take off of planes, but these must be absolutely flush with the adjacent unpaved areas and as level as possible. The arrangement of these runways should be such as to allow the maximum number of planes to depart and arrive simultaneously without danger of interference or collision. It is also important that the runways as well as the entire field be surfaced with a material which will make artificial lighting for night flying effective at minimum cost. Airport Structures The modern airport must be conceived as a transportation terminal and must be equipped to handle passengers, mail, express, and even freight. It must also provide for private planes which do not operate on schedule, and for sight- seeing planes which use the port as a base of oper- ations. The required structures to serve these functions may be divided into three basic groups, exclusive of the accessory buildings which are de- sirable but not essential to the airport proper. These three groups include the terminal facilities, caring for passengers and cargo; hangars for the care of planes; and service units for housing maintenance equipment, supplies, and possibly also the personnel of the field. At Miami there is probably the most completely
Page 45
April, 1929 THE ARCHITECTURAL FORUM 599 Airplane View of the Ford Airport, Dearborn, Mich., Showing Buildings and Field appointed terminal building yet erected in the United States. It was designed by Delano & Aldrich, architects. It contains a passenger con- course or waiting room with the usual ticket offices, check room, public toilet facilities, news- stands, and other concessions associated with the ordinary railroad passenger station. The main floor is so arranged as to control passengers ar- riving by plane from Cuba, for inspection by immigration, customs, and health authorities. This feature suggests that every airport in the United States may ultimately become a possible port of entry, for flights have already been made from Mexico to northern points in the United States, and from Canada to southern and western points. This building also provides offices for the air transport officials, and on the second floor, overlooking the flying field, there 15 a large dining room adjacent to an open air terrace which is a wonderful vantage point from which to observe the arrival and departure and the maneuvering of airplanes. This building, more completely than any other, suggests the character of the ideal terminal struc- ture for an airport. An important feature of such a building, unless provided for in a separate unit, is a control room, commanding an unob- structed view over the entire airport from which an operations executive can exercise complete control over all activities on the field. This con- trol room is usually elevated above surrounding buildings, generally in the form of a low tower above the roof line of the highest structure, and it adjoins a radio and communications room equipped to maintain contact with other airports in all directions and by radio with planes in the air. These units constitute the nerve center of the airport and are vital to its operation because it is necessary to prevent planes from landing, especially at night or in fog, when others are about to depart, and to notify planes en route of other machines flying in their general directions to minimize the possibility of collision in mid-air and to aid them in keeping to their courses. Un- doubtedly also the modern air terminal must pro- vide post office facilities and a sub-station, al- though at present the Post Office Department does not consider these elements essential because the present custom is to remove air mail by motor trucks direct from the planes to existing post offices. Another requirement of the well designed ter- minal building is provision for the safety and protection of passengers using private or trans- port aéroplanes. There should be some type of covered runway leading from the waiting room to the loading point for planes which is so devised as to prevent the passengers from getting in the way of whirling propeller blades. At a separate point there should be similar provision for pro- tecting arriving passengers from inclement weather and for keeping them under control until
Page 46
ARCHITECTURAL ENGINEERING AND BUSINESS Part Two Malmo, Sweden's Spacious Airport, Showing Interesting Housing Development Near the Field they have passed the immigration and customs authorities if the plane happens to have come from a foreign port. Separation of these two loading and unloading points is desirable. It is also essential to have the entire flying field pro- tected by a suitable wall or fence which will keep unauthorized persons and often stray animals from the field and permit the control of even those using private planes in their entrance and egress from the flying area. 'The second group of structures,—the hangars, —needs little discussion, because the functions of hangars are well understood. They require un- obstructed floor space, good lighting, and should be fireproof, weatherproof and easily heated. In some European airports hangars are made two stories in height, using a ramp to reach the upper floor, and it is possible that the reverse will be true of some future airports having part of the storage space below ground. The most difficult problem in hangar design is to provide the vast doorways necessary for the admission of large planes. After much study the Lehigh Airports Competition Program Committee suggested some openings 125 feet wide by 20 feet in clear height, ard othe~“s for smaller planes 90 feet and 100 feet UL се 2 mou ее Building at the Dennison Airport, Atlantic, Mass. in width and 18 feet and 19 feet respectively in clear height. These requirements may change as transport planes become larger, but for the present they will house the typical units now contemplated or in use. The third group of buildings includes fire and ambulance stations with quarters for emergency crews and garages and storage buildings for trucks, tractors, snowplows, rollers, grass cutters and other equipment needed for the care and maintenance of the fields. А gasolene and oil filling station is an important requirement to this group. Frequently the tanks are buried under- ground and supply lines are run to pumps near the hangars or to underground receptacles located in concrete aprons on the fields themselves. These sub-surface filling points are covered by manholes which can be lifted and the fill pipes withdrawn so that when the covers are replaced planes can run over the surfaces without difficulty. There must also be provision for housing the field personnel, but this may be provided for outside of the airports proper or in parts of hotels which are mentioned under the heading of "accessory structures." The arrangement and grouping of these various units constitute a problem that has not yet been solved with a certainty that the ultimate plan has been discovered. In some airports the hangars are separate units, and in others they are grouped together as elements of a large structure. In some places they are adjacent to the passenger terminals, and elsewhere they may be separate from these units for considerable distances. It is essential to provide a well paved and practically dustproof apron connecting the hangars and the loading
Page 47
April, 1929 THE ARCHITECTURAL FORUM 601 Construction in Progress, New Croydon Airport with System of Concrete Aprons and Maneuvering Space point at the passenger terminal for maneuvering planes either under their own power or by means of tractors and for warming up motors where the wind stream from the propellers will not throw up a cloud of dust. If the flying field is of ade- quate size and the buildings can be separated from the field by a sufficient marginal strip as already noted, their precise relationship to the flying area seems to be of secondary importance, and their location is largely governed by the high- ways and other means of communication between the port and the city which it serves. If the field is of limited area and the runways are of minimum length, it should be considered essential that no buildings be located opposite the end of any runway, and particularly that they should not be in the direction of the prevailing winds. Accessory Structures Under this head fall a number of possible units which have already found their place in well established European airports but which may not be absolutely essential to port operation. First of these is a hotel. At Croydon, England, a 200- room hotel has been erected near the airport buildings and has proved successful. It has been found that many visitors to the field use its ex- tensive restaurant facilities, which overlook the flying area, and that passengers frequently use it as headquarters from which they make visits to the surrounding country during interruptions to their air travel. Such a building may also provide accommodations for pilots and the ground per- sonnel of the field as well as provide apartments for the important officials and executives of the field and the air lines which converge there. Under this heading also fall all types of con- cessions and amusements as well as parking spaces for visitors' automobiles, outdoor restau- rants, motor bus and rapid transit stations, stores and shops. Undoubtedly commercial activities of these various sorts will contribute to the support and maintenance of airports, and their control by the airport owners is economically desirable. Other Requirements in Airport Design Night lighting is one of the first essentials for the well equipped airport. The subject needs little discussion here, however, because the problem does not influence the architectural development of an airport to any great extent, and because the subject is quite fully covered in publications issued by the Department of Commerce and other authorities. Adequate lighting involves border lights to indicate the margins of the field; air beacons ; an illuminated wind direction indicator ; danger lights on all surrounding obstructions ; and flood lights to illuminate the field for landing and take off. Every airport must be identified by huge signs visible from the air and preferably illuminated at night. These may be on the roofs of units or other buildings on the field itself or xm bip o eet oa Buildings of the Oberweisenfield Airport, Berlin
Page 48
602 | ларе ш d 5. cR 2 deut ябы. Control Tower, Croydon Airport, with Signal Cabin and Wireless Equipment even on adjacent buildings in the vicinity, with arrows pointing to the airport itself. Неге again the Department of Commerce has established recommendations and requirements which are easily followed. The wind direction indicator re- ferred to, sometimes called the ‘‘wind-tee,” is something like a mammoth weather vane with its flat surface horizontal so as to be visible from the air and to constantly point the direction of the prevailing wind. One of the major problems in airport design ARCHITECTURAL ENGINEERING AND BUSINESS Part Two Airport Beacon of 30 Million Candlepower, at Oakland, Cal. involves locating the field with relation to adjacent highways and transportation facilities. The amount of traffic ultimately to be expected at air- ports suggests the desirability of having a broad plaza, such as may be found adjacent to the better planned railway terminals, which will care for the traffic converging at the passenger terminal and give this structure a proper and dignified setting. Epitor’s Nore. We are indebted to Mr. Harry Schwarzs- child, Editor of Airports, for giving us permission to publish here many photographs from his personal files. 1 Airport Passenger Terminal of the Pan-American Airways, at Miami Delano & Aldrich, Architects
Page 49
CHOOSING THE STRUCTURAL SYSTEM AND MATERIAL BY THEODORE CRANE ASSOCIATE PROFESSOR OF BUILDING CONSTRUCTION, YALE UNIVERSITY PART I—BUILDING FRAMES Г looking over the vast quantity of printed matter dealing with the subject of building materials, one can hardly fail to be impressed by the amount of study and research which has been expended in this field. If an architect is consid- ering the use of a particular type of construc- tion, there are usually technologic papers, text- book references or society reports bearing upon its value. Very little attention, however, has been given to that aspect of the subject which might be called “comparative construction,’ that is, the relative value of materials and systems. To make the matter clear, let us consider a very simple illustration,—the choice of a floor system. Every textbook on reinforced concrete describes the so-called “beam and slab” and “girderless” designs. An architect’s office is flooded with man- ufacturers’ literature illustrating any number of proprietary methods of construction. The archi- tect’s problem, however, is not the detailed study of a particular system, but the selection of the most suitable type for the conditions existing. With this in mind, these articles have been written to point out the individual characteristics of va- rious materials and systems, as affecting their use, and to suggest methods of arriving at a satisfac- tory choice in structural work. The first question of this nature, and a question which can usually be very easily answered, is re- garding choice between bearing walls and skele- ton construction. In most cases the problem is purely economic, and the thickness of bearing walls, where such are employed, is governed by the requirements for stability rather than by the strength of the mate- rials in compression. Under the New York build- ing code, which represents in this particular those of our larger cities, brick masonry laid in Port- land cement mortar is allowed to take a working load of 250 pounds per square inch, Portland cement concrete 500 pounds, and sandstone masonry 400 pounds. These stresses are seldom critical in bearing walls. The limit of economy is determined rather by the wall thicknesses re- quired for various heights and unsupported areas. For instance, a building of the residence class, under 75 feet in height, would require, by this same code, 12-inch walls for the “uppermost 55 feet, and 16-inch below that.” For public or busi- ness buildings between 60 and 75 feet in height the bearing walls would have to be 16 inches thick for the “uppermost 50 feet, and 20 inches below that.” In both cases additional thicknesses are re- quired for walls built of rubble masonry. Fur- thermore, when the clear span between bearing walls is over 26 feet, or the length of the wall without lateral support is over 105 feet, or more than 30 per cent (45 per cent when wall area is laid in Portland cement mortar) of the horizon- tal wall area is occupied by openings, the thick- ness must be increased. Wall thickness for wall- bearing buildings over 75 feet in height increases very rapidly. For example, in the class of public and business buildings a structure 80 feet high would require, under the New York code, 16-inch walls for the uppermost 25 feet, 20-inch walls for the next lower 35 feet, and 24-inch walls below. Compared to these requirements, a 12-inch panel wall, supported at each floor level by a structural steel or reinforced concrete spandrel, is usually more economical, all things considered, for fire-resistant construction over three or four stories in height, and for garages or industrial buildings of even lesser height. The use of struc- tural steel frames for one-story buildings is often desirable to meet the requirements of certain in- dustries, and although still in an experimental stage, the application of steel sections to the con- struction of dwellings has interesting possibilities for classes of work where economy is a chief consideration. These uses of steel are, however, the exception, and its particular function is in the frames of comparatively tall buildings. For this type of work the practice of a few years ago of employing columns built up of plates and angles has largely given place to the use of solid rolled sections, normally two stories in height and designed to carry the load of the lower story. A comparatively recent development is the use of column sections, five to six stories in height, for the support of reinforced concrete floors. Finding that two-story lengths were im- practicable and desiring to use a heavy H-section through the lower stories in order to save floor space, these long columns fitted with angles at each floor level have been successfully used for buildings of 10 to 20 stories, to support stone- concrete floors of girderless design. This type of column construction, as built in New York, usual- ly calls for a reinforced concrete section through the upper stories of the building, which is carried down until the size becomes objectionable. For 603
Page 50
H са м n | | lJ | Photo. Tebbs & Knell, Inc. Uppercu-Cadillac Building, New York. Reinforced Concrete Frame with Interior Steel-cored Columns example, let us consider that the upper eight floors and roof of a 14-story building are supported by reinforced concrete columns. Under the New York code these would probably be of hooped sec- tion in the two upper stories and of spiraled de- sign below. Even the latter, however, would re- quire a gross diameter of about 2 feet, 6 inches, when carrying large bays subjected to light manu- facturing loads. If this were considered to be a limiting size, the fifth story columns would then be designed with rolled steel cores of H-form, the sections being based on the loads which the fifth story columns are required to support and plates added to take the increments due to the floors below. The gross column size, 2 feet, 6 inches, would then be the same in all of the re- maining lower stories. Such a combination of structural steel and re- inforced concrete makes it possible to utilize the advantages of each material, now that the me- chanical difficulty of field erection has been solved by obtaining long sections from 60 to 75 feet in length. With this one important exception, how- ever, the structural steel frame, or the reinforced concrete frame offers two distinct alternatives in the field of skeleton construction. For buildings of certain classes the choice is obvious; factories and warehouses with heavy floor loads ranging from 125 to 300 pounds per square foot and of comparatively low height can generally be built more cheaply of reinforced concrete than of struc- tural steel. Office buildings, hotels and apart- ments, 15 stories or more in height, can usually be ARCHITECTURAL ENGINEERING AND BUSINESS | Part Two The Floor Construction is of the Girderless Type Charles E. Birge, Architect Framing of the Uppercu-Cadillac Building. built more cheaply with steel frames. But we must not place too much confidence in such broad generalizations. The tallest concrete building in the United States is the recently completed Mas- ter Printers’ Building in New York, which has 20 stories. In this case the use of concrete showed a very substantial saving over steel. Let us in- vestigate the conditions. A live load of 250 pounds per square foot was required on all floors ; the plan of the building was adaptable to a gir- derless floor system, which is extremely economi- cal for heavy industrial loads. As the conditions of occupancy demanded that headroom be com- puted to the bottoms of girders in a beam and slab design, their elimination permitted several addi- tional stories in the same total height of building. Furthermore, the lighting was better with girder- less construction, and the cost of sprinkler instal- lation was about 25 per cent less. The same solution has been worked out eco- nomically in the case of several other structures erected in New York during the last year. For example, there are the Appraisers’ Stores Build- ing, 11 stories high, with 250-pound live load; a service station for the Packard Motor Company, eight stories high, with 150-pound live load; and the building at 653-659 Eleventh Avenue, 14 stories high, with 200-pound live load. These were all concrete-framed buildings employing structural steel cores in the lower stories of the in- terior columns and with girderless floor systems of spans varying from 20 feet x 20 feet to 31 feet, 6 inches x 33 feet. If we are to assume, as would seem reasonable, that these operations rep- resent an actual trend in design, it is probably safe to say that reinforced concrete frames, par- ticularly where a girderless floor system can be used, are well adapted to comparatively heavy loads for buildings even up to 20 stories in height.
Page 51
April, 1929 Framework U. Long Column-cores with Girderless Floor System S. Appraisers Stores, Combined Structural steel is particularly suited to light loads and tall buildings. Although we have ap- proximately 650 reinforced concrete structures in this country that are ten or more stories in height, the vast bulk of such work is of steel. Under the New York code a structural steel frame with cin- der-concrete “arches” is a very economical type of construction for normal designs based on office loading of 60 pounds per square foot throughout typical floors. For buildings of over 20 stories in height, steel has practically no competitor in any part of the country. Below that height, offices, hotels and apartment houses in New York are built almost exclusively of steel with cinder-con- crete floor arches. In many western cities, on the other hand, even where material prices are no more favorable to use of concrete, the latter has been widely and successfully used for work of this class. Trade conditions and the tendency to follow the established custom of one's own lo- cality, would often appear to play a larger part than the matter of comparative costs. Second only to the matter of live load, the architectural plan of a building plays an impor- tant part in the choice of construction. One of the great structural advantages of reinforced con- crete, as ordinarily used, is its monolithic charac- ter, permitting assumptions of continuity in de- sign. When the architectural arrangement lends itself to a series of continuous bays of approxi- mately the same size, the use of a reinforced con- crete frame may be an economical solution for even light loads and, as previously mentioned ex- amples indicate, will almost always be suitable for heavy loads. The matter of continuity will not, ordinarily, make any difference in the depth of beams or girders, in beam-and-slab construc- tion, but it will save anywhere up to 35 per cent of the reinforcement that they require. Reinforced THE ARCHITECTURAL FORUM 605 Photo. Tebbs & Knell, Inc. U. S. Appraisers’ Stores Building, New York Buchman & Kahn, Architects concrete is particularly suitable for buildings that permit a column spacing that results in square or nearly square bays. As a large proportion of the cost of concrete work is expended on the con- struction of forms, this material is most econom- ically used for buildings whose structural mem- bers can be standardized. The importance of this principle can be judged by the fact that on typi- cal work one set of forms serves in turn for the structural members of each floor, often being used as many as ten times. Neither is it usually de- sirable to reduce the sizes of beams supporting a roof construction, as the surplus concrete is more than offset by the saving in not changing the forms. The ideal spans, in both reinforced concrete and structural steel, vary between 18 and 24 feet, depending upon the live load and the type of floor construction employed. In most buildings outside of the industrial and commercial classes, the col- umns have to follow the room arrangement, and it is seldom possible to use the most economical spacing. As far as practicable, the designer should start with the primary element of a floor system, such as the slab, and lay out his typical floors to use each member to best advantage. We have an excellent example of this principle applied in most New York buildings now under construction. The city code permits cinder-concrete slab or “arches,” as they are called, to be used on spans up to 8 feet. A minimum thickness of 4 inches is speci- fied for floors. The designer's problem is then to locate the floor beams, which support the slabs, as closely as possible to the 8-foot limit. Asit works out very well to frame the beams into the girders
Page 52
606 Master Printers Building, One of the Highest Concrete-framed Buildings. Floors of Girderless Design Frank Parker, Architect and Engineer at the third points of the girder spans, we have a column spacing which approaches 24 feet if we wish to fully develop the strength of our 4-inch slab which the building code requires. This same principle can be applied to other matters in the design of structural frames. А 3%-їпсһ thickness of stone-concrete, which is the minimum allowed for roof construction under the present New York code, when fully continuous will carry a 43-pound superimposed load between beams placed on 10-foot centers. The limit of the 4-inch stone-concrete slab, when supporting a 100-pound live load, is 8 feet, 6 inches when fully continuous and 7 feet, 9 inches for end spans. The weight of reinforcement per square foot of floor area naturally increases as the column spac- ing is increased. For example, a girderless floor system designed under the two-way requirements of the New York code, to support a superimposed load of 125 pounds per square foot, would require 1.85 pounds of steel per square foot of floor area with bays 16 feet square; 2.35 pounds for bays 20 feet square, and 3.10 pounds for bays 24 feet square. These figures are based on full continu- ARCHITECTURAL ENGINEERING AND BUSINESS Part Two The Fuller Building, New York, Typi- cal of Work Economical in Steel Walker & Gillette, Architects ity. Considering the cost of footings and columns, the most economical bay would probably be about 18 feet square. Considering the loss of floor space occupied by the columns, the present prac- tice is to space them about 20 feet on centers,— probably a little over rather than less. For long spans of 40 feet or more, reinforced concrete can be used in either arch or truss con- struction. Such designs have been cleverly exe- cuted both in this country and abroad, but if econ- omy is the governing factor, steel should be used in most problems of this nature encountered in building construction. There is even a tendency to use concrete girders on shorter spans where structural steel would be more economical. Consider, for example, that it is required to span a distance of 34 feet between masonry walls. If we assume a uniformly distributed load of 100,000 pounds and a floor system capable of giv- ing lateral support, a structural steel girder 24 inches deep and weighing 120 pounds to the linear foot will meet the requirements of the American Institute of Steel Construction. If headroom is not important, we could probably obtain a 28-inch
Page 53
April, 1929 section, weighing 112 pounds per linear foot which would also serve the purpose. In rein- forced concrete, a T-beam section, economically designed, would have a total depth of about 36 inches, a width of 14 inches, and approximately 1,650 pounds of steel if computed at working stresses of 650 and 18,000 pounds per square inch for the concrete and steel, respectively. Even these large proportions would have to be greatly increased unless the floor system chosen by the designer provided an adequate thickness of con- crete to act as a compression flange. It is also true that the weight of large concrete beams and girders may easily be 20 or 25 per cent greater than that of steel, including fireproofing. These facts would favor the use of a structural steel frame, or bearing walls with structural steel interior framing, for buildings requiring wide spans. Balconies, such as are found in many audi- toriums, may also influence the designer in his choice of structural frame, as such can usually be more expeditiously and economically built in steel than in reinforced concrete. The question, however, is too often decided by making merely a relative estimate of the costs of labor and materials, both based upon the same design. A valid comparison cannot be obtained in this way. As far as the architectural require- ments permit, comparative estimates should be based on designs which employ the type of ma- terial under investigation to its fullest advantage. Reinforced concrete is particularly suited to some forms of architectural expression, and even if it is not possible to actually "express" the feeling of concrete in the form or ornamental features of a building, it is entirely practicable to reserve its use for types of construction which are easily built of this material. The same should be true of structural steel; many architectural offices use steel sections more as a matter of habit than as the result of analytical comparison. Not a few designers look upon concrete as suitable for in- mobs Nx T 2 JU d ties ui | i i TEN i | ттт f ilti. t dH Eur The Women's Institute Building, Scranton, Pa. William Lowndes, Architect THE ARCHITECTURAL FORUM 607 dustrial work, but hardly to be considered for other types of buildings except in floors and foot- ings and as a fireproofing material. On the other hand, there are sections of the country where con- crete frames are very widely used for buildings of moderate height even with comparatively light loads. A study of relative costs, as influenced by local conditions, does not seem to justify this dif- ference in practice. From these data, and many similar considerations, we can be fairly confident that both the structural and architectural charac- ter of a building should play an important part in determining the type of skeleton to be used. 'The design of the reinforced concrete members forming the structural frame of a building is very largely influenced by the code or standard accept- ed by the designer, and it is not the province of this journal to treat of matters pertaining to the details of structural engineering. The architect is seldom interested in determining the number of stirrups in a concrete beam any more than he is concerned with rivet spacing on structural con- nections. It is important, however, to know that concrete beams of T-section require about 1 inch in depth for every foot of span; if the beam is of rectangular section, there being no concrete floor serving as a flange, 124 inches would be a fair es- timate. These figures are based on economical design for normal conditions and could be re- duced by increasing the reinforcement if the ad- ditional cost were warranted. The width of the web of a concrete T-beam should be between one- half and one-third of its total depth, including the slab. Rectangular beams are usually about one- half as wide as they are deep. Columns composed of concrete reinforced with only vertical rods are allowed under most codes, to sustain concentric loads computed as 500 pounds or 600 pounds per square inch on the “ef- fective concrete section," the value depending upon the quality of the mixture. The effective concrete section should be taken as the net area, The Frame is Reinforced Concrete and the Floors of R. C. Beam-and-Slab Construction
Page 54
608 ARCHITECTURAL ENGINEERING AND BUSINESS Part Two 4 m 9 my E B LA К Brick Used Over Reinforced Concrete Frame, Sanitorium Near Atlanta, Ga. Hentz, Reid & Adler, Architects exclusive of the steel, allowing 2 inches outside of the reinforcement for purely fireproofing pur- poses. Some codes, such as that at present in force in New York, allow the effective area to be taken as the gross column section, deducting only the space occupied by the reinforcement, which seldom exceeds 1 per cent of the area. The total supporting capacity of the column is then com- puted, in either case, by adding to that of the concrete the carrying value of the reinforcement, which is considered to support 7,500 pounds or 7,200 pounds per square inch when used respec- tively with 500-pound and 600-pound concrete. Although the design of columns with only ver- tical reinforcement is pretty well standardized, there is no uniformity in regard to spiraled col- umns. Unfortunately there is some slight justi- fication for computing their sustaining value on several entirely different principles. These have been picked up by the authors of our various building codes and combined with a variety of limiting percentages applied to both the amount of spiral and of vertical reinforcement. Although the present situation is an amusing commentary on our knowledge of this branch of structural engineering, or rather a reflection upon our ability to apply what little we do know, the matter is too technical to be of interest to the average archi- tect. Suffice it to say, that under the New York code a spiraled column, economically designed with 1 per cent of vertical steel and 2 per cent of spiral, can be considered to support 1,466 pounds on each square inch of the core enclosed by the spiral. In other more benighted sections of our country this same column would be permitted to carry only 971 pounds on each square inch of the core. These absurd differences, although more pronounced in the field of concrete design, exist in the ordinances governing use of other mate- rials. There seems to be no particular reason why structural grade steel of exactly the same quality should be considered to carry a working stress of 16,000 pounds per square inch in one city and 18,000 pounds in a neighboring city. The proper remedy for these inconsistencies lies in an honest attempt to make municipal codes conform with good practice. The specifications and suggested regulations promulgated by the American Con- crete Institute, The American Institute of Steel Construction, and the building committees of the Department of Commerce, contain much valuable information which could be applied to advantage. Footings. 'The study of comparative construc- tion as applied to footings offers an interesting field for the architect who desires to control the major decisions in connection with the structural work, without going into the details of engineer- ing. For all buildings of skeleton construction, whether of steel or reinforced concrete, the prob- lem of footing design is merely to clioose the most
Page 55
April, 1929 " "a К Жы — eh TEE 2s it 1 iu A nen EM THE ARCHITECTURAL FORUM 609 ulus — LI Ê UC mme E D Reinforced Concrete Frame of Building Shown on Opposite Page Hentz, Reid & Adler, Architects economical means of distributing the concentrated loads of the columns over an area sufficiently large to bring the load per square foot within the safe bearing capacity of the soil. Foundations upon rock involve one aspect of this same prob- lem, and the use of wood, concrete or steel cylin- der piles is only to increase the soil capacity. In- dependent footings, rectangular and preferably square in plan, of stepped or pyramidal pattern, are normally used to support the interior columns of a building and are also economical for exte- rior columns of skeleton structures, if there is space outside of the building line to permit con- centric design. The chief problem is to choose economical footings for exterior columns when there is little or no space available beyond the building line. With the exception of a type known as the “buttress footing,” and not widely accept- ed, the choice falls on either a continuous, a can- tilever or a combined footing. A continuous footing, which is nothing other than an inverted beam loaded with a soil reaction of usually from 6,000 to 8,000 pounds, and sup- ported by the columns, will probably be the most economical if the area available without eccen- tricity is sufficient to carry the column load. For example, if we are permitted a projection of 1 foot beyond the faces of the columns, which we will assume as the building line, and if the base- ment columns are 2 feet thick, we can make the footing beam 4 feet wide and still have its axis directly below the column centers. If the column spacing is 20 feet, we then have 80 square feet of available bearing area for each column. If the safe soil load is 6,000 pounds, this type of footing is capable of supporting a column carrying 480,- 000 pounds with some small deduction for the weight of the footing beam. The next choice, usually resorted to where no projection is permitted beyond the faces of the columns, and referred to as the “cantilever” foot- ing, is merely the application of a device for over- coming the tendency of the exterior columns to fall outwards owing to the fact that their footings cannot be centered beneath them owing to the proximity of the property line. The design, in this case, is similar to that of an interior, concen- tric footing but a concrete or steel beam, called a “strap,” is built connecting each exterior foot- ing with the nearest interior footing. The strap balances the eccentric moment and holds the ex- terior footing in equilibrium. The third choice for the footings of exterior columns adjacent to property lines is called the “combined” footing. Instead of employing a strap, as in the cantilever design, a heavy, con- tinuous slab forms the footing for an exterior column and the nearest interior column. As the name implies, this is merely a joining, or combin- ing of the two footings and is resorted to when
Page 56
610 ARCHITECTURAL ENGINEERING AND BUSINESS Part 'T'wo NSE ЕГУ NESS EER ERE SNES REPRE СТЕУ EER ERE PENI SRR NER SRE T VIT! LIIS gg, 11/1 n eee = S Typical Design of Reinforced Concrete Footing for Isolated Columns of either Structural Steel or Concrete; the Stepped Type is Preferable it is necessary to overcome eccentricity in an ex- terior column and use the entire area between col- umns for bearing purposes. When possible, com- bined footings are built rectangular in plan and extend toward the interior of the building a suffi- cient distance to insure that the center of reaction of the footing area coincides with the center of load between columns. If such extension is not practicable, owing to the interference of an eleva- tor well, or some similar obstruction, the portion of the footing supporting the interior column, which is usually carrying a heavier load than the exterior, is widened with the result that the foot- ing slab is trapezoidal in plan. Footings on piles follow these same classifica- tions and are designed in exactly the same way == — аа Гү МЕРЕ | The Combined Footing of Trapezoidal Type; Exterior Column at Right of Illustration J 1 NL ЧИТИ This Continuous Footing Acts as an Inverted Beam to Distribute the Loads of Exterior Columns A Typical Cantilever, or “Pump-handle” Footing; the Exterior Column is at Left of Illustration except that the individual pile reactions replace the uniform load assumed as the safe bearing capacity of the soil. Footings resting on rock are designed for loads varying from 15 to 40 tons per square foot, depending upon its hardness. Un- der our tall steel structures the typical billet and grillage design has become the general practice for foundations carried to hard rock. Where it is necessary to obviate vibration, such as that due to the movement of trains, specially designed vi- bration mats, composed of layers of lead and sheet asbestos, are employed at the bases of columns supporting buildings over railway tracks. The next step in planning the structural design of a building is the choice of the floor construc- tion. This subject will be covered in a succeed- ing article in THE ARCHITECTURAL Forum for May. The illustrations of footings are from “Concrete Building Con- struction,” by Theodore Crane.
Page 57
WINTER CONSTRUCTION AND SUPERINTENDENCE BY LEICESTER K. DAVIS HE trials of keeping winter construction go- ing smoothly and on unbroken schedules are over. The vigilance required to meet the attacks of cold and ice and snow has settled down to be- ing a far less difficult matter. It is a good time in which to make a check-up of results secured dur- ing that short but difficult period, and for archi- tects and builders to consider the effectiveness of their combined efforts in keeping winter activities going at high levels of efficiency and economy. 'The records of superintendence will doubtless settle many questions, show the wisdom of us- ing precautionary specification clauses, and justify closely coupled contacts that follow each step and stage of construction most likely to be adversely affected by winter’s influence. The purpose of all architectural superintendence is constructive, not destructive,—the obviating of faults which if not discerned in their early stages result in piling up those disconcerting “extras” always associated with elaborate correction or replacement of work not up to required standards. The difference between supervision and super- intendence is not, perhaps, as fully appreciated as it should be, The former term deals mainly with results and passes judgment according to stand- ards established for completed work; the latter follows more closely each unit of work through- out its progress, giving attention to immediate materials and methods, as well as taking into account those supplementary elements not strictly within the province of the specifications. Super- vision stresses final responsibility; superinten- dence performs a more cooperative service, which begins at the beginning and keeps on to final completion. All architects may not agree upon this grouping of relations, but many do, and it is from the point of view of those who do that distinction is here made in describing the more important specific methods with which architectural superintendents should be thorough- ly familiar in order to render the codperation which contractors welcome and by which owners benefit. Reading through many notes made during in- terviews with representative architects, I have been impressed by unanimity of their opinions in regard to winter superintendence. All seem to be agreed on: 1st: The need of many and frequent architec- tural contacts with winter work at every stage. 2nd: The value of familiarity with the pre- cautionary methods developed by various trades. 3rd: The necessity of forecasting procedure in regard to conditions under which each phase of construction shall go on. 4th: The good to all concerned of thorough understanding between the architect, contractor and owner as to the powers and responsibilities of the architect or his representative in advising or requiring specific forms of structural practice. 5th: The benefits which result from carefully worked out methods by which accurate progress reports of superintendence may be kept for in- corporation within a permanent record for cur- rent and future reference. Most architects with whom I have talked em- phatically recommend employment of a “clerk of the works" for all construction of any size that extends through the winter months, this in- dividual to be selected by the architect and to be under his direction with services paid for by the owner, and to have duties, powers and remunera- tion covered by contractual clauses. Maintain- ing superintendence of this character is a regular procedure in many offices. In others the office personnel includes a “field man" who is assigned, at an extra charge, to work during all or certain winter stages. Perhaps the first preliminary consideration of the architect in his approach to problems of winter construction should be the preparation of an outline which indicates how his contacts shall be governed. A comprehensive plan, worked out well in advance of the cold weather period, is sure to be of assistance in preventing otherwise puzzling twists and turns. Such an outline need not be elaborate. It should be built about only those definite phases of the work most likely to be seriously affected by lack of proper precau- tionary methods. It should cover uncertain points with clear indication of possible con- tingencies and directions regarding the manner in which they should be provided for. In this schedule of defence, one might well start from a list of materials and uses having definitely known requirements for protection, classifying with each the possible circumstances to be faced. In an analysis of this kind, proper protective ways and means almost automatically suggest themselves for situations that might not be thought of until a crisis in construction had arrived. At this preliminary stage the value of coóperation by an experienced winter constructor will often be extremely valuable, since what are sought are not merely descriptions of “textbook happenings," but rather those out-of-the-ordinary run of things which happen once in a blue moon, 611
Page 58
612 Interior Brickwork and Proper Temperature Con- trol. Note Muslin Covering Door and Window Spaces, and Salamander Placed to Effect Equal Radiation of Warmth and which sooner or later may happen again. One architect with whom I have discussed the subject has made a series of “pre-structural con- ferences," as he calls them, with winter-seasoned contractors a routine matter, even before specifi- cations are ready for bids. This practice he con- siders especially important where the construc- tion schedule is to include a part or all of the winter months. By frankly explaining his pur- pose to prospective bidders, he has gained in- formation regarding precautionary methods which has not only aided subsequent superinten- dence but has also clarified sections of his specifi- cations covering winter performance. In an outline such as that here referred to, several divi- sions are quickly established. The first of these will very likely deal with those elements of the structure upon which superintendence should be most thoroughly concentrated. Next, logically, follows the storage of material prior to its use; next, the methods to be employed during and fol- lowing such use; finally, there will be the general standards of winter practice and the specific forms of protection best suited to the locality and the type of structure. Included in this last should be provisions for “potentials,’—those things which probably will not occur, but which may. Structural safety is, of course, one of the prime factors with which superintendence should deal at any time of year. There must be assurance of ARCHITECTURAL ENGINEERING AND BUSINESS Part Two Thawing Out a Snow-covered Pile of Bricks with Steam Hose Should not be Necessary. Brick Should be Stacked with Complete Coverage of Top and Sides of Stack soundness in the bones and sinews upon which a building depends for ability to carry its load. And these, in practically all modern construction are steel, concrete and brick. Erecting steelwork in winter requires few departures from the routine of other seasons, except perhaps extra provisions for workers subjected to hazards and discom- forts of weather, wind and bitter temperature. Construction of concrete and masonry, on the other hand, calls for more carefully worked over methods. The aggregate that slushes to Decem- ber wall and floor and column forms, and the courses of brick that rise steadily despite numb- ing January days, are propositions very different from like work carried on in fair and warmer months of the calendar. Winter concrete is a finicky jade, and she exacts very definite forms of attention at equally definite stages of prepara- tion, application and setting. In order to make sure of final structural dependability in concrete, superintendence by the architect or his rep- resentative is of the utmost importance from the start to the finish of operations. Freezing tem- perature is concrete's greatest enemy,—one that is present from the minute the dumped sand and gravel start on their way to the mixer. There- fore the architects plan of superintendence should include a check-up on provisions made for heating, while actual superintendence should see that the means provided are adequately employed.
Page 59
April, 1929 The Frames Must be Sturdy to Withstand High Winds. There Should be Projection to Insure Space for Ample ‘Circulation of Warmed Air About the Exteriors of Forms Supports Ready for Tarpaulins. The warming of sand and gravel before they reach the mixer must be thorough and constant,— on small work, by the heat from wood-fired pipes traversing the mass, and on larger work, having considerable tonnage, by spreading the mass over and around grilles or coils of perforated steam pipes, so placed that distribution of warmth is evenly made throughout the material. The mixing water should be kept at tested temperature by a steam nozzle run into the water barrel at the mixer. These are but preliminaries. It is after the mix reaches the forms that the closest watch must be kept against laxity in maintaining pro- tection of the concrete as it attains the final set. Protective methods for concrete have become pretty well standardized. It is the duty of the architectural superintendent to see that they are employed at the right time and in the right way. Before winter concrete work is begun, the archi- tect and his contractor should be satisfied that apparatus adequate in type and capacity is ready to operate as soon as forms are built. The num- ber and sizes of tarpaulins required should be carefully figured. The methods by which they are to be hung and lashed should be determined. Salamanders in number sufficient to maintain correct temperature under the most trying condi- tions produced by a record cold snap should be provided. Heat holes in floor and ceiling forms should be properly prepared and spaced for con- THE ARCHITECTURAL FORUM 613 Cem M ob. zB) ap» E cm. ». & In Winter Superintendence it is Well to See that Snow Accumulations are Removed Before a Thaw Forms Puddles which an Overnight Freeze May Turn to Treacherous Sheets of Ice trol of covered areas above slabs. The distribu- tive outlets from main steam lines should be placed at the most strategic points. No matter how well protective equipment is selected, its proper use is imperative. The hand- ling of tarpaulins should be carefully supervised. Their placing should be such that definite areas are included, with perhaps a number of sections throughout the structure treated as localized units, each having its own form of heating ap- paratus, this obviating risks that always attend the attempt to spread a volume of warmth over a large area in parts of which temperature is cer- tain at times to be lowered perilously close to the danger line. Extra precautions should be exer- cised wherever structural safety is particularly essential. Winter superintendence should insist upon a record of day and night temperatures, and with these should be included readings taken frequent- ly at the bases of exterior columns and under the canvas above floor slabs, in order to prove be- yond all doubt that protection is being kept at a constant level. Contractors specializing in winter concrete have worked out well defined rules by which are de- termined the efficiencies of various types of ap- paratus used for temperature control. As ex- amples of these, in one locality the protective ef- ficiency of top covers on reinforced concrete
Page 60
614 ARCHITECTURAL ENGINEERING AND BUSINESS Part Two Concrete Faults Due to Improper Winter Precau- The Criss-cross Cracks Shown Extend Clear Through the Body of the Slabs tions. beam and girder construction in ordinary winter weather has been figured at 48 hours as standard for time before coverage should be removed, 96 hours being the minimum for side curtains. Flat slab construction, with more protection required, calls for extension of the protective period. The efficiency of salamanders has also been calculated, it having been determined, for example, that in northern sections temperatures of from 60 to 80? may be maintained by one salamander to every 300 square feet of floor. Heat holes, which per- mit transmission of warmed air from areas be- low slabs to the upper surfaces of the slabs, are figured in a similar manner. Each of these auxil- iary units should permit circulation of warmed air over approximately 300 square feet of proper- ly “topped” area during average winter weather. Should temporary radiation by steam be utilized in place of or in addition to salamanders, it also can be handled according to rule. Whatever methods are decided on, their ap- plication to the work in hand should be under- stood by the architect when planning and fore- casting the duties involved by winter superin- tendence. If unusual conditions are encountered, the plan should be flexible enough to deal with them. 'The thing of main importance, so far as architectural responsibility is concerned, is to be sure that the most effective forms of protection are provided and conscientiously employed. Con- ditions will naturally occur in which necessity of the moment may demand radical departure from original intent, and in such cases, the superin- tending architect must act quickly and with deci- sion fortified by judgment. Many architects, if in doubt as to justification of a change in method, feel that the responsibility should be placed squarely upon the contractor, final acceptance be- ing based upon tests for structural dependability. On a recent large industrial project, a decided innovation in the protection of winter-poured con- Flat Scaling Caused by Concrete Suríace Freezing Before Coverage was Applied. The Defect did not Affect the Structural Quality of the Slab crete floors came to my attention. It may or may not suggest use under similar conditions. In this particular locality it was standard winter practice to cover concrete floors with layers of marsh hay until the set had passed all risk of freezing. In repeated cases the architectural supervisor de- tailed to the work found that the feet of laborers who spread the hay caused marks and depres- sions which actually impaired the structural quality of the finished slabs. In addition to this, tufts of hay and other debris became imbedded in the mix as it set, necessitating a “burn off" with fired gasolene before sleepers for the final floor could be placed. The supervisor had used a rather daring remedy by deliberately leaving the wet surface exposed until a skin of ice formed, strong enough to bear a laborer’s weight without footprinting. Marsh hay was then applied in the usual way, thawing out the ice sheath before there had been penetration of cold sufficient to in- jure the body of the floor. Seemingly the only effect from this treatment was a slight flaking away on the surface, possibly to an average depth of 1-16 inch, but the architect should decide whether to allow use of such questionable methods. Essentials on which to be satisfied in superin- tending the winter care of concrete are: (1) Assurance that proper types of apparatus are on hand to provide adequate and constant working warmth for material before going to the mixer, properly warmed mixing water, immedi- ate exclusion of freezing temperature from forms until all risk is passed by the set. (2) Assurance that all apparatus is properly placed and working. Leaving concrete, we come to brickwork, per- haps the next most important structural element to be safeguarded. In general, the protective measures for temperature control surrounding use of concrete apply to winter brick building. Tarpaulins, salamanders, steam lines, radiation as independent units or in combination, are util-
Page 61
April, 1929 TNT. Temperature Control Assured by Tarpaulin "Top- ping" of Upper Surfaces of Concrete Floor Slabs. The ‘Manner in which Such Protection is Carried Out Should be Carefully Checked. Note the Snug Overlap Given Exterior Tarpaulins ized in much the same way for both materials. With brick, moisture becomes an added factor which winter protection must take into account. Wet brick for summer, dry brick for winter, is the rule. That section of the superintendence outline should begin with the storage of brick at the site. Obviously brick should not be piled helter-skelter as it is delivered from the truck, but should be stacked and covered over by sheds or canvas in a manner that protects sides as well as edges against contact with the weather. The ideal way in which to store brick awaiting use is within one of the areas kept warm by salaman- ders or other heating apparatus. This serves not only to keep it away from snow or rain but also prevents absorption of atmospheric moisture. It is well established practice to lay all brickwork at temperature well above freezing point. As with concrete, the materials which go into brick mortar should be prepared and mixed where tem- perature control is assured. Inside brickwork seems to offer no great prob- lems where adequate protective measures are planned for and employed. Care in checking temperature to keep it at constant working point is, of course, essential. The desire for comfort- able warmth on the part of the bricklayer is an aid in securing proper temperatures for laying brick. With brick laid outside the zones of tem- perature control, more closely coupled contacts are required than with inside work. Outside THE ARCHITECTURAL FORUM Interior View of Same Protection Shows Canvas Lashed to Framework. Clusters of Pipes Are Also Shown Projecting through Heat Holes Placed for Effective Distribution of Warmth from Salamanders on Floor Below joints, which may freeze and “pop”, carry a de- cided winter risk. Various anti-freezing com- pounds at the disposal of the contractor are valu- able when speed of erection is a pressing need. Nothing, nowever, seems to quite fill the bill as well as good old fashioned mortar, applied with cleanly struck joints, and thin enough to permit compacting that assists in a final set which pre- vents there being cracking or leaky walls. Many experiments have been carried out in an endeavor to find an ideal cold weather mortar. A test result and recommendation were published some time ago by the National Lime Association. The Association’s report said that “lime cement mortars are least affected by cold weather when mixed to a formula of 1 part cement, 2 parts lime and 9 parts sand.” The advantages stressed in its favor are: increase in tensile and compressive strength under low temperature; plasticity and ease in handling during winter weather; ease in proportioning; and low cost. The architect should investigate the mortar mix thoroughly. It has become widely accepted prac- tice to defer laying outside brickwork in winter when a falling temperature reaches 34°, and to begin only when a rising temperature has reached that point. Brickwork known to have been frozen should not be built upon until most thor- oughly thawed out, and portions in which frozen mortars might later cause disintegration should be torn out and replaced. Outside brickwork in
Page 62
616 wt * ARCHITECTURAL ENGINEERING AND BUSINESS Part Two бше "=, ris CS : Н LOI T M All-over Coverage Given a Municipal Pier which Was Completed on Scheduled Time Through a Winter of Record Cold and Snow. Behind the Tarpaulins, a Carefully Worked out Radiation System Provided the Requisite Heat winter should be protected by tarpaulins for three days after laying, with temperature maintained wellabove32?. So much for winter brick and brick- work as they must of necessity be treated here. As winter construction progresses, various auxiliary structural elements begin to play their parts. Not all of them, by any means, require special winter consideration. But those in which water is used should be on the list of those that demand use of precautionary methods. Моге and more tile work is being used in the architec- tural-structural scheme of things, and when in winter its application becomes extensive, cold weather precautions must be taken. Temper- ature has an important bearing upon the endur- ing success of the winter-laid tile. Experienced tile contractors know that tiles set at or below freezing point will sooner or later come down of themselves. A conscientious rule of practice re- gards 50? as the ideal temperature for setting tile in winter, with maintenance at about that point for 48 hours after the tiles are in place. Work should stop immediately when the thermometer registers close to 32°. Exterior tile work should never be carried on when there is even a remote possibility of there being freezing weather. Anti-freezing com- pounds are not very popular with most tile men. Those with whom I have talked discourage their use, claiming that results have not been satisfac- tory and that staining of the tile face is likely to occur. Tile body, like that of brick, absorbs moisture readily, and. in winter, tiles should be kept as dry as possible before application, within areas where working temperature is maintained. Plastering is another phase of work which should be safeguarded against too low a tempera- ture. Luckily, plastering is usually done when winter construction has reached the semi-finished stage, when necessary temperature is easily pro- vided and kept constant. With a clearly defined plan of procedure to follow, effective winter superintendence is not difficult for the thoroughgoing architect. The measure of its success depends largely upon hav- ing a clear idea of what is to be encountered, of knowing in advance the reactions of given mater- ials to winter conditions if left to themselves, and of knowing what must be done to prevent these reactions from taking place. In an article such as this some mention should be made of the effect of winter superintendence upon the attitude of the craftsman toward his work. The success of winter construction is not wholly dependent upon adherence to rules and standards for the storage and handling of mater- ial. Securing the comfort, safety, and team spirit of the men who do the work, from the pick and shovel gang on up the line to division foremen, should be a substantial part of the archi- tect’s superintendence plan. In his contacts he should be on the alert for any difficulties which might impair morale, and be quite as frank with recommendations for their correction as he is in matters of purely structural interest. I know the stimulus which follows an architect’s mingling with rank and file of workers on a cordi- al common ground; the impetus that follows his showing more than an impersonal interest in a craftsman's efforts ; the support he receives when it is understood that he is there to do his part in cre- ating a structural success for everyone concerned.
Page 63
BUILDING PROMOTION FROM THE BUILDER'S STANDPOINT BY WILLIAM A. STARRETT WHAT THE TRUE BASIS OF PROMOTION SHOULD BE. FINANCING METHODS, GOOD AND BAD T is needless to say that I was flattered to re- ceive an invitation to come to Chicago, par- ticularly to speak to architects. We in the East feel that the leadership in sound promotional ideas comes out of the West. One such idea is that of financing buildings by the issue of so-called “leasehold bonds." In the State of New York, and I believe in two other states in the Union, securities that are founded on leaseholds are not accepted by fiduciary institu- tions as investments for trust funds, thus limiting the use of this method of financing, which is, when soundly planned, about the best and most advanced form of real estate security. There is a legitimate and alluring field of en- deavor for those interested in architecture and building in connection with the financing of build- ing projects. We builders and architects hear of and see many that are meritorious. We know the great increment in value that comes about through our active participation in worthy proj- ects. It is well, however, to remember that we hear most of the successful cases of building pro- motion, and that very little is said about the un- successful. We can always point to examples where great profit has accrued ; but we should not forget that the path of this whole matter of pro- motion is strewn with wrecks of failure, and that bankruptcy courts silently carry on, without front page publicity, the foreclosure enforcement of liens. Land Worth What It Can Be Made to Pro- duce. Now the true basis of promotion is really the putting together of two valuable components of a creative enterprise. We have on the one hand a piece of land, either vacant or encumbered by obsolete buildings that must be destroyed in order that the land may realize its economic value; and we have on the other hand a brilliant conception of a great improvement which might be made,—the land to be worth so much and the building erected to be worth so much. The sum of those two will be so much; and no matter what it costs, within those reasonable limits that we here discuss, there has been an increment the minute the key turns in the doorway it is opening. Therein lies the lure to the promoter and the le- gitimate profit in the thing we are here consider- ing. Now, here is a thing builders and architects are tremendously concerned in, because we help to create that happy combination by bringing to- gether an unproductive or absolutely unimproved piece of land and the highest possible improve- ment for that piece of land. It would be an im- pertinence in the presence of real estate experts to suggest a short cut in the matter of appraisals, for we have all used land appraisals of other gen- erations and running down even to very modern times ;—that method of calculation which com- pares what another piece of land cost with that of land under consideration, without reference to the earning power of the newer project. Out of such a circumlocution of appraisal, we finally come to the solemn moment when the appraiser grudging- ly says that our project is worth only about so much. However, I dare to pronounce a bit of dictum as a short cut for the whole thing, by say- ing that land is worth what it can be made to pro- duce. If you want to be very meticulous in your definition, you may go on to say: “What it can be made to pay over a period of years”; but it is all said in those few words ;—land is worth what it can be made to produce,—its earnings. And therefore the builder and the architect, in their skillful, constructive activity, create a part of that increment. “Cost” and "Value" Defined. Now, this brings us to the crossroad which might be regarded as a dilemma, and sometimes taxes the consciences of us who may not think carefully and cleanly (I should say clearly) in these matters. The differ- ence that must be recognized, and the first thing, is the difference between cost and value. Cost, however, is the sum of those actual outlays of cash necessary to produce and complete the whole ; that is cost of the operation. The value of the operation is the complete thing,—the cost in- creased by creative effort that has been put into the operation by the work of the builder and the architect. The Wrong Sort of Promotion. Promoters are of so many different kinds that one must almost define it every time he uses the word. Consider- ing that type of promoter whom I should describe as reckless, but who calls himself a conservative, we think of him as reaching down into the very bowels of the building business, and with pros- pective values and deferments in payment, he ponders on that as a possible ground upon which to build his slender project. He thinks of engag- ing the efforts of the architect and the builder, and then reaches over the shoulders of both and proposes to engage the profits and the support of all the subcontractors involved. I have found this to be the case,—I am not speaking of territory 617
Page 64
618 with which I am not familiar, but in my own part of the country we find that the greatest mistake among promoters is that which leads a promoter to think that he can reach over the shoulders of the architect and builder and assess the subcon- tractor for a large percentage of the cost of the work. Here is the way that thing works, speak- ing for my own part of the country. Take items like structural steel, elevators and perhaps one or two other major items, and you find concerns vending those materials are able to take any part of the financing they say they will take. It is also to be observed that they carefully scrutinize the terms, and prices generally run correspond- ingly high. Beyond that, there is in the whole industry running down the line, a tendency to lean on the architect and the general contractor for advice, or rather for assumption of advice, concerning the taking of securities. There are 50 or 60 or sometimes as many as 75 subcontractors that enter into the making of a large, complicated, metropolitan structure. You have a great army of those people, ready to take any kind of paper offered, as a portion of their profit. Now what happens? If I could show you into the treasury departments of a dozen of the leading builders of this country, you would find a very sinister state of affairs. You would find there men who prom- ised to take anything in the way of paper and de- ferments, who are suddenly confronted with the fact that, after all, arithmetic on their books will not produce dollars,——and this is one of the fruitful sources of bankruptcy. Men not skilled or versed in this matter of deferred payments agree to take almost anything, and thereby dam- age and demoralize their own industry by these rash promises, which, of course, meet a judgment day sooner or later. I think, therefore, that one of our pernicious growths in this matter of pro- motion is the feeling that there lies, in the subcon- tractor, an almost untapped source of wealth. As a matter of fact, it doesn't lie there at all. It is detrimental and pernicious to undertake to extract by means of promises of subcontractors, part of the financing requisite for such operations. We all know, in this swift transition that has passed through the business, that borrowing is necessary for metropolitan development, and in- deed it has become one of the fundamental sources of our strongest outlets for capital. Insurance companies for years made loans when skyscrap- ers were early being introduced; they did it with а considerable amount of what they then thought was risk. It has turned out, of course, as we know now, that there was no risk to it. Never- theless, there is every credit due to those early in- stitutions for the courage and forward-looking point of view that made possible the financing of ARCHITECTURAL ENGINEERING AND BUSINESS Part Two these earlier constructions, when, as I have said and as many of you remember, buildings of even 12 stories were regarded as dangerous. More re- cently in the development, however, we have come upon the investment banker, or rather he has come upon us, and he has come out of a certain situation. In moments of pessimism I sometimes think no new idea ever entered the minds of the comptrollers of insurance companies after the year 1900. The absurd point of view, arising out of that ancient fetish that occurred with the first skyscraper and was met by the courage of that time, has made the lender feel that he is extend- ing a tremendous favor to the borrower, even though the security were as high as it is in con- servative lending. Of course, being of that class which benefits by borrowing, I naturally whoop it up for anything that produces larger loans. Nev- ertheless, I want to say that there is a responsibil- ity there that I think has never been squarely met by the so-called orthodox lending institutions, and that is this responsibility: When an owner (and let's call him also a promoter, because we are also speaking of that) has found a project meritori- ous, creative, needed and necessitous, if you please, and goes to an orthodox lending institu- tion, and is told that his estimates are too high and that the architects' fees ought to be cut, and that his allowances for this and that and the other thing should all be pared down to arrive at a fig- ure which is not only the cost but something be- low the cost; then when the loan is made on that basis, with no creative vision, and the owner is forced to the very edge of his financial scheme (and it is not without historical record that often an enterprise entered into hopefully by people in- tending to avail themselves of loans, has actually been wrecked through the very paucity of the loan, where a proper, forward-looking, optimistic view of the merit of the project would have given a better loan, without one particle of dis- paragement of the value of that loan or its se- curity), then, I say, the lender has much to an- swer for. Investment Banking. Of course we know that out of that situation we have evolved the “invest- ment banker." He has been the subject of all kinds of speculation. We have even had one or two go to the wall, but it is no more an indication of unsoundness of investment banking than the failure of a single bank is an indication of the un- soundness of our banking system. What really happened was this :—that out of this lethargic sit- uation of old time lending there was created an institution that would come in with vision and foresight and see the potential value of putting to- gether the vacant land and the completed struc- ture. That situation produced, our investment
Page 65
April, 1929 banker has rendered an inestimable service to architecture and the building industry. Cities everywhere have been benefited by the splendid vision and foresight of those investment bankers; and if we can point to an occasional failure, we can also point to a great number of successes. Sound Projects Should Be Encouraged. We are here together at least for one brief evening, taking to ourselves the virtue of being creators, and it seems a proper occasion to make a mighty protest in favor of the reliable, well organized, capable architect and the builder. "These people, as I have said through the burden of this talk, do a great creative thing. It is scandalous that they should be subjected to the losses and disap- pointments and be pushed out on the end of the limb at the very last quarter of these creative en- terprises, in reality and truly carrying the burden of the risk. That's what happens when you put your fees in as part of the enterprise. "There is a mission in the whole architectural profession. The architects and the builders are really doing a creatively helpful thing and are entitled to a rightful share of the emoluments of the project by reason of their having taken the great risk in- volved. We can almost talk unionism when we get on that subject, though we are not going to do it; but I say, as of other matters connected with the ethics of these two professions, that there is no greater field of effort, no more fruitful field of effort, than the constant, everlasting harping on that particular thing, and a demanding on behalf of architects and builders, of a fair share of emol- uments of the enterprise, they having really as- sumed the major risk therein. This business of promotion is also new; just think of it! We can all hark back to those days, here in Chicago, when a 15-story building was really a city wonder. The evolution and meta- morphosis of the whole industry have precluded the possibility of getting down to a code of stand- ard practices, but I think the time has come, and in fact enough has been developed out of the many great metropolitan structures that have al- ready been built, for us all to find out what the THE ARCHITECTURAL FORUM 619 standards,—at least the major standards,—of practice should be. It starts with questions of credit, questions in which bankers can help, ques- tions in which realtors and bankers can take a sympathetic interest. Their attitude toward the high ethics of these two professions will in the end tend to stabilize the business. We want pro- moters. А promoter is a most valuable factor in the economic forward progress of this country. The wrong kind of promoter is just as wrong as you want to make him, and the good, legitimate producer, who sees the values to be created by putting together the unimproved land and sound, well-thought-out building projects, is an asset and and institution of great value to us. My whole urge in the matter is this: With these fundamen- tals perhaps a little better understood, there could be no better objective for all of us concerned than to stand out for a higher, more ethical and prop- erly fashioned standard for promotion; for the exposing of flimsy, unsound promotion and enter- prises. 7 There is а back-kick in all of this promotion business, which need hardly be referred to. It is the last straw that always breaks the camel's back. Builders have an old saying: “АП money lost in building is lost in laying the thresholds." That has particular significance with reference to unes- timated items such as delayed receipts of rentals, unexpected necessary expenses that come up in connection with renting, etc. disappointments that are only temporary, in connection with rent- ing during the first months of a building's occu- pancy. We must consider not only the value cre- ated between the cost of the vacant lot and the finished building, but also those items of expense necessary for the closing of that last gap, and the provision for them demanded of the promoter, so that those investments we make of our fees and time in the equity, will be productive in accord- ance with the great effort which we put into it. Eprror’s Nore. This article by the vice-presi- dent of Starrett Brothers, New York, is based on his address recently given before the Chicago Chapter of the American Institute of Architects.
Page 66
THE PAINTING PROBLEM AND ITS SOLUTION BY W. C. WOODYARD Hs standards in living conditions have demanded a correspondingly greater refine- ment of finish and decoration. Whether it be the home, the school, or place of business, we find ourselves taking a fleeting, momentary pride in its exterior architecture, while living all day inside with decorated walls and woodwork. These may produce a refining influence, foster esprit de corps, and inspire pride, or the opposite reactions, —disappointment and depression. The value of this idea is well illustrated in the modern sky- scraper. Almost without exception the 35 fine Chicago office buildings built in recent years have been trimmed in genuine mahogany or wal- nut. Almost without exception, the wood carries a highly polished, piano cabinet finish. One of the largest leasers of Chicago loop property, in spe- cifically demanding a piano-like finish, declared it to be one of the differentiating marks between an “A” and a “В” class building. This trend toward refinement of finish and decoration in the office building, the theater, the school, and particularly in the modern home, is so evident as not to re- quire elaboration. The value of attractive and ef- fective surface protection is accepted. It is easy to visualize the result desired, and comparatively easy to define what is expected, but the problem of getting these results is a matter of interest if not of perplexity to the architectural profession. It is the purpose of this article to analyze the factors contributing to this perplexing situation, with the hope of suggesting a tried and proved policy which will insure more uniformly satisfac- tory results. With proper procedure, we may deal, first, briefly with the situations which re- flect lack of understanding and thoroughness, and secondly, more comprehensively, with the situa- tions in which apparently sound theory has not vindicated itself in practical results. Careless and unstudied specifications deserve only passing men- tion. Obviously, it is only human that a painting contractor would readily take advantage of one who reveals an inadequate knowledge of require- ments. Such specifications lead to costly barter- ing on the job,—bartering in which the architect and the client invariably lose. We are not war- rented in condemning painters as a class, and as- suming dishonesty on their part. The whole problem is frequently dismissed in this manner, and unfairly so. We shall make more construc- tive progress, for the purpose of this discussion at least, if the architect assumes responsibility for the situation and for the improvement thereof. It is recognized that no trade offers the possi- bilities for evasion, substitution, and dishonest practice that the painting trade does. Sufficient reason, therefore, to tighten up all along the way in the method of specifying, contracting, and su- pervising painting work. This is the only way to give the better contractor, who takes a pride in his work, a chance. In general, pride in work- manship is an inherent quality in all of us. It is unreasonable and unfair to assume, therefore, that the painter is not motivated by a desire to do good work. If, however, there is evidence to the contrary, and one will search deep enough for the cause, it will freqeuntly be found that the painter is forced by circumstances to depart from his ideal in order to survive. The better painting contractors will welcome the tightening-up policy which will enable them to do a type of work more satisfactory to all concerned. The “human fac- tor," or the reaction of the painting contractor to specifications and superintendence, is all-impor- tant in considering this problem. The painter is a very human, understanding sort of fellow. Asa matter of fact, when he makes up his bid he usually has to take into consideration three things, —first, the plans and specifications ; secondly, the architect involved, and what he is likely to exact or fail to exact; and thirdly, how far his compet- ing bidder is likely to go in discounting both of these factors. Too often, instead of being given a definitely lined-up proposition, the painter is asked to gamble in competition with others con- fronted with the same alternative. The general contractor contributes to the unsatisfactory situa- tion by seemingly being interested only in the low- est possible figure, and the only hope for the trust- worthy painter lies in a more careful definition, enforcement, and discrimination among painting contractors on the part of the architect. Now, we may logically turn to certain construc- tive suggestions which a broad survey of painting problems reveals as the more outstanding causes for unsatisfactory results. Specifications should be varied according to the cost of the building and the general line-up of the investment. A greater proportionate decorative expenditure is expected, for example, in a $60,000 residence than in an or- dinary apartment building yielding a moderate income. In the latter case, a decorative result ap- proaching in appearance the effect secured in the $60,000 residence is desired at a considerably smaller expenditure,—and it is possible to secure it. However, the curtailed specification is usually more difficult to write. The element of service- ability is necessary to both projects. It is true, 620
Page 67
April, 1929 and generally so accepted, that there is no econ- omy in letting down on the quality of materials used. This would result in a very negligible sav- ing,—a saving that would prove very expensive in the long run. The quality of materials, in fact, looms more important in the curtailed job. A five-coat rubbed enamel job may be cut down to a four-coat eggshell or a three-coat enamel job if necessary. The proper selection of coating in a three-coat enamel job is very important. Like- wise the size, three coats of paint, glazed and starched wall coating job may be cut down in the extreme case from six coats to two coats,—a coat of primer and a coat of paint. In each instance it is not claimed that an equivalent job is secured, but a decorative effect approximating the more perfect finish is had, and if the best materials are used, it is one that is reasonably durable and ser- viceable. On a large apartment hotel recently, an architect wrote a curtailed painting specification, specific as to requirements in coats and materials, that was practically fool-proof. He emphasized to the six contractors he had bid on the work that it represented exactly what was wanted. There was less than a 7 per cent differential between the highest and the lowest bid. It is not an uncom- mon experience for the highest figure to be dou- ble the amount of the lowest figure. This repre- sents a pretty large difference in appraisal of what is desired or will be exacted. It relegates the bid to a gamble. It represents a rather im- portant need of the “tightening-up” process here- tofore alluded to. The practice of cutting bidders down to a price, likewise offers a poor investment. We need not expect to get more than we pay for. It is far more logical and business-like to change the speci- fication, know exactly what one is going to get, and be in a position to insist on the terms of the contract. Of all the evils in connection with the painting problem, the one most complained of is substitution of cheaper materials for those speci- fied. This may be done in an underhanded way, such as displaying boldly a few cans of the speci- fied materials and actually using cheaper materials from barrels, refilled cans and the like, or it may be more above-board,—in out and out requests for approval of other goods. In the latter event, regardless of how represented, the material of- fered for approval is practically always cheaper in price and quality. We must first look to the specifications for im- provement in this regard. Here again, the human factor plays a prominent part, and the manufac- turer’s representative can play a constructive role. Let us trace the reaction of various types of spe- cifications. First, consider the specifications call- ing for several brands “or equal.” On the face of THE ARCHITECTURAL FORUM 621 it, it appears theoretically sound. It is intended to leave the matter open to competition.. It must be recognized, however, that materials such as paint, varnish, enamel and lacquer, with their complex chemical make-up, are not “equal” in quality or performance. The paint industry exists on a high- ly scientific basis necessary to meet the ever-in- creasing demand for a greater variety of paint finish. Products made from the same basic ingre- dients frequently differ widely in qualities of fin- ish and durability. The large expenditures for laboratory research and control, which constitute quite an item in this age, have found their justifi- cation in a greater refinement of finish, flexibility of use, and durability of results. A manufacturer establishes a reputation for progressive research and integrity of purpose. Competition in quality fosters research, whereas an accepted theory of equality would prevent progress. Added to that is the fact that usually one or two of the brands included are cheaper, which automatically makes them the standard of materials for the specifica- tion, and nullifies any value in including the high- er priced brands. Furthermore, it tends to elimi- nate possible coóperation from the manufacturer's representative. The representatives of the manu- facturers mentioned may be successively stalled off if the contractor chooses to be evasive. In any event, the salesman selling the job, whether it be of the grades specified or otherwise, is entirely in- debted to the painter for the business and is likely to be in no position to coóperate effectively with the architect in the interest of the finished result. We may go from this type of specification to the other extreme. Unquestionably, the exclusive specification offers the most definite proposition for the bidder; likewise a definite basis, an obli- gation in fact, for the manufacturer’s representa- tive to interest himself in the result which should be secured with his materials under the provisions of the specifications. This system has proved to offer the best investment and protection for the client. The plan, however, is objectionable to many because it does not leave the matter suffi- ciently open to competition. It is frequently main- tained that the manufacturer would use this ad- vantage to hold up the price to the contractor. That contention, however, is not substantiated by fact, and where made it should be carefully run down. The larger manufacturers have so many jobbers and independent, overlapping methods of distribution in the various communities that they create competition within their own representa- tives' ranks and make it practically impossible for the painter to be held up on price. Furthermore, it would not be sound business tactics for the en- lightened, reputable manufacturer in this age to be so shortsighted as to take advantage of an ex-
Page 68
622 clusive specification if it were in fact in his power to do so under his distributing arrangement. However, if we seek a specification that offers a uniform standard of materials for each contrac- tor to bid on, which provides for competition, which definitely eliminates the bartering for ap- provals after the contract is let, let us consider this plan. Definitely specify the product which you believe best adapted for the work, as you would probably do if you were writing a specifi- cation for your own home, incorporating as a part of your specification these clauses: "The bids to be considered must include a bid on goods herein specified, but the contractor may submit alternate bids on materials which he considers fully equal to those specified, provided he appends the name of the manufacturer and explicit designation of each product he offers as a substitute, stating the amount to be added to or deducted from his bid for such substitution. The architect reserves the right to award the contract to the lowest bidder on the goods specified or on any accepted sub- stitutes proposed in the alternate bids submitted as just explained. After the award is made, no substitution of materials for those mentioned in the accepted bid will be permitted." The basic bid on the standard set up commits all contractors to one figure on exactly the same thing, permitting a fair comparison of figures. 'The architect is not put on the defensive, later on aíter the contract is let, with requests to approve this or that material, the parpose of which request is usually to offer a saving to the contractor. If there is a saving to be made in the use of an al- ternate, architect or owner should get the benefit of the saving. How often is there an allowance offered with the request for an approval under the open specification? Furthermore, the matter is definitely settled when the contract is let. The numerous time-consuming requests for approvals are obviated. It is not left to the superintendent on the work to pass on materials, as is frequently the case. Best of all, it is a protection to the bet- ter element among the painting contractors who prefer to use the better grade products but hold mental reservations regarding the grades of goods some of their competitors would try to put across if they got the contract. We cannot deal comprehensively with the paint- ing problem without some reference to superinten- dence of the work. The plan and specifications may be worked out most painstakingly, and their effect be completely lost, as is so often the case, by laxity and lack of system in their enforcement. We cannot hope to deal with the subject of super- intendence in an entirely adequate manner in this article of small extent, but these suggestions to ARCHITECTURAL ENGINEERING AND BUSINESS Part Two the architect's superintendent may prove helpful: (1) Definitely familiarize yourself with the scope of the specifications, particularly as regards to coats and materials. (2) Learn definitely from the office what ma- terials are to be used if the specifications are not explicit. Check up definitely with the office any details regarding which there is uncertainty, such as color, decorative schemes, etc. (3) Make brief outline of specifications in your note book, particularly the sequence of coats and materials to be used. (4) Go over the specifications and details of the work with the painter when he first comes on the site. It is essential that both know that each understands that which is to be done. (5) Provide the painter with a room for stor- age of painting materials, retaining a key to the lock of the door. (6) Make regular inspections of storage room, taking care to identify contents of unlabeled cans. Reject and have removed immediately from the site materials not in accordance with the specifica- tions. Look for the original seals on goods. (7) In the early portion of the work, observe opening of a new can and application of each coat for at least one room to establish a standard result for the entire work. (8) Check painting work regularly, requesting information as to the particular coat being ap- plied and record data in note book for later use. (9) Be as careful in the check-up toward the end as at the beginning. We have made only scant mention of the manu- facturer's representative, and the part he can play in improving painting conditions. If he is a prod- uct of the modern school, which increasingly de- mands a more thorough and technical knowledge of the business, he can prove to be quite an asset. Ask him for suggestions in connection with speci- fications. If you are specifying and using his products, feel perfectly free to insist on his fol- lowing up the work and coóperating in getting a creditable result. You have a right to expect his interest to be more than in a sale of gallons of material; he should be interested in selling results. We have gone to some length to suggest a tight- ening-up process as a means of improving paint- ing work. We have suggested taking into account the human factor and making it more difficult to discount the intent of the specifications. These steps are necessary if the better element in the painting contracting business is to triumph. The better painting contractors will give a sounder in- vestment, and will give added meaning to the com- mon slogan of the paint industry: “Save the sur- face and you save all!”
Page 69
SOUNDPROOFING APARTMENT HOUSES-—PART ONE BY V. L. CHRISLER ASSOCIATE PHYSICIST, U. S. BUREAU OF STANDARDS OUND insulation is one of the most impor- tant details to be considered in building hotels, apartment houses, and office buildings. In the past little consideration has been given by architects to this necessary requirement. There is, however, on the part of the people who occupy these buildings, a growing demand for sufficient sound insulation to ensure a reasonable degree of privacy. Sounds which come through the ceil- ings are especially annoying to the person hear- ing them. In many cases the noises coming from adjoining apartments finally get on the nerves to such an extent that a tenant moves, though his apartment may be satisfactory in all other respects. Up to the past four or five years there has been little reliable information available on this sub- ject, and our present knowledge as to what is the best type of construction is somewhat limited. Many people have thought they had a perfectly satisfactory type of construction, and some build- ings which they completed were pronounced satis- factory. Possibly the next building, which was constructed as nearly as possible in the same man- ner as the others, would be a complete failure. On account of this uncertainty and in order to get comparative data on different types of con- struction, the Bureau of Standards several years ago constructed a special building (Fig. 1) in which measurements could be made determining numerical values for the sound insulation of dif- ferent types of construction. Most of the com- mon types have been tested, and considerable work has been done in making various modifica- tions in wall and floor construction so as to get the necessary degree of sound insulation. The prob- lem as a whole is very interesting, as there seem to be so many unknown quantities that it is gen- erally impossible to predict with any degree of certainty whether or not a partition will be a better sound insulator if certain changes are made in it. Owing to the work which has been done during the past three or four years, it is possible to make a much better guess than when the work was started,—but there are still many elements of uncertainty. It may be of interest to consider some of the factors which enter into the transmission of sound through a partition and to see how they may be controlled. To begin with, suppose we consider a sheet of metal which is fastened over a hole in a wall. If a source of sound is placed on one side of this sheet of metal, the sound energy is carried to the metal by the air, and the sheet is set in vibration. This in turn sets the air on the other side in vibration, and the sound energy is thus transmitted from one side to the other. By studying the sound transmission through a number of sheets of different metals, it has been found that the weight per unit area is, generally speaking, the most important factor. It is not the only factor, for a sheet of lead will transmit sound more than a sheet of iron or aluminum of the same weight. This difference is not large enough, however, to be of much prac- tical importance. In studying these thin sheets of metal, a very surprising result was found. А year or so ago a few double masonry walls were built and were found upon test to be quite effective as sound insulators. In fact the conclusion was reached that air was the best filling material. Sabine also reached the same conclusion. From these results it was then expected that two sheets of metal separated by an air space would be a much better sound insulator than a single sheet of metal. Much to everyone's surprise, it was found by ex- periment that two sheets of aluminum with a 134- inch air space between them transmitted almost as much sound as a single sheet of material. It thus became evident that the behavior of a double masonry wall was different in kind rather than in degree from that of a partition composed of two thin metallic sheets. The thin sheets of metal apparently need something in the air space be- tween them to help damp out the vibrations. Filling materials, such as hair, felt, cotton and balsam wool, were tried and found effective. From these results and other measurements on walls, there may be drawn some conclusions which appear to be more or less general. As long as а wall is constructed of masonry and is more or less homogeneous, the sound insulation is al- most proportional to its weight per unit area. 'This means that to get a proper degree of sound insulation the wall must be excessively heavy. То avoid this we may split the wall into layers, and in some way try to damp out the vibrations and prevent them from passing from one layer to another. One such method which has been devised is to hang the wall and ceiling surfaces on springs which are attached to the main part of the wall. 'The springs are supposed to act as do shock ab- sorbers for an automobile. They must be of just the right strength and stiffness, so that the wall surface can vibrate without transmitting too much energy to the main part of the wall. This prin- ciple was illustrated in some of the first measure- 623
Page 70
624 ments that were made at the Bureau of Standards on stud partitions. One partition was covered on both sides with expanded metal lath and a very thin scratch coat of gypsum plaster. The second panel was as nearly identical as possible, except that it had both a scratch coat and a brown coat of gypsum plaster. When the measurements were completed, the results were found to be somewhat surprising. The panel with the scratch coat only was found to be the best sound in- sulator. Ап examination of the two panels showed that the panel having only the scratch coat had a surface so thin that it had no rigidity and could easily be moved back and forth be- tween the studs for perhaps an eighth of an inch without exerting an appreciable force on the studs. The panel having both the scratch and brown coats had a more rigid surface and could not be moved so easily ; hence a force exerted on this surface was also exerted in considerable measure on the stud, and was thus transferred to the other side. The reasons are now apparent why the scratch coat was the best insulator. It had sufficient mass in its surface to prevent the sound setting up vibrations of sufficient force, so that the air be- tween the studs would act as a good tie, as in the case of thin sheets of metal; also the damping in such a surface is fairly large, and the energy would not be carried very efficiently to the stud and hence to the other surface. More- over, what little energy was carried through ARCHITECTURAL ENGINEERING AND BUSINESS Part Two was not sufficient to produce any great amount of vibration in the other side, as the move- ments produced in the stud were but slight, and the opposite scratch coating was not stiff enough to be set into vibration by small move- ments of the stud. In the case of the panel hav- ing the scratch and brown coats, the sound waves which set the first surface in vibration caused the second suríace to vibrate also, as this surface was stiff enough to form a rather rigid connection with the studs and thus could be put into vibra- tion by a small motion. From this experiment we see that if the surface can be attached to the main part of the wall so that it is free to vibrate without transmitting too much of the energy to the wall, we have an ideal condition. To accom- plish this, one company which is specializing on sound insulation, is supporting wall surfaces on the special spring mentioned here. By another method which is on the market the wall surfaces are supported on small metal chairs, which are lined with felt. In addition to this a lining of hair felt is used between the main wall and the plaster surface. Neither of these particular types of construction has been tested by the Bureau of Standards, but it is expected that either should give good results. A special type of masonry wall which has been tested in several different combinations by the Bureau of Standards, and which promises to give very satisfactory results at relatively slight in- crease in cost over ordinary construction, consists Fig. 1. Special Building of the Bureau of Standards for Testing Sound Insulation.
Page 71
April, 1929 of a masonry core of 4-inch hollow clay tile or brick turned on edge for the center portion. If the wall is a load-bearing wall, a heavier con- struction could be used and probably still better results be obtained. At the time’ the masonry wall was laid, wires were placed in the wall so that wooden furring strips could be tied to the wall 16 inches on centers. The plaster base was nailed to these furring strips, and plaster was applied in the ordinary manner. For the plaster base expanded metal lath was used with tar paper behind it to prevent the plaster from forming a bond with the masonry core. Two different kinds of fiber board and a gypsum plaster board were also used as a plaster base. Where there was a direct comparison, the fiber and plaster boards showed a slight advantage in sound-insulation value over the metal lath as a plaster base. This difference was not large enough to be of much importance, and was probably due to the fact that the plaster was only half an inch thick over the boards while it was seven-eighths of an inch thick when metal lath was used, and as a result gave a somewhat heavier surface. When the panels were in place, conversational tests were made as well as a determination of the reduction factor. In every case it was found that a conversation carried on in an ordinary tone of voice was barely audible to a listener on the other side, provided he was listening intently, but that he was unable to understand anything that was said ; also that if there were the slightest noise in the room he was in, the listener failed to detect any sound from conversation on the other side of the panel. Attempts were also made to carry on a conversation through these panels by shout- ing. In this case one could always hear the other person, but as a rule failed to understand any- thing that was said. Compared with the walls in many apartments, this is a decided improvement. It should also be borne in mind that the rooms in which these tests were made had bare concrete walls and were so situated that no distracting noises entered from the outside. If they had been rooms in an ordinary apartment, where there were draperies and furniture to absorb part of the sound, and if there had been some noise due to traffic or other causes, the panels would have given still better results. A. very interesting illustration of the effect of absorbing material was found when a box was .built and lined with some very absorbent ma- terial. There were some plate glass windows in the box, and when a person was on the inside his lips could be seen to move, but as a rule un- less he raised his voice slightly no sound could be heard. The person on the inside, however, could hear every word said by anyone outside. THE ARCHITECTURAL FORUM 625 A practical use of this might be made in offices where typewriter noises come through thin parti- tions and are annoying. If considerable material is placed in the room where the noise originates, it is sometimes possible to reduce the intensity to such an extent that the partition becomes satis- factory, and the noise is no longer disturbing. There is also a second advantage to use of such a treatment. The intensity of the noise being reduced makes the room much better for those working in it. Where tests have been made it has been found that this increases the efficiency of workers. Up to the present we have considered only air- borne noises. Noises due to impact form another class. They are among the most difficult to in- sulate, and are at the same time highly annoying. From experience we all know that a noisy ma- chine often sounds almost as loud in the room below as in the room where it is located. To experiment with noises of this kind, a special machine (Fig. 2) has been built by the Bureau of Standards. It consists of a set of five rods which are raised in succession by a set of cams. The speed of the cams is such that one rod is allowed to fall every fifth of a second. On a wood floor it is quite noisy—sufficiently so that it is rather trying to hold a conversation with anyone in the same room. Where there were wood joists there was some reduction of the noise transmitted through the partition, but it was still decidedly annoying. Some contractors build a so-called “floating floor" by using a fiber board, and then laying the finish floor on top and nailing through the fiber boards. This form of construction was tested to determine if such a structure was an improvement, and somewhat to the experimenters' surprise (although the results might have been expected), the structure trans- mitted exactly the same percentage of sound with- in the limit of experimental error as did the Fig.2. Machine for Experimenting with Impact Noises.
Page 72
626 structure before the fiber board was added. In other words, the vibrations were carried through the nails and destroyed any effect due to the fiber board. This applies to both air-borne and im- pact noises. In the next attempt a rough sub- flooring was laid and on top of this was placed fiber board, on which nailing strips were placed, and on this the finish floor. This will be re- ferred to as a “floating floor.” Details have not been worked out as to how these nailing strips should be fastened, but it is not believed that it will be difficult to do this and still preserve what sound insulation is gained. For air-borne noises, such a structure is quite satisfactory. Under usual conditions a conversation carried on in an ordinary tone of voice is not audible through it. For impact noises, however, the structure was rather disappointing. It was to some extent an improvement, but footsteps could be easily heard. The next attempt was to separate the ceiling from the floor joists. This gave about the same results, although not quite as good as the single set of joists and floating floor. A floating floor was then added. This combination gave the best results that were obtained with wood joists and was very satisfactory as far as air-borne noises were concerned. It still needs improve- ment in regard to insulating against impact noises. In fact, at this point in the investigation the conclusion was almost reached that the most practicable way to prevent noise coming through from the floor above was to minimize the noise being produced. This can always be done by using carpets or rugs. Cork tile and rubber tile are also good, and even linoleum is much better than a bare wood floor. After considering this type of construction still further, it is hoped that possibly some type of double ceiling will help and that it will be possible to prevent ordinary impact noises from coming through and being annoying. Further work will be done along this line in the near future. The other type of flooring which was studied was masonry. When impacts were allowed to fall directly on the masonry, the noise in the room below was practically as loud as in the room where the machine was situated. A floating floor was then added, with decided improvement. Finally a suspended ceiling was placed, and this gave the best results which have been obtained. For air-borne noises this is probably the best panel that has been tested. For one of the listen- ing tests a radio loud speaker was used. The loud speaker was driven somewhat harder than is usually customary for home use, and even then when listening through the panel it was impos- sible to tell whether someone was talking over the radio or an orchestra playing. In fact it is doubt- ARCHITECTURAL ENGINEERING AND BUSINESS Part Two ful whether a person could have been sure that the radio was going. It is certain that if the test had been made anywhere except in a room which was absolutely quiet, the radio could not have been heard. For impact noises it was not as good, but was quite an improvement. The noise from the impact machine was distinctly audible, but not loud enough to be readily noticeable if two people were talking in the room. A practical method of fastening the nailing strips remains to be worked out, as in the tests just described, they were simply laid on the fiber board. From some experiments on brick walls it is believed that these strips can be nailed or lagged to masonry at intervals so as to prevent their bowing up with- out affecting the sound insulation. From all this it is evident that the best form of sound insulation for masonry which has been found would be constructed somewhat in this way. What might be called the “core” of the building would be built in the customary manner, that is, with the walls and floors of masonry. From this point the procedure would be different. Each room has been formed by this rough ma- sonry, and inside of this the finished surfaces are to be built. Instead of plastering directly on the masonry to form the wall and ceiling sur- faces, this part should be furred out so that the finished plaster surfaces are not in direct contact with the masonry. In the same way the floor should be of a floating type. In other words, we might picture it as a box within a box, the inner box being attached to the outer in as few places as possible, and these connections should not be any more rigid than is necessary. Exactly how these connections should be made to get the best results is rather a difficult matter to decide and needs more investigation. For wood construction, the progress has not been as encouraging as for masonry. This is possibly due to the fact that sounds do not pass through most types of wood construction as easily as through masonry, and therefore the incentive for improvement has not been as great. Use of staggered studs and staggered floor and ceiling joists has been suggested as a good method of construction. The laboratory tests do show an improvement in such cases, but not as large as was expected; and it is a question whether the improvement is sufficient to justify the additional cost. Another method is to use fiber board be- between the studs and lath. The improvement in this case was not as great as had been hoped for. Work is still being done along this line, and it is hoped that a satisfactory solution will be obtained which will not necessitate an expensive installa- tion. In all of the laboratory work done, one impor-
Page 73
April, 1929 tant factor has had to be ignored, and that is water pipes, soil pipes, electric conduits, gas pipes, etc. All of these form excellent paths by which sound may travel, and they may frustrate all at- tempts at sound insulation unless care is taken to install them properly. One suggestion might be made about noisy water fixtures. To begin with, a fixture should be bought which is as quiet as possible. Even then fixtures are often noisy if the water pressure is quite high, and consider- able energy has to be dissipated as the water flows through. This often sets the fixture and with it the pipe in vibration which can be heard in all of the adjoining rooms. It is practically impossible to insulate against such sounds, but it is relatively simple to prevent their being produced by in- stalling a reducing valve where the water enters the house and reducing the pressure so that it shall not exceed say five pounds per square inch at the fixtures. To secure a good flow of water this necessitates a somewhat larger pipe than usual. Doors and other openings also present problems which have to be dealt with according to their individual cases. "Ventilation pipes also present problems. One rather costly mistake in planning an apartment building came to the writer's attention. The bathrooms were built di- rectly over one another. As there were no out- side openings, the ventilation was taken care of by a shaft into which there was an opening from each bathroom. As a result, a person standing in one bathroom could hear everything that went on in all of the other bathrooms, since the venti- lating shaft acted as a speaking tube. As a result of this the owner was unable to keep tenants in the apartments, and he has spent several thousand dollars trying to remedy this faulty construction, but with only partial success. The foregoing is intended to be only a brief outline of the work that has been done on sound insulation and to suggest some of the things that are to be avoided. It is not felt that this article would be complete unless a brief reference were made to results of laboratory tests which have been published. Unfortunately, these figures do not give absolute results, such as can be obtained for heat insulation, but depend on the manner in which the measurements were taken and also to some extent on the rooms in which the measure- ments were taken. For this reason it is rather difficult to compare results made by different observers. If comparisons are to be made be- tween different panels, it is rather desirable that all of the results to be compared should be made by the same observer. It is also desirable to call attention to the form in which the results should be published. Most of the laboratory measure- ments on sound transmission are made by using THE ARCHITECTURAL FORUM 627 a telephone or microphone to pick up the sound energy which is to be measured. These instru- ments measure sound on what we shall call the "physical" scale. But the most universally used instrument for detecting sound and estimating its intensity is the ear, and unfortunately the ear scale is not the same as the physical scale. As the intensity of sound increases steadily on the physical scale, the response of the ear fails to keep pace with the increasing energy of the sound waves, but is in fact proportional to the logarithm of that intensity. For example, two sounds of intensity, 10 and 100, as measured on the physical scale, would seem to the ear to have the ratio of 1 to 2, the common logarithms of 10 ап! 100. And because of the almost universal use of the ear as a means of detecting sound, it is advisahle to express the results of the experiment on the ear scale. This method of expressing results presents some difficulties. While the relative sound trans- mission of two panels is always the same on the physical scale, no matter how loud the sound which seeks transmission, this is apparently not the case on the ear scale. A numerical example, given in this table, will illustrate this point. We consider two walls, A and B, of which A trans- mits 1/1000 and B 1/100 of the incident sound energy, measured on the physical scale: Intensity of Sound Intensity of Sound Transmitted : on Far Sideof Wall: Physical Scale Ear Scale Physical Scale Wall 1,000,000 ....... A 1000 3 (—log. 1,000) B 10,000 4 (—log. 10,000) 10,000 ....... A 10 1 (—log. 10) B 100 2 (—log. 100) From this it may be seen that while A is 10 times as good as B (in the physical scale), no matter what the original intensity of the sound may be, the ear estimates A as twice as good as B for a faint sound, and both A and B as nearly the same (ratio 4/3) for a louder sound. We should therefore be cautious about the use of such phrases as "twice as good a sound in- sulator"; the point that should be emphasized (in advertising or otherwise) is not whether one material is twice as good as another under some special condition but whether it gives sufficient sound insulation under conditions as are usually prevailing to reduce the sound to a point where it will not be annoying. This means that to make a satisfactory installation one should know ap- proximately the intensity of the noise he is trying to insulate against and approximately how good a sound insulator is the type of structure that he proposes to build. It is hoped that these sugges- tions will be of benefit, and that they will aid in the building of better apartment houses.
Page 74
A MONTHLY REVIEW OF EBRUARY construction contracts awarded in the 37 states east of the Rocky Mountains show a 12 per cent decline from January of this year and a 22 per cent decline from February, 1928, according to figures provided by the F. W. Dodge Corporation. The total valuation of this February construction, —$361,273,900,—covers а period of four days less than the January totals, but there seems to have been approximately the same daily construction volume as that existing since the beginning of 1929. Combining the figures for January and February, 1929 gives a total of $771,241,800 and represents a decrease of 14 per cent from the 1928 construction for that period. The district consisting of New York state and northern New Jersey, with a February total of $74,985,900, showed a falling off of 26 per cent from January of this year and 46 per cent from February, 1928. In the central west the total con- struction for February of $99,321,000, here again, was below the figure of the previous month by 12 per cent and below that of February, 1928 by 35 per cent. The only other district which showed a decrease for February, 1929 was that including the southeastern states, which had a total of $34,- 266,700, which is 12 per cent below the figures for ANNUAL CHANGES THE BUILDING SITUATION MONTHLY CHANGES e COSTS AND CONDITIONS February, 1928, and 9 per cent below the January, 1929 total. In the New England states construction was the highest ever recorded for this month. The total for the month of February was $26,430,700. In the middle Atlantic states the value of con- struction started during February amounted to $50,689,700, an increase of 3 per cent over that of the preceding month and 9 per cent above the total for February, 1928. The Pittsburgh district showed an increase of 22 per cent over l'ebruary, 1928, but its total of $50,298,500 was 12 per cent below the figures for January, 1929. This same condition existed in the northwestern states where the February contracts, $3,746,500, were 70 per cent higher than for February, 1928, but 40 per cent below the January, 1929 figure. The Febru- ary contract total for the 37 states show that 36 per cent of all construction represented residential buildings, 19 per cent commercial buildings, 16 per cent public works and utilities, and 16 per cent industrial projects. Contemplated projects report- ed during February reached the total of $772,- 621,600 for the 37 states. This is 6 per cent less than the amount of contemplated work reported during January of this year and 18 per cent less than that reported for month of February, 1928. 1928 1929 1917 1918 1919 1920 1921 1922 1925 1924 1925 1926 1927 JAN FEB MAR APR MAY JUNE JULY AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUNE JOLY AUG SEP OCT NOV DEC INDEX I9J5 BASE 250 INDEX 1926 BASE UT ы [ЫА || ИШКА РАШИ Иа; od | TTT | aN room Te Pet TT BMEICHIENE De АНАС = «s BAUEN EMI а ports іп basic materials and labor costs under national averages. by the United States Department of Labor. Engineering News-Record. (4) Money Value of New Construction. (5) Square Foot Area of New Construction. The dollar scale is at the left of the chart in millions. volume of new buildings. sz к Ltt a АРИР T HESE various important factors of change in the bu ilding situation are recorded in the chart given here: The square foot measure is at the right of the chart. | || зезргутер fonsrkudndn | | MA ZN Лр SSSCASNENENNE be а) Duilding Costs. This includes the cost of labor and materials; the index point is a composite of all available re- (2) Commodity Index. (3) Money Value of Contemplated Construction. which plans have been filed based on reports of the United States Chamber of Commerce, F. W. Dodge Corp. and Index figure determined Value of building for Total valuation of all contracts actually let. The measured The variation of distances between the value and volume lines represents a square foot cost which is determined, first by the trend of building costs, and second, by the quality of construction. 628
Page 75
THE SUPERVISION OF CONSTRUCTION OPERATIONS BY WILFRED W. BEACH THE FIRST DAY ON THE JOB—(Continued) Editor's Note. Mr. Beach here continues the consideration of "The First Day on the Job," Chapter 4 of which appeared in the February issue of THE ARCHITECTURAL FORUM. Regarding saving by the waiving of a bond, the architect was known to be greatly in favor of so doing, as he regarded the unnecessary addition of 1% per cent to the cost of a building to be quite unwarranted, except only as a pure matter of in- surance. If it had been a private owner, the super- intendent was quite sure that, with such a high class contractor, the architect wouid approve the saving, but, this being public work, the question was entirely one for the board to decide. It was obvious that the architect could not in any way be held for any of the contractor’s defections, al- though the architect and superintendent would do their best to see that the contractor fulfilled the terms of his contract and met all his obligations pertaining thereto. It was thereupon decided that if a surety company could be found that would underwrite the architect’s form of bond, such bond would be accepted ; otherwise the board would consider doing without one. The agent was persuaded to send a night letter to his com- pany, with the result that a bond in acceptable form was promptly forthcoming and all was well in that particular. Returning to the site after lunch, the contractor was found directing his new foreman, starting work on temporary buildings, but it was appar- ent that neither had thought to consult the speci- fications on the subject: “TEMPORARY OFFICE BUILDING. The Contractor shall, immediately after award of contract, provide a substantial, weatherproof building at the site, containing an office for the Superintendent, of at least 120 sq. ft. of floor area and fitted with movable sash on each open side, substantial door (with butts, latch and cylinder lock), table for blueprints, desk with drawers, locker, stool and two chairs, all as directed by the Superintendent and at the ex- pense of the Contractor, who shall provide heat and light for same. "CONTRACTOR'S OFFICE at the site shall be a substantial, weatherproof building, properly heated and lighted and appropriately furnished. It may be under same roof with Superintendent's office, with partition separating. The Contractor's office shall be the proper place of deposit for all copies of all drawings and specifications and for all his file records pertaining to the work. It shall also be the proper place for delivery of all orders and instructions to the Contractor. The Contractor or his l'oreman shall be constantly in charge of same during working hours and shall maintain (on shelf accessible to the Superinten- dent) a telephone, served and listed by the local exchange, all at the Contractor's expense. Free use of the telephone shall be granted to Repre- sentatives of Contractors, Subcontractors, Owner and Architect, except that the Contractor may require reimbursement for tolls on long distance calls. He may also have a pay telephone installed for the use of others. The Contractor's office shall not be used for the storage of equipment or materials nor as a loafing piace, “MATERIAL SHEDS. The Contractor shall provide at least 3 shelter sheds where directed, separate or under one roof, each containing 260 sq. ft. (or more) of floor area, and of substantial weatherproof construction, with hinged door to each shed, and a window on each exposed side. Each door shall be fitted with hasp and staple and brass padlock with necessary keys. The Superintendent will assign space in these sheds according to his best judgment. “TOILET CONVENIENCES for all persons employed on the work shall be constructed and maintained by the Contractor in accordance with City ordinance and State laws, properly lighted and heated and kept clean and sanitary, satisfac- tory to Superintendent and local Authorities.” Being set right on these subjects, the contrac- tor and his foreman next proceeded to “stake out" the building in accordance with the plot plan, erecting substantial batterboards at each of the four corners. Fig. 7 illustrates the customary and proper manner of setting batterboards, which should be located far enough back of the edge of the excavation to be out of the way of teams and trucks. The boards are nailed to substantial stakes driven well into the ground and notches are cut in the upper edges as shown. “С” and *H" are on lines of outside surfaces of basement walls; “B” and “Т” mark the inside surfaces; “A” and "D," and “С” and “J” are the outside lines of the footings; and “E” and “F” are the limiting lines of the excavation. Cords stretched from these notches to corresponding notches in boards at opposite corners afford lines from which a plumb-bob can be dropped and lines or points in the excavated portion be correctly located. Thus, plumbing down from intersection at point “L,” the contractor locates the corner of his ex- cavation at “К” If it is desired to prove the square of the corner at “L,” one can use the simple rule of “the square of the hypotenuse is equal to the sum of the squares of the other two sides of a right-angled triangle,” measuring 40 629
Page 76
630 ARCHITECTURAL ENGINEERING AND BUSINESS Part Two Fig. 7. A Proper Arrangement for Setting Batterboards feet in one direction from the corner, 30 feet in the other direction and 50 feet across the hypotenuse. This should be done with great care, as the variation should not be more than % inch in 100 feet. Here is the superintendent's report of the first day's activities at the site:— Work day :—No. 1. Force worked :—10 hours. Weather conditions :—Finest. Temperature :—78° to 82°. Number and kind of workmen employed :— General Contractor:—6 carpenters and 1 foreman. Excavating Contractor :—6 men with teams, 1 foreman, 1 steam shovel man. Work today consisted of :—Taking out trees and shrubs; protecting trees and walks; starting stripping loam; bringing on steam shovel; start- ing to stake out the building and put up sheds. Cause of delays, if any :—Contractor submitted bond on bond company's printed form which was rejected. He was notified he could continue work as trespasser until bond is settled. He is proceed- ing with that understanding. Board is to meet to- night to consider subject. Drawings and information needed :—Contrac- tor needs two complete sets of working drawings at once; one on cloth. Daily letter:—]ob started 2 days ahead of schedule without authority, but weather too fine to stop it. Contractor's liability insurance policy is No. 283,576 in Co. Grading sub- contractor was ordered to get policy at once; promised for tomorrow. Job telephone, electric and water supply ordered in. Permit applied for; said to be a matter of form on public buildings. To this, the superintendent added his room ad- dress for regular mail and the address of the job for receiving telegrams and special delivery letters. CHAPTER 5 BEGINNING THE WORK FTER the first day's preliminaries at the site, the morning of the second day proved a busy time for the superintendent. First, he found that the subcontractor for grading had changed his mind about getting a liability insurance policy, —simply refused to do so, intimating that he considered the demand for it to be only attempted graft on the part of the member of the board of education who was agent for such insurance. He claimed further that the law did not require such insurance to be carried by employers who were financially responsible. To this the superinten- dent rejoined that it was not a question of law but of contract requirements, and that the policy must be forthcoming, quite regardless of who might be the agent. Here appeared the chairman of the building committee of the board, accom- panied by the principal of the high school. This board member and the general contractor added the weight of their counsel to that of the super- intendent, as a result of which the grading con- tractor finally agreed to secure a policy from an-
Page 77
April, 1929 other agent, and a copy of the application was handed the superintendent a little later in the day. In discussing the work with the board member and high school principal, two matters of vital importance developed. One was that the school man had been delegated by the board to act as its representative on matters pertaining to the new building during intervals between board meetings; the other, that another board member, who was also a member of the town planning commission, had an idea that the building, located on a hillside with a fine prospect to the south, would look better and have a still finer view if raised about 3 feet higher than shown by the drawings. Decision on this was deferred, pend- ing the next visit of the architect, due the follow- ing Monday, but the other matter was not one that could be either deferred or disposed of. The intervention of such an "agent" in building pro- grams is not unusual and is a fruitful source of friction in too many instances. In the case of private work or that of a corporation, the agent is frequently looking more to his own interests than to those he represents, as a result of which the superintendent finds him presently aligned with one or more of the contractors to the detri- ment of the work. Even on public work, the agent, with no apparently dishonest intent, may be heard criticizing the architect and his docu- ments as much as he does the performance of the various contractors. His relation to the work is only semi-official, with no definite limita- tions and, unless he is a very unusual individual, he is much more of a nuisance than a help. Hav- ing no real authority, it is nevertheless difficult for him to avoid assuming the semblance of it, especially if he be, as in this case, a school official accustomed to dictating to his subordinates. It is difficult to understand why, after employing an architect to conduct their operations, owners should consider it necessary to inject a person- ality whose very employment means merely an added problem to be dealt with. If a superin- tendent is compelled to face it, he had best “‘culti- vate" the incumbent and trust that he will not prove a deliberate trouble maker. This man had started being officious the pre- ceding day, before the arrival of the superin- tendent, by directing the grader to have the slip- scrapers dump the top soil into a small ravine that required filling. This error was corrected, and the loam was ordered piled on high ground where it would be subject to minimum wash from storm water, as provided in the specifications : “TOP SOIL. At beginning of excavating, the black earth at surface shall be removed to a depth of 9” to 12” over the building site and piled on premises where directed by the Super- THE ARCHITECTURAL FORUM 631 intendent, to be distributed as required before completion of the work.” Neither the school man nor the grader had thought to consult the specifications on such a minor matter, but the incident was of value as initial proof that there should be but one head to the work. The superintendent and the principal also re- viewed other specification paragraphs especially applicable at the beginning of the work: “PERMITS for building construction, street obstruction and water connection shall be taken out by the Contractor before operations are started. He shall pay all fees for same, includ- ing inspection fees and cost of all water used for the work of others, as well as for his own operations.” "PROGRESS PHOTOGRAPHS shall be taken by a professional photographer at the ex- pense of the Contractor at intervals designated by the Architect, 12 negatives in all, on 8" x 10" plates. Three prints from each negative, mounted on linen with binding margins, together with the negative, shall be delivered promptly to the Superintendent by the Contractor, in each case." "LINES AND LEVELS. The Owner will have lot lines and restrictions established and a copy of survey provided on which same are indicated, also stakes and marks evidencing same, together with a permanent bench mark con- veniently located. The responsibility for all other lines and levels necessary for proper loca- tion and erection of the building and appurte- nances rests with the Contractor who shall em- ploy a competent instrument man." "USE OF PREMISES. (From Art. 42 of A. I. A. General Conditions.) The Contractor shall confine his apparatus, the storage of his materials and the operations of his workmen to limits indicated by law, ordinances, permits or directions of the Architect and shall not un- reasonably encumber the premises with his materials." "PROPERTY CONFINES. The Contractor shall limit the storage of his materials and the operations of his employes as prescribed in Art. 42 of the General Conditions and shall not in- fringe upon storage and operating space as- signed to others. The Contractor has no au- thority to permit the use of any portion of the premises by anyone, except for business con- nected with the construction in which this con- tract is concerned." "EXCAVATING IN GENERAL. The Con- tractor shall provide all excavating for base- ment, areas, etc., all to the various depths re- quired. Hand excavating for pits and footing
Page 78
632 trenches is included with foundation work. Excavations shall extend 2’ 0” outside of all basement wall planes and to 9” below finished planes of various basement floor levels. Work shall start at one end of the building, as di- rected by the Superintendent, and shall proceed uniformly to the opposite end, completing as it progresses, so that the first end can be turned over to concrete workers without waiting for entire excavating to be completed. The work shall be so laid out and conducted as to pro- duce no conflict between concrete workers, trench diggers and those working on remaining excavating.” Taking stock of these matters in the order quoted, the superintendent learned that applica- tion had been made for a building permit and that a set of prints had been filed with the local build- ing department, that the issuance of a permit in due time was to be expected as a matter of course, but that nothing had been done about water sup- ply or the first progress photograph. He insisted that the contractor give these subjects immediate attention and that he also arrange at once for the requisite telephone service. The foreman and an assistant were continuing the work of staking out the building, the former making use of a surveying instrument. The con- tractor satisfied the superintendent that he, the foreman, could qualify as the "competent instru- ment man" demanded by the specifications. The superintendent later verified this, as well as the accuracy of the instrument and the work done by it. Meanwhile, a carload of cement had arrived on the tracks, and the contractor was anxious to unload it, to avoid paying demurrage. He asked permission to have it stacked on the shed floor and have it covered with tarpaulins. Reference was made to the specifications, wherein clauses were found pertinent: "ALL CEMENT, except where otherwise specifically stated, shall be approved Portland, properly tested before using. It shall conform in all particulars to the latest standards and tests of the American Society for Testing Materials. Samples shall be taken as directed. Each car lot shall be stored separately and plainly marked for identification. "Cement shall be stored in the water- and weather-proof shed, provided by the Contractor (as elsewhere specified), with floor well up from the ground. None may be used that has been exposed to weather nor from bags showing water marks or caking." The contractor, in view of these restrictions, was directed to leave the cement on the tracks while the shed was rushed to completion. Four ARCHITECTURAL ENGINEERING AND BUSINESS Part Two samples were taken from the car lot and sent to the architect's office for testing, the brand being one known to be acceptable to him. The manu- facture of Portland cement has reached such a degree of standardization and excellence that metropolitan architects and contractors seldom have cause to reject more than an occasional sack that has met with accident. Cement for use in cities is always subject to testing, and hence it is safest and most economical for the manufacturers of this commodity to ship none that might fail to meet requirements. This is not so in rural districts, where most of the cement sold (other than that shipped in car lots for road work or large buildings) is first stored in lumber yards, then distributed in small parcels to local builders who have no desire to test and no convenient facilities for so doing. Such cement should be carefully watched, as it is not unusual for it to fail under test. It may have been originally bought at a bargain because of its inferiority. There is always a chance that a country dealer will try to unload some of it on such work as this school, in a real or pretended emergency, hence the wide awake superintendent will keep an eye on it and should warn both the dealer and con- tractor that no such old or stored cement is to be used under any circumstances; and it would therefore be expedient for the dealer to make sure that he has enough of the right material on hand at all times. The location of sheds and the dumping of top soil led to a general discussion of the contractor's yard layout. Together, he and the superintendent evolved a working plan for all temporary storage and facilities, as shown by the plot plan, Fig. 8. 'The superintendent's interest in this phase of the work has to do only with seeing that provision is made for storage space for minor contractors' materials, and that temporary buildings and heavy materials are not so placed as to be in the way of trenching for sewer and other piping. In this case, the available space was ample for all purposes, but in a more confined location, con- siderable ingenuity must be exercised in design- ing a temporary layout of maximum efficiency and in avoiding friction between all contractors demanding accommodation. It will be noted that this contractor arranged to have his sand and gravel dumped on the paving, to avoid the ex- pense of building a floor, as would have been his alternative under the specifications. Materials to be first used from storage piles, such as floor tile and common brick, were piled as close in as pos- sible. Floor tile (for first floor only) would be all used before the hoist would be placed in ser- vice. "Thereafter, brick and wall tile, in limited quantities, could be unloaded close to the hoist.
Page 79
April, 1929 THE ARCHITECTURAL FORUM 633 4 Reinfg Bars Service ^77 LLL .LI——————————Q———É——— Piumbin: т ing | үт ч ATHLETIC FIELD uw EM ES & = Lumber ЕП Iconé 8 Floor ‘Wail Parts P is [Planit | Tile Wile |е / Forms | je 11 _] — Grading Material ee ТЕ © о тыы, R. РА Fig. 8. Plot Plan Showing Disposition of Building Materials on the Site Larger areas were allotted to items requiring sorting and re-handling, such as lumber, cut stone and reinforcing bars. Temporary drives were combined with the future service driveway to afford maximum communication at minimum dis- tance, inasmuch as these roadways had to be maintained for several months and might be very muddy at times. For this latter reason, the con- tractor was given permission to start hauling cin- ders for use as temporary paving for these drives with the understanding that such cinders as were still in fit condition could later be used as underbed for walks and permanent driveway. ` In the afternoon of this second day, the con- tractor suggested a trip to the gravel pit from which he expected to secure both sand and gravel, using the latter “pit-run.” In fact, he admitted having gambled on such intent and had reduced his bid several hundred dollars on the chance. Before leaving the premises, the superintendent wrote an order to the contractor to hold his ex- cavating 3 feet higher than shown on drawings, pending arrival of the architect and his decision on the proposed change in the building grade. 'The necessary instructions on this subject were passed on to the grading contractor who was also informed as to the proper amount of material to be left on the premises for finished grading. Enough stripping of top soil had been done for the steam shovel to get into action, hence it and the auto trucks were already working to capacity. En route to the gravel pit, the superintendent consulted his specifications and re-read the para- graphs on the subject of aggregates: “SAND. Fine aggregate shall consist of sand having hard, durable grains, free from injuri- ous amounts of dust, lumps, soft or flaky parti- cles, shale, alkali, organic matter, loam or other deleterious substances. It shall be well graded in size up to М”.” “COARSE AGGREGATE shall consist of crushed rock or gravel having clean, hard, strong, durable particles, free from injurious amounts of soft, friable, thin, elongated or laminated pieces, alkali, organic or other deleterious matter. It shall be well graded from М” to 34" for fine concrete and from 14” to 2" for mass concrete. If gravel is used, it shall be screened to size and
Page 80
634 washed if, in the opinion of the Architect, such treatment is indicated." “Occasional pieces larger than 2" will be permitted in mass concrete, pro- vided that same are entirely embedded in wet con- crete and have no surface closer than 6" to out- side plane of the mass." *STORAGE. Sand, stone and gravel shall be deposited only on paving or suitable planking ; never on bare ground." The pit was found to be one long disused and recently re-opened, evidently for this particular work. The stripping had disclosed a good bed of gravel lying between the surface stratum and one of fine sand. Both stand and gravel appeared to be of good quality. The chief difficulty was evidently going to be the task of keeping the fine and coarser aggregates separate and at the same time free from droppings and wash from the overlying earth. 'This latter, the contractor pro- posed to effect by using hand excavating for the gravel and following with a steam shovel and a portable sifting plant that would deliver sand of proper fineness. The stripping was to be kept well back from the pit, and proper watersheds maintained to fend off storm water. The super- intendent appreciated the contractor's effort to hold down costs and expressed himself as being quite willing to cooperate wherever possible, keeping always within the intent of the contract. If pit-run gravel of suitable character could be delivered at the building site at a cost of about $1.75 a yard, and the sorted material at an addi- tional 50 cents, the contractor would be sufficiently under the local price of $4 a yard for crushed rock to have justified his gamble. The gravel would probably contain too high a percentage of sand, the which could be equalized, as he ex- plained, by the admixture of the indicated amount of coarser material. It is evident that the superintendent was going out of his way to help the contractor and equally evident that he was running the risk of making later trouble for himself by the necessity of close- ly watching the ratios of sand and gravel. It would have been much easier and safer for him to have pointed out the advisability of having a washing and grading plant installed before begin- ning to haul material from the pit, but this would have raised the cost of coarse aggregate to about that of the crushed rock. It is likely that the more cautious course would have been that adopt- ed by the majority of superintendents of expe- rience, but this man was imbued with the idea that, if he would go somewhat out of his way in the matter of coóperating with the contractor at this stage of the work, he would find himself re- paid later оп; so he tacitly approved the contrac- tors arrangements and took samples of the ARCHITECTURAL ENGINEERING AND BUSINESS Part Two sand and gravel and expressed them to the home office. The two then drove to a brickyard to inspect common brick and partition tile for which con- tract had been made, subject to approval. They found three grades of each, separately piled,— “kiln-runs,” “selects” and “culls.” Another grade, termed "standards," was not shown. In this grade, only the very poorest and softest had been culled out. The superintendent was told that the material used by local contractors was generally “kiln-run,” but that it was then being culled to comply with his strict specifications. The super- intendent gave provisional approval of the selects but cautioned the contractor that such approval was made conditional by this paragraph of the specifications : ““APPROVAL’ AND ‘ACCEPTANCE’ in these specifications, unless otherwise stated, mean approval and acceptance by the Architect ; but no acceptance by the Architect shall bind the Owner in case of proven defective work or other clear violation of the contract; nor will approval of material or equipment before same is brought on the premises be held to constitute acceptance, in case such items are found not to comply with specification.” Three samples showing the range of select com- mon brick were also sent to the express office. The next stop was at the lumber yard, merely, as the contractor explained, “to get acquainted.” The fact that the lumber dealer was also a member of the board of education appeared to embarrass him not at all as a purveyor of materials to the school building. Both he and the contractor showed con- siderable surprise, however, when the superin- tendent expressed a desire to see the stock of No. 1 white pine lath. They thought he was looking a long way ahead. This was admitted, and the stock of various grades of lath inspected. The best grade showed signs of having been on hand a long time, which was explained by there being but little call for it, contractors generally saving the few dollars per thousand difference in price by ordering the cheaper grades (perhaps claiming that the No. 1 grade was not to be had). The superintendent suggested that such extremity be avoided on the school work by ordering well in advance, which the contractor agreed to do, re- ceiving a further hint to the effect that this archi- tect considered metal lath to be the only adequate substitute for No. 1 white pine. Inspection of wood lath is always a matter for the close scrutiny of the superintendent, when they are called for. No. 1 white pine lath are generally specified by architects where wood lath are indicated, because of the impression that no other wood can back a good plaster surface quite
Page 81
April, 1929 so well. Obviously, this grade is only carried in yards where the demand warrants buying full car lots, or where possible, part loads of “mixed” cars. Contractors and supply dealers will seem- ingly exert themselves more to substitute some- thing else for these lath than to effect any other evasion of a given contract. Usually the lath is not delivered until the lathers are on hand to ap- ply it, and the inspector must then either compro- mise or delay the work. Непсе our introduction of the subject thus early in the procedure. Many instances could be cited to indicate how far contractors and dealers will go in their en- deavors to evade the exactions of a No. 1 white pine lath specification. In one such case, a young clerk-of-the-works was induced to pass a carload of other lath because the No. 1 white pine “was not to be had in that market." But that market happened to be in the Black Hills, where such lath are a local product, hence the members of the building committee were up in arms when they saw the lath from outside being unloaded, and wired the architect to set the matter right. This he did by dismissing the superintendent and tak- ing advantage of the specification clause which permitted the owner to refuse "accepted" material that was manifestly not up to requirements. Another instance was that of a bank building being constructed under a “cost-plus” contract. The builder had purchased his lath as part of his lumber bill from a dealer who happened to be a director in the bank. Three months later, when ready for the lath (this was in 1920, when prices were advancing by leaps and bounds), the builder was informed that he would have to use a cheaper grade, as the No. 1 were not to be had for less than $18 per M. To this the builder demurred as he had bought them for $8.50 per M. But the dealer naively contended that he could not be ex- pected to store them indefinitely at the price quoted. So the builder offered to pay storage, but found that the dealer had sold the lath to others at a fat second profit. Later, in the absence of the builder, the dealer told the other directors about the dilemma, omitting to mention that the lath had really been ordered and sold at the lower price. He insisted that he would not cut his prices to favor an “outsider” but, to accommodate his bank, would deliver the lath for $15 per M., if the order were signed then and there, ahead of an- other threatened rise, which was done. The dealer said nothing further of the matter until the time of final reckoning, when it amused him to divulge the particulars of the deal. It developed on the school project with which we are dealing that our forehanded superinten- dent “started something." An immense amount of gossip anent an outstanding construction opera- THE ARCHITECTURAL FORUM 635 tion in a small place circulates continually during its progress. It is malicious, disinterested or merely critical—according to the animus ог in- terest of the vender,—but seldom helpful. Неге we may record an accidental exception. The archi- tect had specified tile partitions in the basement and tile or gypsum block (at contractor's option) above the basement, except for certain minor par- titions, for which metal-lath-and-plaster, 2 inches thick, was called for. The architect's instructions from the board were to produce a building of the requisite size and appointments, as nearly fire- proof as the appropriation would permit. But, as is not unusual, it developed that the require- ments far outran the limits of the appropriation; hence, in order to reconcile the two, he had asked the bidders for three major alternatives : l. The saving to be affected by substituting light-weight steel beams or trussed-metal joists for flat-tile-arch-and-concrete-joist floor con- struction. 2. The saving to be made by substituting wood rafters and sheathing on steel framing for the concrete roof construction. 3. The having to be made by substituting wood lath and studding for tile-and-metal-lath parti- tions throughout the building above basement. The contract had been awarded on the basis of all three savings, except that trussed-metal-joist construction was adopted only for the second and third floors, and not for the first. However, so much criticism was suddenly aroused because of the idea that a building originally intended to be approximately fireproof was falling too far short of the intent if stud partitions were used, that the board members hastily decided to recon- sider the third alternative. Непсе this subject, and also the question of raising the grade at the building, were made causes of the calling of a spe- cial meeting of the board on the afternoon of the day of the architect's visit. The first work day under the schedule found the job well organized. Trees and walks had been duly protected; scrapers were busily piling the top soil; the steam shovel and its covey of motor- driven dump carts were in systematic action; carpenters were completing the cement shed and starting the office building; and the photographer was on hand to take the first photograph. Inas- much as 12 of these were included in the con- tract, it was assumed that only one exposure per month was expected, and therefore the viewpoint was carefully chosen by the superintendent to af- ford maximum information regarding the activi- ties in progress at each period. The superinten- dent also intended to make use, from time to time, of his own small camera for such snapshots as would serve to record particular conditions and
Page 82
636 illustrate the points discussed in his daily reports. The end of the first week recorded five and one half work days of excellent progress. Stripping of top soil had been completed, and the excavating was well under way. A concrete plant was being installed at the upper end of the site, and the carload of cement had been stacked in the nearby shed, which was being covered with 1-ply, hard- surfaced roofing felt. The office building was being similarly completed, and a shed was being erected forthe shelter of workmen andtheir tools ; a fourth shed had been decided upon by the con- tractor, for the use of subcontractors, in prefer- ence to permitting them to share the space in his tool shed. Another crew of carpenters was con- structing forms of a standard size for use in building the basement walls. Two crews of line- men were running wires for telephone and electric supply. The water main had been tapped, and a 34-inch supply was being run on top of the ground to a point near the concrete plant. Several loads of pit-run gravel had been dumped on the paving above the concrete plant, and the delivery of this material was going forward rapidly, but no sand or graded coarse aggregate had come from the pit. A carload of reinforcing bars had been un- loaded in the space assigned for their sorting and storage. Saturday, weather being fair, the excavating machine and dump trucks continued in operation throughout the afternoon, the other trades “knocking off" at noon. When the shovel reached the level where the contractor had been told to stop, 3 feet above that orginially intended, the shovel man advanced the claim that he would lose money if his machine could not work continuous- ly. This the superintendent admitted, but pointed out that he was merely working overtime to his own advantage, and that the status of the work at Saturday noon was supposed to be identical with that at the beginning of work on Monday morning, when the architect would be on hand to render a decision. The shovel man thereupon con- tinued as directed without further argument, ad- mitting that the remaining three hours would not make much difference. Before leaving the site that night, the super- intendent saw to it that a small diverting trench for storm water was dug in the sod above the ex- cavation. Не also inspected the cement shed and found that the carpenters had left without com- pleting the waterproof covering. In spite of the fine weather, he insisted that the covering be com- pleted. 'This was attended to personally by the general foreman and carpenter foreman. It was well that they did, for a severe storm of rain and wind occurred on Sunday and continued through- ARCHITECTURAL ENGINEERING AND BUSINESS Part Two ` out the night and until Monday noon. On Sun- day afternoon the architect was advised by tele- phone to defer his visit until Tuesday, which he did. Meanwhile, stock was taken of the damage done at the site. Fortunately, it was not serious. The cement shed proved tight, but the diverting ditch had been insufficient for the purpose, and the excavation was a sad mudhole. А controversy arose between the general foreman (his employer being absent) and the excavating contractor as to who should provide a power pump. The excavator claimed he had figured only on excavating,—was not in the pumping business. The foreman con- tended that the subcontract had been awarded for the excavating as specified, to which the other re- joined that he had bid “оп the plans" and hadn't seen the specifications. Both parties had already learned to respect the judgment of the superintendent, but he insisted that it "wasn't his funeral" and referred them to the specification clause directly applicable: "SPECIFICATION DIVISIONS. For con- venience of reference, this specification is di- vided into various headings and subheadings, but such divisions do not make the Owner or Architect responsible for the limitations of the contract of any subcontractor, each of which contracts shall be dependent upon its own definite confines, regardless of specification divi- sions." Many metropolitan architects omit this clause from their specifications and insist that their di- visions do govern the limitations of a contractor's understandings with his “subs,” but it is a custom full of inconsistencies and fraught with much danger. In this case, it would have made an issue out of a matter which was merely a cause of argu- ment. To settle it, the superintendent cited the two paragraphs in the specifications applicable. Under “Supplementary General Conditions," he found: "STORM WATER and water from springs and pipe leaks shall not be allowed to stand in the excavations or basement or other parts of the building, but shall be adequately guarded against by ditching, draining, pumping or other approved means." And, under “Excavating” : “PUMPING. All parts of the excavations shall be kept free from standing water from any source (as specified under Supplementary Gen- eral Conditions), for which purpose the Con- tractor shall provide hand or power pumps of needed capacity until drainage connection to sewer is made available.” (To be continued in the May, 1920 issue of THE ARCHITECTURAL Forum.)
Page 83
April, 1929 THE ARCHITECTURAL FORUM It’s che WATER SUPPLY that writes the Specifications EPENDING on their sources and the treat- ment they undergo, waters vary greatly in their effect on plumbing pipes. Some waters are but normally corrosive while other waters — even those which are purest for drinking — are highly corrosive, and very destructive to pipe. In writing water pipe specifications, therefore, the character of the local water supply should be carefully considered. Brass pipe will outlast rustable pipe under 2// water conditions, but not all alloys of brass will give the same satisfactory service everywhere. То meet all different water conditions, The American Brass Company offers /wo alloys of Anaconda Brass Pipe. For normally corrosive waters — Anaconda 67 Brass Pipe. This pipe contains not less than 67% copper. It is guaranteed to be structurally sound and physically perfect. It is semi-annealed and seamless. For highly corrosive waters—Anaconda 85 Red- Brass Pipe. This pipe contains not less than 85% copper, and is offered as the best corrosion-resisting pipe obtainable. It, too, is fully guaranteed. Proved by 16 years of testing! These two alloys will serve all water conditions. This has been proven in 16 years of exhaustive re- search—when various alloys of brass pipe were tested, to determine which alloys would best resist various degrees of corrosion. The laboratory tests were then checked with tests of actual use—and Anaconda 67 Brass Pipe and 85 Red-Brass Pipe is the result. An important service to architects Today, the Technical Department of The Ameri- can Brass Company is prepared to help determine the character of the local water supply and recom- mend the best alloy of pipe for use under specific conditions. You are cordially invited to com- municate with The American Brass Company, General Offices, Waterbury, Conn. FOR HOT AND COLD WATER LINES 147 ANACONDA BRASS PIPE
Page 84
148 ARCHITECTURAL ENGINEERING AND BUSINESS Part Two — MARKS that CERTIFY — assurance of dependable_ CHROMIUM PLATING N the sense that STERLING typifies I solid silver, so CRODON assures solid dependability in Chromium plate. There are very logical reasons why Architects should be familiar with the CRODON mark . . . what it means ... What it assures . . . why it warrants their good will: Chromium plating is an art. It has very distinct standards of quality. Uni- formly successful application is a definite goal. . . on this, the usefulness and dependability of the finished product is proved . . . its value judged. This is what CRODON means: It means the sum-total of long years of intensive pioneering and research work by the Chromium Corporation of Amer- ica. It means Chromium plate at the fullest stage of its development . . . ap- plied according to the most rigid spect- fications. . . It means that final results are definitely known. CRODON is the mark of the practical —the seal of achievement. . . It is your assurance of satisfaction. Manufacturers of fixtures and fittings who are licensed to use the CRODON Process of Chromium plating and toattach the CRODON tag to their products, are peculiarly representative of the country’s most noteworthy designers and producers. A complete list of these licensees will be gladly sent to you on request by our Service Department. XCROIDON TRADE MARK REG. U. S. PAT. OFF. THE CHROME PLATE Chromium Corporation of America, 120 Broadway, New York City Branch Offices and Plants: 4645 W. Chicago Ave., Chicago, Ш. — 114 Sansome St., San Francisco — 3125 Perkins Ave., Cleveland, О. — Waterbury, Cona.
Page 85
April, 1929 THE ARCHITECTURAL FORUM 149 FAUCETS ARE THE VITAL SPOTS OF PLUMBING Let MUELLER Bronze ШИГ: е 99 guard the “vital spots EAUTIFUL as the modern bathroom in color is—one danger still lurks, waiting to pounce on the unwary. Unless this same perfection of design and workmanship is matched in the quality of the plumbing fittings—all this other skill and artistry has been wasted. Mueller plumbing appurtenances in everlasting bronze give lasting, dependable service for the “vital spots.” MUELLER CO. (Established 1857), Decatur, Illinois. Branches: New York, 135th St. and Walnut Ave., Bronx; Dallas, San Fran- cisco, Los Angeles. Canadian Factory: MUELLER, Limited, Sarnia. MUELLER PLUMBING BRONZE AND VITREOUS WARE
Page 86
150 ARCHITECTURAL ENGINEERING AND BUSINESS Part Two A Style for Every Need ...... Each with Extra-Heavy Bowl .. The Simple Madden Valve... . And Clow Sure-Scouring Action HERE are more than 48 styles and sizes of Clow Madden Automatics. No other closet approaches them for completeness. АП Clow Madden Automatics carry the extra heavy Adamantose bowl—weishing as high as 60 pounds— far heavier and stronger than the average. More- over, this twice-fired Adamantose ware absorbs no stains, shows no cracks or checks. The heart of any closet is the valve. The Madden Valve has no weights or contraptions. It can't forget to flush. When the seat is down the closed top tank fills — when the seat raises with the user— the Mad- den Valve lets loose a cleansing flood of water. And, because of the well-designed bowl interior, every part from rim to trap receives an equally high pressure flush. Clow Madden Automatics guard health, guard costs, as no other closet can. James B. Clow & Sons, 201-299 North Talman Avenue, Chicago Lt, UL Vly, UU Y y 2% Р; С 2 И, Z 1 2, 2 GZ 222 7 Z2 2 22725 b 2 2 WG 2 2 2% Z2 Z2 Z 277 Guth УД A 7 272 Ж». Ge 222 2.2 n NS ЖА B BG gG oga P 7 Р A CAS MG 2 72 7.2 2 4 6 22742 26 2 2 Forty-Gight Styles, Heights and Types to Meet Your Requirements
Page 87
April, 1929 THE ARCHITECTURAL FORUM 151 Гаа мела NN MEETING ARCHITECTURAL STANDARDS OF QUALITY Mutual Benefit Life Insurance Company Building, Newark, N. J., John H. and Wilson C. Ely, Architects. Solid Nickel Silver” plumbing fixtures by The Meyer-Sniffen Co., New York. MODERN BUILDINGS DESERVE MODERN FIXTURES OF NICKEL SILVER EMI-INSTITUTIONAL structures such as the new Mutual to the wear-resistance of valve seats. Its permanent, silver-like S Benefit Life Insurance Company Building in Newark, N. J., lustre compares favorably with the appearance of Pure Nickel are built to endure for generations. Every detail in their con- and other high Nickel alloys. It is easy to keep clean and spot- struction must conform to the high- less even when subjected to severe use est standards of architectural qual- . The specification of Solid Nickel ity. It is significant, therefore, that Silver sanitary equipment is the logi- the builders selected Solid Nickel cal way to insure beauty, permanence Silver" plumbing fixtures manufactured by Meyer-Sniffen... and highest quality. For the most modern type buildings, Solid Nickel Silver possesses a characteristic hardness that adds plumbing fixtures of Solid Nickel Silver have no substitute. its Nickel Alloyused in manufacturing Nickel Silver plumbing fixtures. This is a solid white metal and contains a high percentage of Nickel. D Metal is the name used by The Meyer-Sniffen Co. to 4 №ске[ THE INTERNATIONAL NICKEL COMPANY, INC., 67 WALL STREET, NEW YORK, N. Y. NiekeL.
Page 88
152 ARCHITECTURAL ENGINEERING AND BUSINESS Part Two (777, ARCHITECTS daughter dictates Specification; р» couturieres started it. Women's scanty Hoffman Controlled Heat requires only a few attire brings the need for more heat in homes ounces of pressure to heat a large home, one than is comfortable for woolen-clothed men. pound to heat great buildings, even in zero weath- Isn't it time we faced this problem? er. Owners of buildings, large and small, have "Father," said the daughter of a New York kept close check-ups on fuel costs—reported architect, "when the house is warm enough for drastic savings. Mother and me, you compare it with an oven. No matter what standard boiler and radiators John opens windows. When it is cool enough for you specify, whether the boiler is to be fired by you and John, all I can do is wear a fur coat. coal, oil or gas, it is a simple matter to add the "Why can't there be a heating system that will equipment that. makes it Hoffman Controlled make an 'oven' of the drawing room, and provide Heat. This equipment places automatic controls the temperature you wish in your library and in over boiler and radiators at every necessary point John’s room? You ought to know. . . . assuring the owner amazingly safe and flexible А : operation. He did know, but had never realized how com- р pletely this modern problem is overcome by This modern system is guaranteed in writing Hoffman Controlled Heat. by a long-established, conscientious maker, to operate perfectly for years. Hoffman Specialty Hoffman Controlled Heat brings comfort to Beast Company also offers expert engineering counsel. every member of the family. It delivers to each room as much or as little heat as is required, This radical time-tested advance in heating meth- without effect on the temperature of other rooms. ods has aroused the interest of many architects. In each room, a finger touch commands the radi- We shall be glad to mail you without obligation, ator to give off full heat, three-quarters heat, half a copy of our new booklet, describing in detail heat, one-quarter heat or none at all. This system the operation of Hoffman Controlled Heat. You automatically adjusts itself to the hour-to- аге cordially invited to write for your copy. Ad- hour need for heat. Only as the call dress Hoffman Specialty Company, for heat increases does the supply of Inc., Dept. EF-4, Waterbury, Con- steam accumulate. There is no waste. necticut. You will get ic promptly. HOFEMAN wei ^L" аш
Page 89
April, 1929 THE ARCHITECTURAL FORUM 153 А Mark of Progress In Lavatory Design The Wolff Double Faucet HOME BUYER quickly recognizes the up-to-date character of bathroom equipment, if it provides facilities for washing comfortably in running water. No installation offers this advantage in more efficient form than the Wolff double faucet, shown in detail in the inset below. The fittings ate so accurately made that only a very light pressure of the fingers is necessary to move the side levers. It is easy, Y e n to make a vety fine adjustment of the hot and cold supply so as to obtain the exact mix- ture desired. The waterways are unusually large, assuring an abundant flow. Little or no explanation is needed to impress a client with the advan- tages of this installation. The discomfort of using separate hot and cold faucets alternately, one too hot and the other too cold, is an annoyance which everyone wishes to escape. Another advantage. The space usually occupied by the second faucet can be used for drinking water. Three kinds of water with only two faucets. "This installation is typical of the up-to-date character of the entire Wolff line of plumbing — . fixtures—brass, enamel and vitreous. The bath- , SE tubs, lavatories and closet bowls are made in, E a variety of attractively matched tints, 1 and the handsome brassware is excep- tionally durable, due to the unusually high percentage of copper in its analysis. The selection of Wolff lavatory trim- mings isextremely wide;threeexamples are shown below. These and all other Wolff “DURO” brass fixtures are ob- tainable Durochrome or nickel plated, as desired. BING FIXTURES WOLFF CO. » Established 1855 + General Offices: 2058 W. Fulton Street, CHICAGO « Branches and Distributors in АП Principal Cities
Page 90
154 ARCHITECTURAL ENGINEERING AND BUSINESS Part Two OU ye TEST OF Туу, Meo lee wm 4 + | wes I "HBHHHHUHE ] ае ape ARAN ee ИРЕН ОИ" ишы. NS VU. Buncombe County Court House Asheville, N. C. Milburn-Heister, Washington, D. C. Architects Sluder Bros., Asheville, N. C. Plumbers Plumbing Fixtures IHE JOHN DOUGLAS COMPANY CINCINNATI, OHIO
Page 91
April, 1929 (Colored fixtures rent ap artments ASIER rentability —that, accord- ing to accumulating evidence, is the immediate result of the in- stallation of Kohler colored fixtures in apartments. The new beauty of these fixtures stimulates spoken ad- vertising that travels fast and far. In the El Tovar apartments, De- troit, more than 90 per cent of the apartments were rented before the building was completed. Mr. Jacob P. Sumeracki, president of the Mich- igan Land & Home Corporation, the owners, gives much of the credit to the Kohler colored fixtures, which, he says, “have a strong appeal, re- sulting in quicker rentals.” ОЕ Ч KOHLER Plumbing Fixtures Moderate Extra Cost The use of these fixtures brings such a handsome advertising return that even a considerable extra cost would be more than offset. As a matter of fact, however, the added cost is very reasonable and represents only a minor addition to the cost of the complete bathroom. Kohler colored fixtures are made in patterns covering such a wide price range that they may be in- cluded in the plans for almost any apartment, hotel, or private dwell- ing. This is true of kitchens and laundriesas wellas bathrooms. Many architects are developing the kitchen Distinguished new Kohler fixtures —the paneled Mayfair bath and Bellaires vitreous china lavatory THE ARCHITECTURAL FORUM 155 EL Tovar APARTMENTS 320 E. Grand Boulevard, Detroit Kohler Colored Fixtures in bathrooms. Mich- igan Land © Home Corporation, Detroit Owners; Robert J. West, Detroit, Architect; Ciesliga Co., Detroit, Plumbers; Nelson Co., Detroit, Wholesalers as an especially attractive room by the use of Kohler sinks in color. Seven Colors and White With seven colors to choose from the architect has free scope for his creative ability. The Kohler colors are noted for their delicacy, so they lend themselves perfectly to the de- signing of rooms of taste and refine- ment. All Kohler fixtures—both vitre- ous china and enameled ware—are made in one place under admirable conditions of product-control, so the color harmony of a Kohler installa- tion is assured. Kohler brass fittings add the finishing touch of quality to such an installation. You are invited to visit a Kohler display room and study at your leisure the possibilities of this dis- tinguished ware . .. May we send you the new Kohler book offered in the coupon below? Kohler Co., Founded 1873, Kohler, Wis. Shipping Point, Sheboygan, Wis. Branches in Principal Cities Please mail this coupon to Kohler Co., Kohler, Wis., for A helpful book for the architect. Illustrated in color. Shows bathrooms, kitchens, laundries; color schemes; floor plans; prices.
Page 92
156 ARCHITECTURAL ENGINEERING AND BUSINESS Part Two Youth insurance for ү bathrooms ДД, S9 POLISH. SHINE. RUB . And the more elbow- grease goes into keeping ordinary bathroom fixtures shiny, the sooner they go into a decline and begin to show their age. Not so with the brilliantly beautiful new Speakman fixtures in chromium plate. The finish never wears through. They need abso- lutely no polishing. They never tarnish. They will be just as young and brilliant in 1939 as they are today. Home owners can be proud of the beauty they give their bathrooms for a long lifetime. May we suggest that you look into the virtues of the Speakman Artline family — for showers, lavatories, bathtubs and kitchen sinks? They have been called the most beautiful fixtures made today. They are a triumph of graceful design, delicate yet rugged construction, and admirable artistry. SPEAKMAN COMPANY Wilmington, Del. SPEAKMAN SHOWERS & FIXTURES
Page 93
April, 1929 THE ARCHITECTURAL FORUM 157 Gentlemen of the arclutectural profession: in sand traps and plopped into water hazards. As far as we are concerned, there is just one significant thing about it—its diameter. c fe is just a golf ball. It has nestled Here we have an ordinary water closet. Every day its like go into homes and buildings by the hun- dreds. This closet will pass govern- ment health requirements. But observe what happens when the golf ball is flushed through the trapway of this water closet. Either it sticks in the trap and stops up the closet, or else it goes through with scarcely a hair's breadth to spare. Now see what happens when the golf ball is flushed through Maddock’s nation- ally known toilet, the Improved Madera. It comes through with space to spare. It could rattle around in the trapway like an Ordinary closet The Improved Madera egg in a tea cup. Is this significant?— emphatically yes! One of the most important functions of today's toilet is to dispose safely of modern sanitary pads. The toilet whose trapway is so small as to scarcely pass a golf ball is obviously unsuited for the purpose, and is almost certain to give trouble. The Improved Madera, with its power- ful, quiet flushing and oversize trapway, will dispose quickly, safely of sanitary pads. Judge for yourself whether or not this is of importance to the woman of refinement !* To this outstanding superiority, add: a long soil-proof seat with large opening, complete water coverage below seat open- ing, the finest fittings, dazzling Durock surface. Thomas Maddock's Sons Co., Trenton, N. J. *For homes or buildings in which the sanitary pad is not a problem, Maddock offers the Madbrook, with long bowl and seat, large water area. Also the dependable Maderno.
Page 94
ARCHITECTURAL ENGINEERING AND BUSINESS Part Two THE IMPERIAL BRASS MANUFACTURING COMPANY 1238 West Harrison Street Sales Representatives in All Principal Cities ART CRODON Watrous Г Flush Valve HE handsome appearance of this tasteful 1929 de- sign harmonizes admirably with the new Art Line and Colonial Style fixtures now being sold by leading manu- facturers. CHICAGO THE CUTLER MAIL CHUTE In its perfected form is the outcome of long experience, and is designed to meet the requirements of public use under Postoffice Regulation. It is simple and substantial in design and construction, dur- able in finish, and has an Architectural quality which is appreciated and much commended by Architects. Full information, details, and specifications on request. THE CUTLER MAIL CHUTE CO. GENERAL OFFICES AND FACTORY ROCHESTER, N. Y. + COLD PROOF MINERAL WOOL} “tire ркоор 7 SOUND PROOF 7 VERMIN PROOF ^ CD 5 for Year Round Protection Prospective home owners can greatly reduce the upkeep of their homes and add untold comfort by insisting that they be properly insulated. Mineral Wool, placed in the walls, floors and rafters of a building, will keep it many degrees warmer in Winter and cooler in Summer, in addition to making it thorough- ly sound proof. Its first cost is its last cost—and this is quickly offset by the saving it effects in Winter fuel. Mineral Wool is a sanitary, indestructible, entirely mineral material, easy to apply and low in cost. We will gladly send you a free sample of Mineral Wool and our illustrated booklet upon request. U. S. MINERAL WOOL CO. 280 Madison Avenue, New York Western Connection: COLUMBIA MINERAL WOOL СО. South Milwaukee, Wis.
Page 95
April, 1929 Ihe Improved QUIET SI-WEL-CLO Not Only Sanitary but Hygienic HE Si-wel-clo, like all Te-pe-co closets, has always embodied the latest advances of sanitary engineering. 'The quietness of its operation has always been an acceptable attribute of this closet de luxe. The Improved Si-wel-clo is unquestionably the greatest ad- vance in water closet construction of recent years. It is the most comfortable, hygienic, sanitary and quiet closet that has ever been devised. The decided dip in the rim elevates the front and rear of the bowl opening, minimizing the possibility of soiling. The Si-wel-clo is typical of the entire line of Te-pe-co AIL Clay Plumbing Fixtures—closets, baths, lavatories, etc.— sanitary, durable and of irreproachable distinction. Folders describing this closet combination im detail will be forwarded on request. The TRENTON POTTERIES COMPANY TRENTON, NEW JERSEY, U. S. A. National Showroom—New York City 101 Park Ave., Entrance on 41st St. Branch Offices: Boston, Philadelphia, Chicago Export Office: 115 Broad Street, New York City THE ARCHITECTURAL FORUM 159 Our Guarantee We, of The Trenton Potteries Company, make but one grade of ware—the best that we can produce— and sell it at reasonable prices. We sell no seconds or culls. Our ware is guaranteed to be equal in quality and durability to any sanitary ware made in the world, The Te-pe-co Trade Mark is found on all goods manufactured by this company and is your guarantee that you have received what you paid for.
Page 96
160 Reading tubu- lar zoods are furnished in sizes ranging from Vs," to 20" in diameter ARCHITECTURAL ENGINEERING AND BUSINESS 3 Ж 4 1 > |^ WROUGHT | |j IRON | \ 01929 Reading Iron Company __/ б THREA о Ammonia ог carbon dioxide gas, escaping from leaky joints in theater refrigeration systems, may give audiences a thrill they don't want— may start a panic that proves dis- astrous. Such conditions are unknown where Reading 5-Point Pipe is used, because the better threading of Reading Pipe means joints that stay tight permanently. Made of Genuine Puddled Wrought Iron, Reading 5-Point Pipe gives you all five of the qualities you need to insure complete dependability. It gives you these qualities in a measure not known to any other single pipe material! Properly bent, Reading 5-Point Pipe can be installed wherever you are using ordinary pipe. Genuine Puddled Wrought Iron — made by pud- dling together pure pig iron and silicious slag in the furnace—is the only wrought iron that has stood the test of time. We protect you from substitutes by placing the Reading name, date of manufacture and cut-in spiral knurl on every length of Reading 5-Point Pipe. Part Two 5 -Point Pipe Never “Gassed” An Audience READING IRON COMPANY, Reading, Pennsylvania Atlanta ^ Baltimore Cleveland NewYork Philadelphia Boston Cincinnati St. Louis Chicago New Orleans Buffalo Houston Tulsa Seattle San Francisco Detroit Pittsburgh Ft. Worth Los Angeles EADING PIPE GENUINE PUDDLED WROUGHT IRON
Page 97
April, 1929 THE ARCHITECTURAL FORUM 161 A Donald Douglass Aquatint study of the Hahnemann Hospital, Philadelphia, Pa. .~ Pettit and Ferris, New York, Architect H. Hall Marshall, New York, Consulting Engineer .^ Irwin and Leighton, Philadelphia, General Contractor ^ V.N. Welamb Co., Philadelphia, Heating Contractor ^ S. Faith & Co., Philadelphia, Plumbing Contractor. Jenkins Valves are used for the entire valve equipment of this modern hospital . . . Jenkins Bros. ~ New York > Boston j^ Philadelphia .^ Always marked with the’ Diamond Chicago . . . Jenkins Bros. Ltd. ^ Montreai ^ London. e enkins Valves SINCE 1854
Page 98
162 'The Heart of the Vapor System Use This Free Sarco Engineering Service The above reproduction of a blue print is a typical example of the service the Sarco Engi- neering Department is constantly rendering the trade. It shows an installation of the Sarco Return Trap and Vent Valve which assures a steady water line and prevents cracked boilers. This manner of connecting Vent Valve and Return Trap guarantees the ready return of water to boiler and assures proper venting of air from the system. The design of the Vent Valve prevents air from entering system while operating below atmospheric pressures. Our Engineering Department will send you a free copy of this blue print with full particulars upon request or will be glad to supply you with FREE details showing other SARCO methods of handling heating problems. Write for them today. SARCO CO., Inc. 183 Madison Ave., New York, N. Y. Cleveland Detroit Pittsburgh Boston Buffalo Chicago Peacock Bros., Ltd., Montreal тшшн!) тшш „ишин с зиннаи: |S | жишк TT (UNT Гашиш | ( | жин! CS CD жк! шшш SARCO CO., Inc. 183 Madison Ave, New York City. Without charge or obligation, please send the following: О Installation blueprint AK-151 [Booklet on Temperature C Booklet on Radiator Traps Regulators) 405-00 AK-110 Cl Booklet on Inlet Valves AK-170. Philadelphia St. Louis ARCHITECTURAL ENGINEERING AND BUSINESS ammi Com жишш S CT CP же Part Two FAMOUS USERS OF GQKEWANEEG WATER SYSTEMS DEL-MONTE MEE proof that only a Kewanee will do. Back in 1919, the California Packing Company, Merced, Cali- fornia, packers of famous Del-Monte Brand food, installed a Kewanee High Pressure System at their Mt. Eden factory. Since then two other High Pressure units have been installed in other parts of their factory. Today—all are “going fine.” From modest bungalow to large estate there is a Kewanee High Pressure System to suit every need. Over 200 models of High Pressure water supply, electric light and sewage disposal plants are made by Kewanee. Also a full line of Centrifugal Pumps and Deep Well Turbines from the small $69.50 outfit to those which fit wells from 12" to 36" in diameter. Kewanee will show you how to save dollars and trouble. Write for data. KEWANEE PRIVATE UTILITIES COMPANY 442 S. Franklin Street Kewanee, Illinois Dealer Correspondence Invited For Hot Water - Heating Systems Domestic vice Water Systems the ҸЕ | FOR BETTER HOT WATER CIRCULATION On hundreds of successful installations the HvDROLATOR has definitely proven its ability to circulate hot water at greatly in- creased speed. Overcomes practically all forms of sluggish circu- lation. Write for Bulletin 828-H showing the various uses to which architects and engineers may put this device. JANETTE MANUFACTURING COMPANY, Dept. A4 Singer Bldg. 556-58 West Monroe Street Real Estate 140 Broadway Chicago, Illinois. Trust Bldg. NEW YORK Representatives in Leading Cities PHILADELPHIA —
Page 99
April, 1929 ca Owner: The question is: How much extra can we af- ford to pay for wrought | iron pipe? Suppose we | do get double life, but | payalmost double for it, | ° what have we gained? | W^, do we bave to look at tbe installation cost rather than tbe pipe cost?” “Because freight, labor, fittings, and overhead, are all necessary elements in the cost of a pipe system. They аге not lessened by using cheap pipe. Some of them, on the contrary, may be increased. “Replacements are usually more expensive than new work. Freight, hauling, and overhead enter, just as they did in the first place. Labor often is doubled and trebled. And besides that, walls, floors and partitions may have to be torn out, and repaired after the job is finished. Carpenters, plasterers, painters, and decorators have to be reckoned with, as well as pipe fitters. “In a factory, if some of these troubles are absent, there are others equally severe. Difficulty in getting at the leaky pipes, overtime charges, interrupted operation, idle time of machines and THE ARCHITECTURAL FORUM 163 The price of wrought iron pipe may be nearly double that of cheaper pipe, but Zzs/a/led in the system, ready for service, it costs only about 5% extra, That’s the im- portant thing to look at. men, delayed production—these are common experiences. Pipe failures are extremely costly.” “But the whole system would not fail all at once!” “True, it would not go to pieces all at once, like the ‘one hoss shay’. But whether all at once, or little by little, when pipes break down they have to be replaced, and it certainly doesn’t cost any lessto doathing piecemeal thanallatone time. We are discussing, not the excep- tional utter collapse, but the usual, dis- heartening expense of continual replace- ments when short-lived pipe is used.” x ж ж ж ж ж Thorough studies have been made, cover- | ing the experience of many pipe users, in different places, through a long term of years. A Byers bulletin on the Installation Cost of Pipe gives facts and figures. Send for a copy. А. M. BYERS COMPANY Established 1864 Pittsburgh, Pa. qo umo n 36; OSEE m cocos tno шй» WC y BYERS PIPE GENUINE WROUGHT IRON
Page 100
164 ARCHITECTURAL ENGINEERING AND BUSINESS Part Two f - > 5 | NET T А = |) t P THAT ARE PLANNED FOR TRAFFIC The treads of such stairway installations must combine durability and an abrasive surface-grip with pleasing appearance and comfortable use. Those of Alberene Stone qualify with a plus rating on each of the four counts. A special quarry-selected hard stone is used. It has the workability which characterizes soap- stone, and a hardness and abrasive content which give it definite advantages. Tiles of the same character, either of regular dimension or ashlar pattern laid are admirable for hallways and landings. The Company’s new brochure, Architec- tural Alberene, has a series of illustrations which are full of practical suggestions. ALBERENE STONE COMPANY Stairway, hall and stair landings s nt Union нода] [x 153 West 23rd Street, New York City inary, New York, N. V. Branch Offices—BOSTON, CHICAGO, PHILADELPHIA, NEWARK, N. J., ALLEN N. COLLINS, “PITTSBURGH, CLEVELAND, RICHMOND Boston, Architect Quarries and Mills at Schuyler, Va. I BERENE STONE
Page 101
April, 1929 THE ARCHITECTURAL FORUM The New York Municipal Building exemplifies the art, craftsmanship, and excellent materials that went into its construction . . . Among which was rust- resisting ARMCO Ingot Iron, used in the form of Herringbone Metal Lath. Architects: McKim, Mead, and White. Design Freely... and know it will conform ITH pure ARMCO Ingot Iron as the sheet metal to be used, you can design the most com- plex motifs . . . with the satisfaction of knowing that every line can be Courtesy of The New York Edison Company 165 UITIUM faithfully reproduced. RUINA NIA RAOUL ARMCO Ingot Iron is made pure to endure. Yet from this same purity comes remarkable ductility; the ductility that enables you to trust your designs to a competent sheet metal craftsman with the assurance that they will be reproduced faithfully. From simple gutter to ornate cornice or marquise, there is a gratifying measure of beauty and protection when you speci- fy ARMCO Ingot Iron. If you have a sheet metal problem, our Development Engi- neers can tell you just what you can achieve with ARMCO Ingot Iron. Ask the office nearest you for this cooperation. There is no obligation. THE AMERICAN ROLLING MILL COMPANY Executive Offices, Middletown, Ohio Export: The ARMCO International Corporation Cable Address—ARMCO, Middletown (O.) District Offices: Chicago Detroit Pittsburgh Cincinnati New York St. Louis Cleveland Philadelphia San Francisco The First Church of Christ Scientist, Atlanta, Georgia, is a typical example of the adapta- bility of ARMCO Ingot Iron for architectural sheet metal con- struction. This pure iron ex- presses freely the artistic cornice design of Architects Robinson and Dougherty, while its durability has protected their specification for 16 years without repair or re- placement. The dome is also covered with rust-resisting ARM- CO Ingot Iron, installed in 1913.
Page 102
166 HOFFMAN MOTO-HEATERS... Hoffman Moto-Heaters are an im- proved type of unit heaters, scien- tifically designed and made in accordance with the highest engi- neering standards. Architects and heating engineers will find in Hoffman Moto-Heaters a product that insures maximum efficiency at lowest cost per B. T. U. Hoffman Moto-Heaters can be spe- cified with the assurance that they will fully measure up to rated ca- pacities and will give years of satis- HOFFMAN HEATING STEAM The addition of these two new products marks another forward step in making the Hoffman line more complete. In Hoffman Valves, Hoffman Controlled Heat Equip- ment, Hoffman Moto-Heaters and Hoffman-Economy Pumps, architects and heating engineers are now offered a reliable line of heating specialties for residences and all types of commercial and industrial buildings. The selection of complete Hoffman equipment simplifies specifications, insures complete engineering counsel and avoids ALL TYPES OF divided responsibility. ARCHITECTURAL ENGINEERING AND BUSINESS Part Two HOFFMAN SPEC ANNO TWO NEW factory service without leakage or other mechanical troubles. Made in both suspended and floor mounted styles, in a complete range of sizes for all industrial and com- mercial heating requirements. Every heater tested at 1,000 pounds hydrostatic pressure and guaranteed for 200 pounds operat- ing pressure. Furnished with Super- Fin heating surface. Copper tubes are united to header by fusion of metal, to prevent danger of leakage. SPECIALTIES FOR INSTALLATIONS
Page 103
April, 1929 THE ARCHITECTURAL FORUM 167 IALTY COMPANY UNCES PRODUCTS HOFFMAN-ECONOMY PUMPS.. Condensation Pumps — Compactly designed and sturdily constructed, Hoffman-Economy Condensation Pumps meet every requirement of efficiency and dependability. Mounted on heavy cast iron base and driven by a powerful motor of standard make and size. Removable cover gives access to all working parts without breaking pipe con- nections. Vacuum Pumps — The Hoffman- Economy Vacuum Pump is a highly Send Coupon for New Catalogues Catalogues and engineer- ing data on Hoffman Moto-Heaters and Hoff- man-Economy Pumps will gladly be sent upon request. Fill out attached coupon and mail today. Майте. SELES „аньыы efficient and reliable unit for the rapid removal of air and condensate from heating systems. Vacuum producer is of the jet type—the simplest and best known method. No close clearances on pump; no danger of water overflow- ing to floor in event of electrical failure. Pump operates efficiently even in handling very hot water, and can "pull" high vacuum. There is a Hoffman- Economy Pump for every type of heating job. HOFFMAN SPECIALTY COMPANY, INC. Dept. EFI3, Waterbury, Conn. Please send catalogue on Hoffman Moto-Heaters Hoffman-Economy Pumps
Page 104
ARCHITECTURAL ENGINEERING AND BUSINESS Part ‘Two | destructive to property and dangerous to life, are handled in acid-proof Duriron fans | as safely as - pure air is in ' fans of other - materials. 4 "Protect "Buildings Against this Costly EVIL UST and soot exact enormous tolls from the owners of buildings not protected against this evil. For unfiltered city air contains an average of 100,000 particles of dust per cubic inch. | To clean, repaint and put on new paper and replace goods | | ruined by dust, adds a few thousand dollars yearly to the | | operating expense of most large buildings. Moreover, the disease germs carried by unfiltered air are a constant menace to health. The Protectomotor keeps dust and soot out of buildings. It delivers air that is 99 9-10% CLEAN. This Panel Air Filter for = Idings is constructed on the same principle as the Protectomotor used on more than 250,000 automobiles, air-compressors, engines, etc. The Protectomotor is the only air filter approved by the U. S. | | War Dept. | It operates from two to six months without cleaning, and | | can be cleaned in a half minute per panel with our special vacuum cleaner. 'The initial cost is low E [| Rochester, N. Y. В RO TECTO 0 OR nil. No oil drains or Perfect Positive Protection PANEL AIR FILTER Duriron fans | exhaust efficiently fumes from ' chemical labor- - atories and corrosive _ processes in апу volume up - to 5000 cubic feet per minute. - Bulletin No. 140-B - (A. I. A. File No. ) 3O0dl) should ! be in your files. - Write for it. quired. Write for our Catalog. STAYNEW FILTER CORP. THE DURIRON COMPANY, DAYTON, OHIO
Page 105
April, 1929 HE world-wide rep- utation of the Battle Creek Sanitarium is at the same time a benefit and an obligation. Itisa benefit because it draws patients from the four quarters of the globe.Itisan obligation because an institution with such a reputation must employ only the ATTLE CRE Another Monel Metal Installation THE ARCHITECTURAL FORUM XE IP Я d a" zu Modern as tomorrow Photograph above at left shows Service Kitch- en, Battle Creek Sanitarium, with Monel Metal refrigerator counter, service table, cube ice bin, tray tables, roll warmers and plate warmers mfd. and installed by Duparquet, Huot & Moneuse Company, Chicago. Photo- graph at right shows one of the diet kitchens in the Battle Creek Sanitarium—Monel Metal equipped — equipment mfd. and installed by The John Van Range Co. The following companies furnished Monel Metal equipment for the Battle Creek Sanitarium: COLT’S PATENT FIRE-ARMS MFG. CO. Hartford, Conn. DETROIT-MICHIGAN STOVE CO. Detroit, Mich. DUPARQUET, HUOT & MONEUSE CO. Chicago, Ill. EDISON ELECTRIC APPLIANCE CO. Chicago, Ill. D. A. MATOT СО., Chicago, Ill. THE JOHN VAN RANGE CO. Cincinnati, Chicago, Detroit, New York Sanita the endorsement of hospital executives be- cause it offers a com- bination of properties available in no other material—it is rust- proof, corrosion-re- sisting, durable. It has no coating to chip, crack or wear off. Its beautiful, silvery lustre is permanent. rium THEINTERNATIONAL NICKEL COMPANY, INC. finest and most modern equipment. It is natural, therefore, that the major de- partments of the Battle Creek Sanitarium should be Monel Metal equipped. Monel Metal is the preferred material among MODERN hospitals. It has received In advising hospitals regarding their equipment requirements, you are abso- lutely safe in recommending Monel Metal. Its dependable high quality has been demonstrated by its many years of eco- nomical service in well-known institutions. SEND FOR ARCHITECTURAL FOLDERS ON HOSPITALS See our exhibit at the' Architectural and Allied Arts Exposition, Grand Central Palace, New York City, April 15th to 27th, ETAL 169 67 WALL STREET, NEW YORK N. Y.
Page 106
170 ARCHITECTURAL ENGINEERING AND BUSINESS Part Two Insured Forever WEIL PUMPS A COMPLETE LINE for every building requirement Against Cracks Spalls or Breaks Weil Type “А” Ball Bear- ing, Single Stage, Double Suction, Horizontally Split Case Pump. Fully bronze fitted. Secure Bulletin A- 1800. | JOINT Patented Sept. 1,1925 Facades of height, plain . orornamented, need pos- itive insurance against cracks or spalls. The COWING PRES- SURE RELIEVING JOINT is giving such protection to many world famous buildings. Weil 'Tujur" Horizontal Condensation Pump — a “bear” for service—reason- able in cost. Secure Bul- letin TR-100. at an a БЛА ЖАШ 8 OT This neat and eternal * joint zones a building | into story heights. It de- livers exact and auto- matic compensation for all destructive stresses ; thrown on the facing |, material by temperature ; changes, compression of i| steel and imposed loads. It saves the mortar | joints and eliminates fre- Weil Automatic Bilge Pump—heavy duty type— unmatched for durable ser- vice. Secure Bulletin B- 700. Weil Automatic Duplex Non-Clog Sewage Ejectors (screenless). Latest and most efficient ejector made. Secure Bulletin CN-900. ' quent tuck pointing—it will not squeeze out—it lasts as long as the || building. r 3 3i E 3 3 EE 3: Er E ER 3i Write for our illustrated booklet. Weil Type “NRG” Ver- tical Condensation Pump and Receiver. Compact and efficient. Secure Bul- letin NRG-200. Weil Type “EM” Multi- Stage Pump—opposed suc- tion eliminates end thrust. Ball bearing—greater effi- ciency—lower maintenance cost. Secure Bulletin E- 1900. eC WELL PUMP COMPANY Herbert Hugh Riddle, Architect BIGE” SEWAGE кыы НАНА р Lieb d Hein, Engi IRE- ieberman and Hein, Engineers CIRCULATING VACUUM Cowing Pressure Relieving Joint Co. SSS eee SSS is N.WelsSt. - ving J 1ü Manufacturers of Better Centrifugal Pumps à à 50, 4H | 215-17 W. SUPERIOR ST., CHICAGO PHONE: SUPERIOR. 9815
Page 107
April, 1929 THE ARCHITECTURAL FORUM 171 A ; , „Ж . AR | Г. has been said that in many instances, "An institution is but the lengthened shadow of one man". So with today's building wonders . . . they are shadows of great men’s ideals . . . shadows of the асе... today's аре... a combination of beauty and efficiency. Famed architects and engineers, fully anticipating future needs . .. plan to the most minute detail the mechanical parts, blending the practical with their ideals of beauty and efficient design. Thus, each part of the equipment of today's structure, each part of the shadow, is a reflection of masters of their craft. Specifications are rigid . . . inspections are critical . . . materials are selected for worth, for reputation, for dependability. The American Insurance Union Citadel, Columbus, Ohio, pictured AMERICAN INSURANCE UNION CITADEL above, joins the shadows of the age—fully prepared to meet the Coruamus, Онто service demands of many years to come. ei yes y^ iN m des When the tubular material was decided upon for this fine structure, 14 еу: ау . пае, etrol ä . . — ананар (Gars the specification for the major pipe tonnage read "^NATIONAL"— John Gill & Sons Co., Cleveland America’s Standard Wrought Pipe Plumbing & Heating Contractors: н И Hoffman Wolfe Company, Columbus (Butt-weld sizes 15 to 3-inch, made Scale Free) ATIONAL TUBE COMPANY - Pittsburgh, Ра. Subsidiary оў United States Steel Corporation
Page 108
172 ARCHITECTURAL ENGINE PERMANENCE IN PUBLIC BUILDINGS The average building is a municipal monument. It is constructed to serve several generations. Materials very properly are chosen with an eye to permanence as well as beauty. It is significant that many important public structures contain United Hollow Metal Doors and Trim. The Civil Courts Building, of St. Louis is a recent case in point. Not only will the efficient United Elevator Enclosures in the building be serving faithfully a gen- eration from now, but their beauty will be unmarred by time. Should fire ever come, they will protect the shaft openings against its spread. Write for complete in- formation on United Hollow Metal construc- tion. It is comprehen- sive and complete. UNITED METAL DOORS AND THE UNITED METAL PRODUCTS CO. CANTON, OHIO OFFICES IN ALL PRINCIPAL CITIES "Hotel Planning ERING AND BUSINESS Civil Courts Building, St. uis Architect: Plaza Commission, inc. Contr: : Selden-Breck Construction Со. Elevator Enclosures and Eleva- tor у Doors of United Metal Construction. va b and Outfitting” EDITED BY C. STANLEY TAYLOR and VINCENT R. BLISS Here is a volume which for the first time ade- quately reviews the entire subject of the modern hotel, —its planning, designing, equipping, dec- orating and furnishing. It covers every detail, from the beginning of sketch plans to the registration of guests when the house has been completed and opened. АП the different types of hotels are dealt with,—the Modern Commercial Hotel, the Residential or Apart- ment Hotel, the Resort Hotel, and the Bach- elor Hotel. The volume is replete with views of hotels in different parts of the country; their exteriors and interiors, and in many instances their plans are included and fully analyzed. 438 pages, 8% x 11и NATIONAL TRADE 521 Fifth Avenue, New York The editors have been assisted in the preparation of the work by widely known hotel architects and interior decorators and by actual operators of hotels,—practical men, experienced in the management of the “back” as well as the “front” of a hotel. The volume's treatment of hotel furnishing and equipping constitutes the final word on this important subject. There are included views of hotel restaurants, cafeterias, kitchens, pantries, "serving pantries,” refriger- ating plants and all the departments which are necessary in a modern hotel of any type. The work is of inestimable value to architects, builders and engineers, as well as to practical hotel men. inches— Price $10 JOURNALS, INC. Part Two
Page 109
THE ARCHITECTURAL FORUM No. 55 of a series of advertisements featuring prominent laundry installations The Laundry Problem simplified HE experience of The American Laundry Machinery Company covers laundry installations in practically every type of building. For, nowadays, the in- stitutional laundry, as you know, is a planned-from-the-start department — in hospitals, hotels, clubs and apartment structures, even factories. When it comes to any kind of laundry problem—commercial or institutional— ... by this SPECIALIZED cooperation you will find “American” counsel valu- able. Take, for example, the laundry at Beth Israel Hospital Location, floor space, power requirements, troughings for the washers, weight of the equipment were problems which “American” special- ists helped to work out. The services of these engineers are at your disposal—a letter will bring one of them to your office. THE AMERICAN LAUNDRY MACHINERY COMPANY Norwood Station, CINCINNATI, OHIO The Canadian Laundry Machinery Co., Ltd., 47-93 Sterling Road, Toronto 3, Ont., Canada. Agents: British-American Laundry Machinery Co., Ltd., Underhill St, Camden Town, London, N. W. 1, England. The modern laundry department at Beth Israel Hospital, Newark, N. J., planned and installed with the col- laboration of American Laundry Machinery Company engineers. STARRETT BROTHERS, 292 Madison Avenue, New York City—Builders.
Page 110
174 ARCHITECTURAL ENGINEERING AND BUSINESS Part Two 1 iJ Theenviable standing which Kitchen Maid Units enjoy with the architects of America is only a natural result of a manufac- turer's ceaseless aim to keep in step with trends in architectural thought and practice. "mi ann TRR mom om GO 1, "AT oe Wasmuth-Endicott Co.,1808 Snowden St., Andrews, Ind. If in Canada, address Branch Office, Waterloo, Ontario А, “Let the Kitchen Maid ES be your Kitchen Aid’? aui bo ў # 22 Story Pfaudler Glass- Lined Chute is acme of efficiency to Piccadilly Hotel NOTHER of New York's new hotels now enjoys the advantages of a Pfaudler Glass-Lined Steel Laundry Chute. The Piccadilly Hotel, appreciating the effi- ciency of the axiom, “һе shortest distance between two points is a - — straight line," finds a - practical application in пт Р the form of this chute. | @ h Besides, Pfaudler makes the only genuine glass- lined chute on the market "UE durable, sanitary, fireproof and corrosion proof. May we send you full particulars? THE PFAUDLER CO. Rochester, New York NEW YORK CHICAGO 8 West 40th Street 1442 Conway Building ELYRIA, O. SAN FRANCISCO Pfaudler-Elyria Div. 122 New Montgomery St.
Page 111
April, 1929 THE ARCHITECTURAL FORUM 175 NEW YORK EDISON BUILDINGS "mia A K | et у: МУМУ NAN. ALA HE New York Edison Company has had 21 Barrett Specification Roofs applied on its buildings since January 1, 1921. Edison Company engineers demand roofs that will not leak, burn, crack or rot. The few cents more per square foot, be- tween the Barrett Specification and ordinary roofs, doesn’t enter into their consideration. "Trouble-free, expense-free service is their objec- tive...their method of economizing. Engineers and architects know that Barrett Specification Roofs of Coal-tar Pitch and Felt, surfaced Barrett Specification Roofs are constructed of alternate lay- ers of prime quality tarred felt and the finest coal-tar pitch, armored and fire-safed with sarface-imbedded gravel, slag or tile. They are laid by Barrett Approved Roofers according to the Barrett Specification and bonded by Barrett against re- pair or maintenance expense. Hell Gate Station, erected 1922, Thomas E. Murray, Inc., New York City, engineers and architects. Cov- ered with Barrett Specification Coal-tar Pitch and Felt and surfaced with tile, T. New Construction Co., New York City, Roofer. with gravel, slag or tile, and bonded for 20 years* against repair or main- tenance expense, far outlive even the liberal provisions of the bond. Ten-, twenty-, thirty-, forty-, fifty- year performance sets forth the value of Barrett Roofs. A roof that comes through decades of withering e e Inspected and under Barrett Specification Roofs summer heat, decades of blighting winter cold, unscathed, proves itself. What more could be demanded of апу roof? Coal-tar pitch literally thrives on that element which nature uses so destructively on ordinary roofs. Water is actually a pitch preservative! Misuse may injure the surface—but self-healing properties of pitch mend it automatically. The surface- imbedded gravel, slag or tile pro- vides a practically imperishable wearing surface that defies fire, time and tempest. Fifty-year repair-free service rec- ords are a common occurrence with Barrett Coal-tar Pitch, Felt and Gravel Roofs. “Таг and gravel" roof protection . . . by Barrett . . . was standard practice when the four- story "red brick" enjoyed its first fling in commercial building fashion. And it is standard practice today. Architects, engineers and builders turn consistently to the Barrett Spe- cification Roof. Not merely because they know of these records, know of the high character of Barrett Ap- proved Roofers and of Barrett's “оп- the-spot" inspection service—or yet, entirely, because the Barrett Speci- fication Roof carries a Surety Bond. But because the Barrett Specification Roof keeps the owner totally free of annoyance and interruption to busi- ness. And that’s sound business! Let us put you in touch with the Barrett Approved Roofer located in your City. *The Barrett Company also offers a Specifica- tion Type "A" Roof which is bonded for 10 years. This type of roof is adaptable to a cer- tain class of buildings. The same high-grade materials are used, the only difference being in the quantities. e Bonded by Barrett THE BARRETT COMPANY, 40 Rector St., New York ~ In Canada ~ THE BARRETT COMPANY, Ltd., 5551 St. Hubert St., Montreal, P. Q.
Page 112
176 ARCHITECTURAL ENGINEERING AND BUSINESS Part Two 'ALUABLE MANUAL on. Modern Concrete Reinforcement now ready for Distribution —- тте. | “А practical manual for archi- tects and builders on concrete reinforcement and economical methods and materials for placing,supporting,spacingand holding reinforcement in concrete structures; including notes on specifications and in- spection methods." A ч м A. few of the subjects covered: Correct Placement of Steel Re- inforcement... "v м Б | Economies possible Through | Correct Field Practice... <4 < ч Supporting, Spacing and Hold- | ing Devices... | ы. м Ы" Practical considerations gov- erning Placing and Protection of Steel in the Concrete Mass... [icc This new manual of 32 fully illustrated pages, plus two *Standard Practice" folders of eight pages each, brings up-to-date and makes available in one place a vast amount of ac- curate, practical information on reinforcing. It simplifies and makes clear the entire sub- ject. Without question it deserves — and will receive — a prominent place in the offices of architects,engineers,contractors and builders. Copies of this valuable manual will be gladly sent to responsible firms and individuals without cost. Use the coupon below, or send special request to the Concrete Steel Com- pany, 42 Broadway, New York. Concrete Steel Co. Executive Offices: 42 Broadway, New York District Offices — Birmingham, Boston, Chicago, Detroit, Minneapolis, Philadelphia, Pittsburgh, St. Paul, Syracuse, Washington, Youngstown CONCRETE STEEL CO., 42 Broadway, New York SEMEN Gentlemen: Please send me, without obligation, a copy of your new Manual on Concrete Reinforcement.
Page 113
April, 1929 1; lakes a WHALE of a seat THE ARCHITECTURAL FORUM 191 lo stand public toilet abuse / There is absolutely only one way to guard against the vandalism of the public. Install seats of such super- strength construction, that the worst treatment in the world cannot smash them. Whale-bone-ite is such a seat. Though it costs no more than the cheapest composition closet seat made, its unbreakable construction — guaranteed for the life of the building —immediately ends all replacement expense. Its handsome polished Whale-bone-ite surface will last a life-time. It is easy to clean and non-inflammable. Its hinge also is covered with Whale-bone-ite, giving it the same strong, polished surface as the seat, and making it non-corrosive. The use of Whale-bone-ite Seats is spreading to the guest bathrooms of fine hotels. Many new apartment houses are equipping all toilets with it. Send for free cross-section —see its strength yourself Figures show that on the average ordinary seats have to be replaced about every three years. If you want to end this needless expense, just as it already has been ended in more than a million public toilets in modern and remodelled buildings, simply install Whale-bone- ite Seats as fast as other seats wear out. Not only will the replacement expense end, but the toilets will be cleaner as Whale-bone-ite is easier to keep clean. With- out obligation send for a free Whale-bone-ite cross- section. Simply address Dept. А-2, Seat Division, The Brunswick-Balke-Collender Co., 623 South Wab- ash Avenue, Chicago. THE BRUNSWICK-BALKE-COLLENDER CO. , Chicago Atlanta Chicago Detroit Memphis New York Seattle Birmingham Cincinnati El Paso Minneapolis Philadelphia St. Louis Boston Cleveland Harrisburg Nashville Pittsburgh Tampa Buffalo Dallas Houston Newark Richmond Washington Charlotte Denver Kansas City New Haven San Antonio Montreal Chattanooga Des MoinesLos Angeles New OrleansSan Francisco Ottawa Toronto Havana RUNSWICK/ WHALE-BONE-ITE TOILET SEATS THE WHALE-BONE-ITE Seat and Hinge form an unbreakable unit. The seat is molded around a laminated core of alternating-grain layers of hardwood, making it proof against warping, cracking and splitting. The die-cast hinge is molded integral with the seat.
Page 114
192 SELECTED LIST OF MANUFACTURERS' ROOFING The Barrett Company, 40 Rector St., New York City. Architects! and Engineers' Built- -up Roofing Reference Series; Volume IV Roof Drainage System. Brochure. 63 pp. 8% x 114% ins. Gives complete data and specifications for many details of roofing. Heinz Roofing Tile Co., 1925 West Third Avenue, Denver, Colo. Plymouth-Shingle Tile with Sprocket Hips. Leaflet, 8% x 11 ins. Illustrated. Shows use of English shingle tile with special hips. Italian Promenade Floor Tile. Folder, 2 pp., 8% x 11 ins. Illus- trated. Floor tiling adapted from that of Davanzati Palace. Mission Tile. Leaflet, 8/7 x 11 ins. Illustrated. Tile such as are used in Ttaly and southern California. Georgian Tile. Leaflet, 8% x 11 ins. Illustrated. Tiling as used in old English and French farmhouses. Ludowici-Celadon Company, 104 So. Michigan Ave., Chicago, Ill. "Ancient" Tapered Mission Tiles. Leaflet. 8% x li ins. 4 pp. Illustrated. For architects who desire something out of the ordinary, this leaflet has been prepared. Describes briefly the “Ancient” Tapered Mission Tiles, hand-made with full corners and designed to be applied with irregular exposures. Structural Gypsum Corporation, Linden, N. J. Relative Effectiveness of Various Types of Roofing Construction in Preventing Condensation of the Under Surface. Folder, 4 pp., 834 x 11 ins. Important data on the subject. Gypsteel Pre-cast Fireproof Roofs. Booklet, 48 pp., 816 x 11 ins. Illustrated. Information regarding a valuable type of roofing. U. S. Gypsum Co., Chicago, Ill. Pyrobar Roof Construction. Booklet. 8 x 11 ins. 48 pp. lllus- trated. Gives valuable data on the use of tile in roof con- struction. Sheetrock Pyrofill Roof Construction. Folder, 8% x 11 ins. SAGEN Covers use of roof surfacing which is poured in place. SEWAGE DISPOSAL Kewanee Private Utilities, 442 Franklin St., Kewanee, Ill. Specification Sheets. 734 x 10% ins. 40 pp. Illustrated. Detailed drawings and specifications covering water supply and sewage disposal systems. SCREENS American Brass Co., The, Waterbury, Conn. Facts for Architects About Screening. Illustrated folder, 914 x 1134 ins., giving actual samples of metal screen cloth and data on fly screens and screen doors. Athey Company, 6015 West 65th St., Chicago, Ill. The Athey Perennial Window Shade. An accordion pleated win- dow shade, made from translucent Herringbone woven Coutil cloth, which raises from the bottom and lowers from the top. It eliminates awnings, affords ventilation, can be dry-cleaned and will wear indefinitely. Orange Screen Co., Maplewood, N. J. Orsco Aluminum Screens. Booklet, 8 pp., 8 x 11 ins. Data on a valuable line of screens. Orsco Screens and Other Products. ins. Illustrated. Brochure, 20 pp., 8 x 11 Tllustrated. Door and window screens and other hardware. SHADE CLOTH AND ROLLERS Columbia Mills, Inc., 225 Fifth Avenue, New York, N. Y. ld Shade Data Book. Folder, 28 pp., 8% x 11 ins. trated. SHELVING-STEEL David Lupton's Sons Company, Philadelphia, Pa. Lupton Steel Shelving. Catalog E. Illustrated brochure, 40 pp., 8% x 11 ins. Deals with steel cabinets, shelving, racks, doors, partitions, etc. SOUND DEADENER Cabot, Inc., Samuel, Boston, Mass. Cabot's Deadening Quilt. Brochure, 727 x 10% ins., 28 pp. Illus- trated. Gives complete data regarding a well-known protec- tion against sound. STEEL PRODUCTS FOR BUILDING Bethlehem Steel Company, Bethlehem, Pa. Steel Joists and Stanchions. Booklet, 72 pp., 4 x 634 ins. for steel for dwellings, apartment houses, etc. Steel Frame House Company, Pittsburgh, Pa. (Subsidiary of Mc- Clintic-Marshall Corp.) Steel Framing for Dwellings. Illustrated. Steel Framing for Gasoline Service Stations. 8% x 11 ins. Illustrated. Steel Frame Standard Gasoline Service Stations. Booklet, 8 pp. 8% x 11 ins. Illustrated. Three standard designs of stations. Westinghouse Electric & Mfg. Co., East Pittsburgh, Pa. The Arc Welding of Structural Steel. Brochure, 32 pp., 8% x 11 ins. Illustrated. Deals with an important structural process. STONE, BUILDING Indiana Limestone Company, Bedford, Ind. Volume 3, Series A-3. Standard Specifications for Cut Indiana Limestone work, 8% x 11 ins. 56 pp. Containing specifications and supplementary data relating to the best methods of speci- fying and using this stone for all building purposes. Volume 1. Series B. Indiana Limestone Library, 6 x 9 ins., 36 pp. Illustrated. Giving general information regarding Indiana Limestone, its physical characteristics, etc. Illus- Data Booklet, 16 pp. 8% x 11 ins. Brochure, 8 pp. ARCHITECTURAL ENGINEERING AND BUSINESS PUBLICATIONS— Continued from page 190 STONE, BUILDING—Continued Volume 4. Series B. Booklet. New Edition. 8/4 x 11 ins., 64 pp. Illustrated. Indiana Limestone as used in Banks. Volume 5. Series B. Indiana Limestone Library. Porttolio. 834 x 11% ins. Illustrated. Describes and illustrates the use of stone for small houses with floor plans of each. Volume 6, Series B—Indiana Limestone School and College Build- ings. 8% x 11 ins., 80 pages, illustrated. Volume 12. Series B—Distinctive Homes of Indiana Limestone. 814 x 11 ins., 48 pages, illustrated. Old Gothic Random Ashlar. 8% x 11 ins., 16 pages. Illustrated. STORE FRONTS Brasco Manufacturing Co., 5025-35 South Wabash Avenue, Chicago, HIN Catalog No. 33. pp. 8% x 1l ins. high class. Catalog No. 34. Series 202. Standard construction. Booklet. 16 pp. 8% x 11 ins. Illustrated, complete data on an important type of building. Detail Sheets. Set of seven sheets, 814 x 11 ins., printed on trac- ing paper, giving full-sized details and suggestions for store front designs. Davis Solid Architectural Bronze Sash. Set of six sheets, 8% x 11 ins., printed on tracing paper. Full-sized details and suggestions for designs of special bronze store front construction. The Kawneer Company, Niles, Mich. А Store Front Suggestions. Booklet, 96 pp., 6 x 8% ins. Illus- trated. Shows different types of Kawneer Solid Copper Store Fronts. Catalog К. 1927 Edition. Booklet, 32 pp., 8% x 11 ins. trated, Details of Kawneer Copper Store Fronts. Detail Sheets for Use in Tracing. Full-sized details on sheets 17 x 22 ins. Kawneer Construction in Solid Bronze or Copper. Booklet, 64 pp., 8% x 11 ins. Illustrated. Complete data on the subject. Modern Bronze Store Front Co., Chicago Heights, Ill. | Introducing Extruded Bronze Store Front Construction. Folder, 4 pp., 8% x 11 ins. Illustrated. Contains full sized details of metal store fronts. Zouri Drawn Metals Company, Chicago Heights, Ill. Zouri Safety Key-Set Store Front Construction. Catalog. 8% x 1014 ins. 60 pp. Illustrated. Complete information with detailed munie and installation instructions convenient for architects’ es. International Store Front Construction. Catalog. 8% x 10 ins. 70 pp. Illustrated. Complete information with detailed sheets and installation instructions convenient for architects’ files. Store Fronts by Zouri. Booklet, 30 pp., 9 x 12 ins. Illustrated. Series 500. All-metal construction. Brochure. 20 Illustrated. Deals with store fronts of a Illus- TELEPHONE SERVICE ARRANGEMENTS All Bell Telephone Companies. Apply nearest Business Office, or American Telephone and Telegraph Company, 195 Broadway, New York. Planning for Home Telephone Conveniences. Booklet, 51 pp. 86 x 11 inches. Illustrated. Planning for Telephones in Buildings. Brochure, 73 pp. 8% x 11 inches. Illustrated. TERRA COTTA National Terra Cotta Society, 19 West 44th St., New York, N. Y. Standard Specifications for the Manufacture, Furnishing and Setting of Terra Cotta. Brochure. 8% x 11 ins. 12 pp. Com- plete E сатаа. Glossary of Terms Relating to Terra Cotta and Short Form Specification for incorporating in Architects" Specification. Color in Architecture. Revised Edition. Permanently bound volume, 9% x 124 ins., containing a treatise upon the basic principles of color in architectural design, illustrating early European and modern American examples. Excellent illustra- tions in color. Present Day Schools. 8% x 11 ins. 32 pp. [Illustrating 42 ex- amples of school architecture with article upon school building design by James O. Betelle, A. I. A. Better Banks. 8% x 11 ins. 32 pp. Illustrating many bankin buildings in terra cotta with an article on its use in ban design by Alfred C. Bossom, Architect. TILE, HOLLOW National Fire Proofing Co., 250 Federal St., Pittsburgh, Pa. Standard Wall Construction Bulletin 174. 8% x 11 ins. 32 pp. Illustrated. A treatise on the subject of hollow tile wall con- struction. Standard Fireproofing Bulletin 171. 814 x 11 ins. 32 pp. Illus- trated. A treatise on the subject of hollow tile as used for floors, girder, column and beam covering and similar construc- tion. Natco Double Shell Load Bearing Tile Bulletin. 6 pp. Illustrated. Natco Unibacker Tile Bulletin. 877 x 11 ins, 4 pp. Illustrated. Natco aem Backer Tile Bulletin. 8% x 11 ins. 4 pp. Illus- trated. Natcoflor Bulletin. 814 x 11 ins. 6 pp. Illustrated. Natco Face Tile for the Up-to-Date. Farm Bulletin. 874 x 11 ins. 8% x 11 ins. Part Two
Page 115
April, 1929 THE ARCHITECTURAL FORUM Westinghouse Equipment for build- ings includes: Circuit-Breakers Elevators Fans Fuses Insulating Materials Lamps Lighting Fixtures Motors and Control for Ventilating Systems, Pumps, etc. Panelboards Ranges Safety Switches Solar Glow Heaters Switchboards Turbines Transformers Watthour Meters Water Heaters Westinghouse Electrification Appliances Apparatus -Wiring-- W) The Sign of a Westinghouse Dealer E tevator performance reflects building perfection .... The tenants' and their visitors' appraisal of a building is determined by its facilities and furnishings. Performing with pre- cision, the up-to-date elevator affords remarkable convenience. The public voices its appreciation of such dispatch, comfort and safety in terms reflecting its admiration of the building as a whole. The Automatic Inductor Control, as de- signed by Westinghouse, affords distinc- tive elevator operation. The control is automatic—good service does not depend upon the skill of the operator. Westing- house elevators move swiftly, safely and surely. Passengers are never required to step up or down as the car is always stopped at the exact level of the floor. Patrons readily realize and appreciate such exacting elevator performance. WESTINGHOUSE ELECTRIC & MFG. COMPANY EAST PITTSBURGH PENNSYLVANIA SALES OFFICES IN ALL PRINCIPAL CITIES OF THE UNITED STATES AND FOREIGN COUNTRIES Westinghouse Complete electrification for modern buildings
Page 116
194 SELECTED LIST OF MANUFACTURERS’ TILES Kraftile Company, Niles, Calif. Я High Fired Faience Tile. Booklet. 32 рр. 8% х 11 ins. Illus- trated. Presents a fine line of tiles for different purposes. C. Pardee Works, 9 East 45th St., New York, N. Y., and 1600 Walnut St., Philadelphia, Pa. Pardee Tiles. Bound Volume, 48 pp., 8% x 11 ins. United States Quarry Tile Co., Parkersburg, W. Va. Quarry Tiles for Floors. Booklet, 119 pp., 8% x 11 ins. Illus- trated. General catalog. Details of patterns and trim for floors. 94 x 12% ins. Patterns of quarry tiles for floors. Illustrated. Art Portfolio of Floor Designs. Illustrated in colors. VALVES Crane Co., 836 S. Michigan Ave., Chicago, Ill. id No. 51. General Catalog. Illustrated. Describes the complete line of the Crane Co. C. A. Dunham Co., 450 East Ohio St., Chicago, Ill. The Dunham Packless Radiator Valve Brochure, 12 pp., 8 x 11 ins. Illustrated. Data on an important type of valve. Jenkins Bros. 80 White St., New York, N. Y. The Valve Behind а Good Heating System. Booklet. 4% x 74 ins. 16 pp. Color plates. Description of Jenkins Radiator Valves for steam and hot water, and brass valves used as boiler connections. Jenkins Valves for Plumbing Service. Booklet. 406 x 74 ins. 16 pp. Illustrated. Description of Jenkins Brass Globe, Angle Check and Gate Valves commonly used in home plumbing, and Iron Body Valves used for larger plumbing installations. VENETIAN BLINDS Burlington Venetian Blind Co., Burlington, Vt. Venetian Blinds. Booklet. 7 x 10 ins., 24 pp. Illustrated. De- scribes the "Burlington" Venetian blinds, method of operation, advantages of installation to obtain perfect control of light in the room. VENTILATION American Blower Co., Detroit, Mich. American H. S. Fans. Brochure, 28 pp., 8% x 11 ins. Data on an important line of blowers. Duriron Company, Dayton, Ohio. Acid-proof Exhaust Fans. Folder. 8 x 10% ins. 8 pp. Data regarding fans for ventilation of laboratory fume hoods. Specification Form for Acid-proof Exhaust Fans. Folder, 8 x 10% ins. Staynew Filter Corporation, Rochester, N. Y. : Protectomotor High Efficiency Industrial Air Filters. Booklet. 20 pp. 8% x 11 ins. Illustrated. Data on valuable detail of apparatus. WATERPOOFING Master Builders Company, Cleveland, Ohio. . Waterproofing and Dampproofing and Allied Products. Sheets in loose index file, 9 x 12 ins. Valuable data on different types of materials for protection against dampness. Waterproofing and Dampproofing File. 36 pp. Complete descrip- ions and detailed specifications for materials used in building with concrete. Sommers & Co., Ltd., 342 Madison Ave., New York City. “Permantile Liquid Waterproofing” for making concrete and cement morar permanently impervious to water. Also circu- lars on floor treatments and cement colors. Complete data and specifications. Sent upon request to architects using busi- ness stationery. Circular size, 8% x 11 ins. Sonneborn Sons, Inc., L., 116 Fifth Ave., New York, N. Y. Pamphlet. 334 x 8% ins. 8 pp. Explanation of waterproofing principles. Specifications for waterproofing walls, floors, swim- ming pools and treatment of concrete, stucco and mortar. The Vortex Mfg. Co., 1978 West 77th St., Cleveland, Ohio. Par-Lock Specification “Form D" for waterproofing surfaces to be finished with Portland cement or tile. Par-Lock Specification “Forms E and С” membrane waterproof- ing of basements, tunnels, swimming pools, tanks to resist hydrostatic pressure. Par-Lock Waterproofing. Specification Forms D, E, F and G. Sheets, 8% x 11 ins. Data on combinations of gun-applied asphalt and cotton or felt membrane, built up to suit require- ments. Par-Lock Method of Bonding Plaster to Structural Surfaces. Folder, 6 pp. 8% x 11 ins. Official Bulletin of Approved Products—Investigating Committees of Architects and En- gineers. WEATHER STRIPS Athey Company, 6035 West 65th St., Chicago, Ill. The Only Weatherstrip with a Cloth to Metal Contact. Booklet. 16 pp. 8% x 11 ins. lii Illustrated. Data on an important type of weather stripping. Ы ARCHITECTURAL ENGINEERING AND BUSINESS PUBLICATIONS—Continued from page 192 WINDOWS The Kawneer Company, Niles, Mich. Kawneer Solid Nickel Silver Windows. In casement and weight- hung types and in drop-down transom type. Portíolio, 12 pp., 9 x 11% ins. Illustrated, and with demonstrator. David Lupton's Sons Company, Philadelphia, Pa. Lupton Pivoted Sash. Catalog 12-A. Booklet, 48 pp., 8% x 11 ins. Illustrates and describes windows suitable for manufacturing buildings. WINDOWS, CASEMENT Crittall Casement Window Co., 10951 Hearn Ave., Detroit, Mich. Catalog No. 22. 9 x 12 ins. 76 pp. Illustrated. Photographs of actual work accompanied by scale details for casements and composite steel windows for banks, office buildings, hospitals and residences. Hope & Sons, Henry, 103 Park Ave., New York, N. Y. p Catalog. 124 x 1814 ins. 30 pp. Illustrated. Full size details of outward and inward opening casements. The Kawneer Company, Niles, Mich. Kawneer Solid Nickel Silver Windows. In casement and weight- hung types and in drop-down transom type. Portíolio, 12 pp., 9 x 11% ins. Illustrated, and with demonstrator. David Lupton's Sons Company, Philadelphia, Pa. Lupton Casement of Copper Steel. Catalog C-217. Booklet, 24 pp. 5% ж 11 ins. Illustrated brochure on casements, particularly for residences. Lupton Heavy Casements. Detail Sheet No. 101, 4 pp., 8% x 11 ins. Details and specifications only. Richards-Wilcox Mfg. Co., Aurora, Ill. Casement Window Hardware. Booklet, 24 pp., 8% x 11 ins. Illustrated. Shows typical installations, detail drawings, con- struction details, blue-prints if desired. Describes AIR-way Multifold Window Hardware. Architectural Details. Booklet. 8% x 11 ins. 16 pp. Tables of specifications and typical details of different types of construc- tion. List of Parts for Assembly. Booklet. 8% x 11 ins. 16 pp. Full lists of parts for different units. WINDOW SHADES AND ROLLERS Columbia Mills, Inc., 225 Fifth Avenue, New York, N. Y. DN Shade Data Book. Folder, 28 pp., 8% x 11 ins. trated. Illus- WINDOWS, STEEL AND BRONZE David Lupton’s Sons Company, Philadelphia, Pa. A Rain-shed and Ventilator of Glass and Steel. Pamphlet, 4 pp., 5% ES 11 ins. Deals with Pond Continuous Sash. Sawtooth oofs, etc. How Windows Can Make Better Homes. Booklet. 3% x 7 ins. 12 pp. An attractive and helpful illustrated publication on use of steel casements for domestic buildings. Truscon Steel Company, Youngstown, Ohio. Drafting Room Standards. Book. 8% x 11 ins. 120 pages of mechanical drawings showing drafting room standards, speci- fications and construction details of Truscon Steel Windows, Steel Lintels, Steel Doors and Mechanical Operators. Truscon Solid Steel Double-Hung Windows. 24 pp. Booklet. 8% x 11 ins. Containing illustrations of buildings using this type of window. Designs and drawings of mechanical details. Continuous Steel windows and Mechanical Operators. i Catalog 126. Booklet, 32 pp., 8% x 11 ins. Illustrated. WOOD-See also Millwork American Walnut Mfrs. Chicago, Ill. American Walnut. Booklet. 7 x 9 ins. 45 pp. Illustrated. A yery useful and interesting little book on the use of walnut in Fine Furniture with illustrations of pieces by the most notable furniture makers from the-time of the Renaissance down to the present. “American Walnut for Interior Woodwork and Paneling.” 7 x 9 ins. Illustrated. Discusses interior woodwork, giving costs, specifications of a specimen room, the different figures in Wal- nut wood, Walnut floors, finishes, comparative tests of physical ина and the advantages of American Walnut for wood- work. Association, 618 So. Michigan Blvd., Curtis Companies Service Bureau, Clinton, Iowa. Better Built Homes. Vols. XV-XVIII, incl. Booklet. 9 x 12 ins. 40 pp. Illustrated. Designs for houses of five to eight rooms, respectively, in several authentic types, by Trowbridge & Ackerman, architects, for the Curtis Companies. National Lumber Mfrs. Assn. Washington, D. C. Airplane Hangar Construction. Booklet, 24 pp., 8% x 11 ins. Use of lumber for hangars. Part Two
Page 117
April, 1929 THE ARCHITECTURAL FORUM 195 STROWGER PAX In the use of Strowger P-A-X, all connec- tions are automatically made, and then are automatically “locked” against disturbing and often costly intrusions. Many executives who have chosen this widely-used modern system of interior tele- phone communication place privacy above all of its other important features. The fact that it is automatic—thereby eliminating human intermediaries and their human errors and failings—has made P-A-X practically in- dispensable in the serving of executives of business and industrial organizations. The makers of Strowger P-A-X are the originators and foremost manufacturers of automatic telephone systems for both public and private service. Strowger engineers will be glad to submit studies on any project in which telephone equipment is specified. Strowger P-A-X Systems are available in any capacity from five lines and upwards. Check These Features of Strowger P-A-X Special Services , 24-Hour Service LU Absolute Privacy Instantaneous Connections Unfailing Accuracy Low Cost of Operation These are the requirements of a perfect Interior Telephone System. STROWGER DIAL SYSTEMS INCLUDE: Public Automatic Telephone Systems Private Automatic Telephone Systems—(Strowger P-A-X) Code Signal Systems Watchman Supervisory Systems Tele-Chec Systems (for theatres) Industrial Fire Alarm Systems Railway Signalling and Communication Equipment. Engineered, Designed, and Manufactured by Automatic Electric Inc. Factory and General Offices: 1033 West Van Buren St., Chicago, U. S. A. Sales and Service Offices in the Following Cities: Los Angeles Cleveland Dallas St. Louis Boston” St. Paul DESC ork Detroit Philadelphia Export Distributors: For Australasia—Automatic Telephones, Ltd.; Sydney. For Canada—Independent Sales & Engineering Co., Ltd.; Vancouver. Elsewhere—The Automatic Electric Company, Ltd.; Chicago. STROWGER 0 ДАМ, SYSTEMS
Page 118
196 GAUGE BOARDS | American Gauge Beard in East High School, Buffalo, N. Y. Heating Contractor, William E. Shaddock; Architects, F. J. & W. A. Kidd; Consulting Engineer, H. P. Dempsey, Buffalo. American Gauges, Recording Gauges, Dial Thermometers, Recording Thermometers and Clocks are furnished in the same case for uni- formity of appearance, either for wall or flush mounting. They make ideal gauge board instal- lations. Write for the following Catalogs: Gauge Catalog A-8, Recording Gauge Catalog E-8, Gauge Tester Catalog D-8, Relief and Pop Valve Catalog V-8, Thermometer Catalog F-8, Dial Thermometer Catalog G-8, Recording Thermometer Catalog H-8, Temperature Controller Catalog R-8. AMERICAN INSTRUMENTS Since 1851 CONSOLIDATED ASHCROFT HANCOCK CO. INC. Subsidiary of Manning. Maxwell and Maore/mc. 100 East 42-5 Street, New York City ARCHITECTURAL ENGINEERING AND BUSINESS Part Two Ensure your installations THE Baldor name plate is posi- tive assurance that petty me- chanical troubles will not oc- cur. Simplicity in design, extra strength at vital points even superior to the recommenda- tion of the industry, make rigid periodical inspection unneces- sary and maintenance costs almost nothing. Engineers agree that Baldor Motors, ball-bearing equipped, seldom require attention and give perfect satisfaction every day in the year. Leading manu- facturers of electrically oper- ated equipment havestandard- ized on Baldor Motors. Write for Bulletin today. It con- tains valuable -— 1 А CARTIER МОТОР > ТҮРЕ WI. NO. En | \ motor data you "uS ee | PA shouldhave. эл ———— IN 0S һ AMPS a МО. 1550235 & icv al BALDOR BA! DOR ELECTRIC CO. Electric Co. “А. z = s 4358 Duncan Ave. St. Louis, Mo. “Specifications for a Hospital” A volume which sums up in terms of actual specifications the practice in connection with hospital building and equipment of a widely known and highly successful firm of New York architects. The work, which covers the specifications prepared by York & Sawyer for a large hospital in Pennsylvania, goes into every item which is included in the broadest definition of the word "specifications." 488 pp., 814x11 ins. Price $6 NATIONAL TRADE JOURNAL, INC. 521 FIFTH AVENUE NEW YORK
Page 119
April, 1929 THE ARCHITECTURAL FORUM 197 Another New York Architect specifies GAS REFRIGERATION “ a 522 = n f g eet Y | | ELECTROLUX installed in Dis = oy = KY M TEM | = [==] [== | m» A аз =з aa two more apartment þouses Е ЩЕ because aa tsa шии ow ша =з =a са йй [ma (xp жш : 3 | = | of its many Ed ES unique advanta ges Fr | d. E serene dwellers of today want automatic refrigeration. More and more architects are specifying the Gas Refrigerator as best fitted to meet modern needs. Electrolux gives perfect refrigeration with less cost and more comfort. Its perfect silence is just one of its many unique advantages. No Machinery... No Noise Electrolux is absolutely noiseless! It has no bothersome machinery to wear, need attention or run up repair bills ...ho moving parts to vibrate or make the slightest sound. A tiny gas flame and a mere trickle of water do all the work of making cold. a ва BE (a3 [зї [газ [3x3 IE E [йд [ага [ura газ Cata | {ша [їч [an [wu [x3 (aa). IHE [жа [ёз (з (жез 27 laag la [sas der] Uum | EU [za Er [31:3 ESEZ] ied lo las ao aa a) Y . These two new apartment houses, 2101 and 2111 Myra Court, Brooklyn, N. Y And, best of all, the Gas Refriger- are Electrolux-equipped. Boris W. Dorfman, Architect. " ator costs less to operate than any other refrigerating system. EFI - i R A letter will promptly bring you | full information about Electrolux. Just write to —Servel Sales, Inc., Evans- THE GAS REFRIGERATOR ville, Indiana. MADE BY SERVEL
Page 120
198 ARCHITECTURAL ENGINEERING AND BUSINESS Part Two , - a TWAT The Aid po [REMEMBER 175 WATERPROOF J Architects, Zantzinger, The Authority Borie and Medary of Accomplishment Toca Broruers, during 80 years of ex- haustive research and painstaking man- ufacturing care, have perfected water- proofing and dampproofing compounds that meet every requirement in every type of structure large or small. The Toch organization stands ready and willing to cooperate with architects and builders to the fullest extent of their ability. For catalogs, prices and complete р. | В information address Toch Brothers, 443 Wen Will It Fourth Avenue, New York. Be Completed?” || TOCH BROTHERS “Established 1848” DAMPPROOFING and WATERPROOFING COMPOUNDS а ; NEW YORK WaS een а) pns a operi - x» XA — ате VINAY зохегезвс A LOE MED LOS ANGELES AEROBE STANDARD completion. Lately they have given more LONDON VARNISH WORKS consideration to a far more important question—“Will It Be Completed at АП?” New standards are being set up in build- ing practice. What was considered the acme of perfection twenty years ago would not even be accepted today as a completed building. Unless weather (including wind, moisture, cold and dust) is effectively shut out, a building is not completed. Calking with scientifically correct com- pound is too important to be passed over lightly. We want to place valuable infor- mation on compounds in your hands for reference. There is a coupon below for your convenience. LOSING outside door after delivery prevents same being opened again until delivery isremoved by householder through in- thus removed and inside door closed, outside door is automatically unlocked for next delivery: and inside door is locked automatically, Pecora Calking Compound is made by the side door. After delivery is Serviceable . . secure . . safe. makers of Pecora Mortar Stains — the ккө Же (БЕСЕ МАЮ О * This modern structure will be completed. ie Mare mete end ca енг Pecora Calking Compound will be in- co upp ei Delivery ixeceptacie stalled by the Ev-Air-Tight Calking Co., РЕ RA ....For Apartment Buildings and Residences.... Philadelphia, Pa. c ALKINC NSTALLED in door: depth does not protrude beyond door knob. Or installed in wall of rear hall, or directly to the kitchen, over refrigerator, ete. Made of furniture steel, elec- trically welded, double wall doors with insulation between. Furnished in one or more compartment arrangement and a variety of sizes. Finished in mahogany, walnut, quartered oak and olive green: best non-rust baked enamel. On market 13 years: specified by architects everywhere. Prices very eco- nomical. Interesting architect's portfolio, with complete de- tail description and ways to install furnished on request. Write for copy пот... . . . . . „ See SWEET'S Catalog RECEIVADOR SALES COMPANY 74 lonia Ave., N. W, Grand Rapids, Michigan Pecora Paint Co., 4th and Venango Sts., Philadelphia. Please tell me why a building isn't completed until it is calked, And give me full information on Pecora Calking Compound.
Page 121
April, 1929 THE ARCHITECTURAL FORUM 199 TRUSCON ‘The DEPENDABLE SOURCE of SUPPLY for all Steel Building Products Architects are finding many advantages in making Truscon their source of supply for all Steel Building Products. Their own experience has proved that Truscon Products are superior in design, con- struction and workmanship—that they can rely on Truscon quality always — and that Truscon’s large manufacturing » f all t s— Steel Joists— economical fireproof adc Steel Тш cde ea прете floor seio. ашошу sucked D a facilities and local warehouse system Å d tering. lat . А * Pivoted, Continuous, Counterbalanced, out cen ee um an ate assure prompt deliveries and protection Casement and Basement Windows. against delays. Also that securing all Steel Building Products from a single source centralizes responsibility and speeds up construction. The services of Truscon’s skilled engi- neering organization are offered to architects without obligation. Truscon engineers in all principal cities are ready to cooperate with you. Ste R fs—fi f, light per eger ny pdt one TRUSCON STEEL COMPANY any degree and waterproofed. YOUNGSTOWN, OHIO Engineering and Sales Offices in all Principal Cities Factories in Youngstown, Cleveland, Detroit, Los Angeles and Japan; The Truscon Laboratories, Detroit, Michigan; Foreign Trade Division, 90 West St., New York; The Trussed Concrete Steel Company of Canada, Ltd., Walkerville, Ont. THE SECRET OF SUCCESS = x bl d Welded Steel Fabrie—for rein- Sina Düoks—astordy, durable an forcing concrete driveways, pavements, fireproof, stock and special types. Swing floors and cement finishes to prevent Slide, Folding, Lift and Lift-Swing. cracking.
Page 122
200 ARCHITECTURAL ENGINEERING AND BUSINESS Part Two 2 үү үгү | ELIABILITY must be based on more than the mere item of price! SEDGWICK DUMB WAITERS and ELEVATORS for all purposes WRITE FOR NEW CATALOG Sedgwick Machine Works, 151 W. 15th St., New York Representatives in Many Principal Cities Simplicity Requires Better Walls... HE less ornate the plaster job, the more every defect will show up. You must have a foundation of lath that not only provides key and is stiff to work against, but one that will lay even between grounds. Otis Elevators Standard of the World Made in All Types Clinton Wire Lath is the answer. It is woven of finely tempered wire into a close even mesh. There are no soft spots to sink in under trowel pressure. The two direction weav- ing provides a double key irrespective of the di- rection of the trowel stroke. Clinton Lath cuts easily, lays evenly and is not expensive. For Every Purpose The simpler the job the better the lath required. Specify Clinton. You can trust it. Let us send you a bulletin. WICKWIRE SPENCER STEEL CO. is Service is available at 41 East 42nd Street, New York City, N. Y. Otis Se а any time through nation- wide branch offices. OTIS ELEVATOR COMPANY Offices in All Principal Cities of the World Worcester Chicago Los Ange'es Buffalo Atlanta Seattle Cleveland San Francisco Portland — === V CLINTON WIRE LATH
Page 123
April, 1929 THE ARCHITECTURAL FORUM 201 MOULDING MASTER.. FLOORS Serviceable, Modern Economical Floors for all Purposes Chicago Evening Post Building, W chitects, 20000 sq. fi. of EF-MOD HATEVER the flooring need—basements, corridors, individual rooms, en- та OER PUG Mois trances, stairheads—there is a Moulding Master Floor specifically built for that purpose. Years of practical experience, patient research and untiring experi- mentation have helped to make each Moulding Master Floor a superior product for its particular purpose. {There are real and obvious advantages in placing one contract to cover all floors in a building. The complete line now offered by FLOORING Moulding makes one contract possible. May we tell you something of the record of Moulding installations, and our plan of supervision which assures satisfaction? MOULTYLE + MOULSTONE THOS. MOULDING FLOOR CO. UNDERLAYMENT (Flooring Division, Thos. Moulding Brick Co.) DURAFLOR 165 West Wacker Drive Chicago, Ill. RUBBERCOTE Grand Central Terminal Bldg. Chamber of Commerce Bldg. MARBLETREAD New York, N. Y. Pittsburgh, Pa. Onwentsia Country Club, Lake Forest, Ill. Н. Т. Lindeberg, Architect. Over 15,000 sq. ft. of Rubbercote and Moultyle used.
Page 124
202 ARCHITECTURAL ENGINEERING AND BUSINESS Іл Saw FRANCISCO s mn ia Cathedral Apartments =т=! k эля ы x TA ; i ; ; " P PA he x 1 А { g Ё 804 : He These four buildings, like many others in San Francisco, have Bethlehem Wide-Flange Struc- tural Shapes in their Steel framework. Bethlehem Sections are by no means new to architects, engineers and contractors. When they were introduced, years ago, their economy in weight and cost of fabrication received im- mediate recognition. Bethlehem Sections are rolled in all popular sizes on this Com- pany's modern mills at Bethle- hem,Pa., and Lackawanna, N.Y. BETHLEHEM STEEL COMPANY General Offices: Bethlehem, Pa. District Offices: New York, Boston, Philadelphia, Baltimore, Washington, Atlanta, Pittsburgh, Buffalo, Cleveland, Detroit, Cincinnati, Chicago, St. Louis, San Francisco, Los Angeles, Seattle, ortland, and Honolulu. Bethlehem Steel Export Corporation, 25 Broadway, New York City Sole Exporter of our Commercial Products Part Two LEE EE ELE | LH ELE E nd ИИИНИН инини ПШ Т ПИТ Pacific States Telephone and Telegraph Building eae ee Pacific Gas and Electric Company Building BETHLEHENM- Wide-Flange STRUCTURAL SHAF
Page 125
April, 1929 (above) The floors of the attractive Hampton Hall Apartment, Pittsburgh, Pa., Herman Kamin, owner, are concrete reinforced with STEELTEX supported on steel joists. (right) Beautiful Oakwood Manor Apartment House, Dayton, Ohio. Approxi- mately 52.000 square feet of concrete floors supported by steel joists. STEELTEX rein- forces the floors, and acted as the concrete form. (left) STEELTEX for Floors isa combined steel reinforcing mesh and concrete form. It is quickly unrolled and cut to any desired length. Itcan be placed óver any type of beam or joist by means of STEELTEX for Floors clips or wedges. (rigbt) Placing concrete on STEELTEX— water-tight form, correct reinforcing. THE ARCHITECTURAL FORUM 203 ‘Complies with architects’ specifications — water-tight concrete form. correct reinforcing” they say about STEELTEX for Floors RCHITECTS, engineers, and contractors are welcoming a new concrete floor method that saves materials, time, labor, and money, and gives a cleaner, stronger completed job. STEELTEX complies with architects’ speci- fications— water-tight concrete form—correct reinforcing. Save annoyance, time and — expense. Build for safety by rigidly follow- ing architects’ and material manufacturers’ specifications. Although STEELTEX was announced to the construction industry barely a year ago it is already reinforcing the concrete floors of hundreds of buildings — hotels, apartments, churches, hospitals, schools, theatres, and office buildings. The pictures show the outstanding adaptability of STEELTEX but you will want complete information. Send for our free book, srEELTEX for Floors. The coupon brings it promptly. 3604 Union Trust Bldg. ш The world's largest manufacturers of welded steel fabric Pittsburgh, Penna. STEELTEX FOUR TYPES—SAME PRINCIPLE SAME PROTECTION for plaster .. for stucco .. for floors and roofs (concrete and gypsum) for stone or brick facing. National Steel Fabric Company 3604 Union Trust Building, Pittsburgh, Pa. Send, without obligation, your book, “sTEELTEX for Floors.” Name Company. City. State
Page 126
204 ARCHITECTURAL ENGINEERING AND BUSINESS Part Two Nol endabili NO WELDS IN STRESS—one piece of steel—expanded—without rivets, bolts or welds.in shear or tension—these are the features responsible for the rapid gain in Bates-Truss Joist popularity. A simple I-beam section is expanded into a lattice truss web. The expan- sion increases the depth of the beam— the truss materially increases its strength. The points of contact of the lacing and flange members are simply unsheared portions of the original plain web. By this process, all defective beams are automatically eliminated. a ганд Contractors, engineers, builders should all know about the Bates Expanded Steel Truss. We have prepared a book giving complete information. A copy will be mailed to you upon request. rds re (o. The expanded section ми is covered by basic com- zw modity and process pat- ents, owned, controlled and operated under ex- clusively by this company. ~ >. ig PANTAGES THEATRE, Fresno, Cal. P Manus Priteca, Archt. rl B. Newcomb, Eng. Sales, Engineering and Executive Offices EAST CHICAGO, IND.
Page 127
April, 1929 THE ARCHITECTURAL FORUM 205 (praceful Interiors... zc result of beautiful walls achieved with StAv-RIB .... A MILCOR PRODUCT (PACUL interiorsareamong the loveliest charms of today’s homes. And the architect plays an artist's part in achieving them. For beautiful walls are commonly a matter of construction. Decorative interiors require a wall and ceiling construction that will last the life of the building with- out cracking. STAY-RIB metal lath assures this permanence. The modern architect completes the interior ensemble with Milcor Expansion Metal Casings for door and window openings, and with Milcor Expansion Corner Beads for exposed corners and inside angles. Full details, literature and informa- tion about Milcor products for beauti- ful interiors will be sent on request. MILWAUKEE CORRUGATING COMPANY, Milwaukee, Wisconsin Branches: Chicago, Ill., Kansas City, Mo., La Crosse, Wis. Sales Offices: Boston, Mass., Detroit, Mich., Atlanta Ga., Little Rock, Ark., Minneapolis, Minn. Eastern Plant: The Eller Manufacturing Co., Canton, О, PRODUCTS FOR BETTER PLASTERING | ИШПИ HILL TEL LT Mi. cop е Тһе architectural effects possible with Milcor Expansion Casings are accepted as artistically correct. The old-fashioned wooden casing is eliminated allowing the plastered wall to come flush with the i casing. Expansion Casings are made from | | | | | | | | Tight Coat Galvanized Open-Hearth Steel 3 or Armco Ingot Iron also Zinc and Copper. ет
Page 128
206 ARCHITECTURAL ENGINEERING AND BUSINESS Part Two Newark For That Attractive and Modern Finish Around Wall Openings Kalman Steel Buck takes the place of wood buck, $round and standing trim. It eliminates the plaster cracks common to the warping and shrinking of wood buck and definitely in- creases the amount of wall space. It permits the close interpretation of any profile— provides a positive finish and edge for plaster around openings —and gives the wall a clean-cut, modern beauty. In addi- tion, it does not limit you to the use of stock mouldings. By the use of Kalman- trim, the same effect can be secured for windows. If you haven'treceived the book- let outlining the 16 advantages of Kalman Steel Buck for enhancing interior beauty, we will mail it to you. Write us. KALMAN STEEL COMPANY vetot күч Houston KALMAN STEEI de E Thiladelphia eere City Youngstown Charlotte utres MOL cili Nile Columbus Ut Office—New York) Washington, D. C.
Page 129
April, 1929 THE ARCHITECTURAL FORUM 207 [Ж UM XX I са EN шш эя ии GG чи MRNA Sir Francis Drake Hotel San Francisco Weeks & Day—Architects and Engineers Lindgren & Swinerton—General Contractors Judson Pacific Company—Fabricators rom Coast to Coast~ The beautiful Sir Francis Drake Hotel in San Francisco is indeed an honor to the famed navigator of the sixteenth century for whom it is named. Carnegie Steel Company is also honored that Carnegie Beams were selected to form the steel framework. From coast to coast, architects, engineers and builders have enthusiastically welcomed these new sections and their contribution to steel con- struction. In garages, factories, bridges, subways, schools, churches, apartments, hotels and great towering skyscrapers, Carnegie Beams are imparting to structural steel a new efficiency. Their parallel flanges simplify fabrication and erection. Their great strength permits the use of lighter sections, resulting in considerable economy in steel tonnage. Their constant-depth columns present opportunities for substantial savings, both in the drafting room and on the job. Those contemplating the erection of any type of building involving structural steel, would do well to investigate the advantages of these beams. A handbook, “Carnegie Beam Sections,” containing detailed information, will be sent at your request. CARNEGIE STEEL COMPANY с 7б ей of, UNITED STATES STEEL CORPORATION JE CARNEGIE BUILDING --- 2/77SBURGH, РА. w
Page 130
TSAS arm HÀ rere toit mnt rs ; а: e A 2. {2 2 WOW ARCHITECTURAL ENGINEERIN iG AND BUSINESS Part 'Two TEEL CONSTRUCTION AMERIC AN! IN STITUTE STEELC ONSTRUCTION A BETTER KNOWLEDGE OF STEEL Here is a handbook that should be on the desk of every engineer . . . that should be within reaching distance of every architect . . . that should be the first thought of everyone who works with steel. A new kind of steel hand- book . . . more usable . . . with all essential data instantly available . . . comprehensive, complete, com- pact. Forty thousand copies have gone into circula- tion since its publication a year ago. It is used as a text in 143 technical schools and colleges. This indispensable book is published by the Ameri- ean Institute of Steel Construction and contains, besides its immensely valuable technieal data, other contri- butions that the Institute has made toward standardi- zation and betterment of structural steel construction. These are The Standard Specification for Structural Steel for Buildings, The Code of Standard Practice and The Standard Specification for Fire-proofing. No one working with steel can afford to be without this important handbook. It is available from mem- bers of the Institute or may be had by sending $1.50 to the American Institute of Steel Construction, 200 Madison Avenue, New York. A coupon is attached for convenience in ordering. Mail it today and a copy of the handbook will be sent to you at once. AMERICAN INSTITUTE OF STEEL CONSTRUCTION, INC. The co-operative non-profit service or- | STEEL ganization of the structural steel in- dustry of the United States and Canada. Correspondence is invited. 200 Madison Avenue, New York City. District offices in New York, Worcester, Philadelphia, Birmingham, Cleveland, Chicago, Mil- waukee, St. Louis, Topeka, Dallas and San Francisco. CREATED THE SKYSCRAPER STEEL INSURES STRENGTH AND SECURITY AF-4 American Institute of Steel Construction, Inc. 200 Madison Avenue, New York City Enclosed is $1.50, for which please send me a copy of the Handbook of Steel Construction. Name. Address.
Page 131
April, 1929 THE ARCHITECTURAL FORUM 209 REPUBLIC e EEL PIPE CONSTANT BUILDING FUNDAMENTAL Leer NL AB. CL === = SS “О : NS PRODUCTS Pig Iron Semi-Finished Steel Bars and Shapes Hot and Cold Rolled Strip Skelp Black, Blue Annealed, Galvanized, Electrical and Long Terne Sheets Coke Tin Plate Tin Mill Black Plate Black and Galvanized Standard Pipe Oil Country Tubular Goods Bolts, Nuts, Spikes, Etc. Republic Steel Pipe continues through the years as a building fundamental undisturbed by to-day's revolu- tionary discoveries and inventions, and by the rapid changes in modern building methods and materials. Nature herself has never improved on the tubular method for conveying life streams, air, water... and for the plumbing system of the human structure. Man's best is always an imitation of Nature. Good steel pipeis thestandard means for transporting power, heat, water, air and other fluids in yesterday's or to- day's buildings. Republic Steel Pipe is going into many of the most modern buildings now under construction . . . reliable, lasting installations for the future. Branch Offices Birmingham Detroit Boston El Paso IRON & STEEL СО. YOUNGSTOWN O. бшш, Ne Nori Cleveland Pittsburgh Dallas San Francisco Denver Seattle St. Louis
Page 132
210 ARCHITECTURAL ENGINEERING AND BUSINESS A AN ROLLIN - DOORS A Silent Guardians of U. S. Mail (View in N. Y. Grand Central Station) Impressed with the many obvious advantages of Kinnear Steel Roll- ing Doors over ordinary doors, you might fail to notice the efficient safety device which automatically closes the strong, steel, fireproof doors in case of fire. n The arrows indicate sensitive pieces of metal which melt under the heat of flames. Instantly, with an automatically checked speed, down come the Kinnear doors— walls of steel to stop further ad- vance of flames. Architects and Specification Writers not fully acquainted with this and the other manifold ad- vantages of Kinnear Doors, are re- uested to write for full informa- tion for their files, or request our Sales Department for bids. No obligation. Branch Offices in Principal Cities Kinnear Manufacturing Company 1310-1320 Field Ave., Columbus, О, A DURAFLEX TILE INSTALLATION in the International Maga- zine Building, 959 Eighth Avenue, New York City. Huberth & Huberth, Agents, 2 Columbus Circle, New York City. TILE — That Hushes Footsteps and. Defeats Wear URAFLEX TILE is resil- ient — quiet underfoot — restful, a joy to walk on. And, like Duraflex-A Flooring, it will last for years because of the time-tested Duraflex for- mula of resilient and wear- resistant ingredients. Easy to keep clean and sanitary be- causeits smooth surface is im- pervious to acids, alkalies, fire or water. Comes in a variety of colors and the floors can be used immediately after laying. Write for Color Chart and other data. 'The Duraflex Company, Inc., Baltimore, Md.Offices in principal Cities. DURAFLEX MASTIC TILE ATL DURAFLEX-A FLOORING an important development in the concrete floor finish field to be announced next month Y Part Two
Page 133
April, 1929 THE ARCHITECTURAL FORUM 211 TONCAN window frames in- stalledthroughoutthe U.S. Gov t. Bureauof Engraving and Print- ing building in 1913 still con- tinue to give faithful service. Rust-resisting ToNCAN IRON for structures intended for permanenee ORE and more America's leading architects are sponsoring buildings that grow old slowly. SPOSOSSSSSSSSSOSCSSS Whether they are working out a monumental structure or a modest home, they seek to „Фе 11 1. 9%, avoid excessive deterioration and repairs as 4 е eagerly as they strive for beauty of design. t, N m On куаныр, public Palins or ie ol gO" COPPER ayt sive bungalows they consistently specify lon- i , Я can Copper Mo-lyb-den-um Iron for gutters, Mo lyb-den um down-spoutings, flashing, metal lath, cornices, IRON ventilators, ventilating ducts, window frames, = . ; and for those hidden parts where the greedy If you are not fully familiar with Toncan's attacks of corrosion are a constant menace. advantages write for our new book on sheet iron. You will find it valuable to you. They turn to this rust-resisting iron because they have learned that no other ferrous metal CENTRAL ALLOY STEEL CORPORATION lasts so long or endures so much, because it Massillon, Ohio Б . WORLD'S LARGEST AND MOST HIGHLY gives far greater service at no added cost. SPECIALIZED ALLOY STEEL PRODUCERS
Page 134
Seven years ago, when plastic paint in its present form was introduced, the beginning was marked of a great and rapidly growing industry. Right at the start, Textone, spon- sored by the United States Gypsum Company, took its place as one of the leaders. Since those days, the United States Gypsum Company has been privileged, through research, manufacturing and sales activities, to contribute to the upbuilding of the industry in many important ways. As a result, Textone today occupies a high place in the re- spect and confidence of every factor in the plastic paint industry. As a further result, you often hear the re- mark, “It is as good as 'Textone," which im- ARCHITECTURAL ENGINEERING AND BUSINESS 5 л оннан Made risht and sold right l2 Reaffirming Textone policies that mean much to Dealers The USG Powdered Paint Line includes: TEXTONE EMBELLO TEXTONE SEALER TEXTONE GLAZE GREENSPAR TEXSAND TEXOLITE RED TOP PATCH- ING PLASTER TEX TONE (Reg. U.S. Pat. Off.) THE PLASTIC PAINT Made by the UNITED STATES GYPSUM COMPANY General Offices: Dept.27-B, 300 West Adams Street, Chicago, Ill. Part Two сем plies a compliment that we sincerely appreciate and hereby gratefully acknowledge. Having in mind the responsibility imposed by this widespread and un- questioned confidence in Textone, we desire again to pledge our resources to a continuance of the task of always meriting this confidence. It is our intention to see to it that Textone is Made Right . . . Kept Right .. . Sold Right... and that a spirit of fair play be maintained as our guiding policy. We reaffirm this policy now, be- cause we conceive the good name of Tex- tone, and your good will, to be the most valuable factors in its further development in sales and profit possibilities. US
Page 135
April, 1929 THE ARCHITECTURAL FORUM 213 Not the same lath for every purpose. . . but the right lath for every need The varying types of construction, the diversified needs of the lather and plasterer all find an ade- quate solution in the Berloy Metal Lath Family. Every modern trend in building design points to new and different plastered effects and whether the plans call for broad planes of formed surfaces, there is a reciprocal advantage to be found in the tight Berloy lath for each need. If the requirements are straightaway surfaces, the new Berloy Tri-Plex will often effect a saving of plaster as high as 20%. If forming is required, Berloy Diamond Mesh, made of rust-resisting TON- CAN Iron, surpasses all in permanence and gives to these beautiful surfaces a base that is without equal. Where heavier re-inforcement is required, Berloy Ribplex in either the three-quarter or three-eighth rib can be safely recommended. Peacock Room, Mark-Hopkins Hotel, San Francisco The Berger Mfe. Company MAIN OFFICE Canton, Ohio BERLOY BRANCHES AT Jacksonville Kansas City Atlanta Boston Philadelphia Fittsburgh Chicago Long Island Roanoke Cincinnati City Rochester Columbus Los Angeles San Antonio Dallas Milwaukee San Francisco Detroit Minneapolis Seattle Hartford Montreal St. Louis Houston Newark, N. J. Toronto Indianapolis New York
Page 136
214 Builders of the- ;; City Beautiful Beauty that is strength, and strength that is beauty is the goal of the architect. Thus he has ever been the inspiration to building progress. To materialize the architect's forward look- ing plans, special methods of construction have been developed. A notable example of this is the Meyer Steelform method of concrete rib floor con- struction. It meets the modern need for high speed building operation—it makes concrete rib floors the most economical and most practical type of construction. Meyer Steelforms are installed and removed byan organization especially trained to render the greatest possible cooperation to both archi- tect and contractor. The service of this ARCHITECTURAL ENGINEERING AND BUSINESS organization starts with the architect's plans and continues right on through to the success- ful completion of the concrete floor. Meyer Steelforms are handled on a rental basis. Warehouses at strategic centers make immediate shipments to the job. You are invited to ask a representative to call and show you how Meyer Steelforms will help you realize a construction that does full justice to your plans. CONCRETE ENGINEERING COMPANY General Officess OMAHA, NEBRASKA Sales Offices and Warehouses Chicago, Detroit, Milwaukee, Minneapolis, Des Moines Kansas City, St. Louis, Dallas, Houston, San Antonio Oklahoma City, Los Angeles, Pittsburgh MEYER Steelforms THE STAN DARD THE ORIGINAL REMOVABLE STEEL FORMS FOR CONCRETE RIB Part Two The Beautiful New Gulf Building Houston, Texas Architect: Alfred C. Finn Houston Consulting Architects: Kenneth Franzheim and J. E. R. Carpenter New York Contractor: American Construction Com- pany, Houston eto ROT (een) Note the clean-cut, good-looking joists when Meyer Steelforms are used. Meyer Steelforms aye furnished in 1, 2 and 3 ft. lengths. Standard widths cre 20 in. and 30 in, Special widths, 10 in. and 15 in. FLOOR CONSTRUCTION
Page 137
April, 1929 THE ARCHITECTURAL i FERME LL ACE ciae oen Rm mr aup Бәла Partition Tile "Ar bus 13 DEAS Я WEE EL mero Gypsteel Partition Tile is better be- cause the Gypsum in it is stronger and tougher. The Gypsum in it is stronger and tougher because it is pure and, be- cause the crystals in it are of uni- form shape and size, they bind to- gether like bricks in a wall. The crystals are uniform, because our Gypsteel Process gives chemi- i cal absolute control each step of the s way from its derivation from phos- phate rock to the calcined Gypsum. (Oh yes, the Gypsteel Process, by the addition of certain elements Ut UCET ааа Te taies MAII n Te n Xx mp uH TIS MIL Tad TOMES УЕ, MEOS EM Wag RIMIS COLLE IEEE ae E NES FORUM EET "NEL ek Trent NE ae Жыры" This Answers The Question Why This Tile Is Better and the subtraction of others, makes it possible to derive the purest of Gypsum from phosphate rock.) Thus, with a perfect crystal forma- tion in the Gypsum, you get a tile that has an added strength and toughness. One subject to far less breakage in shipping, handling and erection. Wouldn’t you say that such a tile would also have greater fire resis- tance? Likewise, be less absorbent of moisture? This better tile costs no more than those not as good. . STRUCTURAL GYPSUM CORPORATION General Offices: Linden, N. J. Sales Offices: In Principal Cities amm Pa AIR...
Page 138
216 ARCHITECTURAL ENGINEERING AND BUSINESS Part Two Sterling Lifelong Blackboard So Dependable It Needs No Alternate TERLING Lifelong Blackboard has proved its superiority in actual service in thousands of schools and colleges everywhere. You can specify it for any school room installation where quality is of importance. A permanent investment, you canbe certain of its performance, for it is warp and buckle proof, strictly fireproof, — with a body that seasons and improves with age. And its jet black writing surface takes a clearer, cleaner chalk mark—erases easily, and is easier to write upon. When you specify “Sterling” you may be sure you have speci- fied complete and lasting black- board satisfaction. Our pledge of satisfaction stands behind this finer product. Each foot that leaves our fac- tories must perform to uphold our 46 year old reputation. Ster- ling Lifelong Blackboard with its many outstanding features is a product that every architect should know. Free to Architects A. I. A. File No. 35-b-12 Prepared for you by an Architect —ready for your files—15 pages of plans, elevations, and detailed specifications for installation of anyblackboard. Writeforfree copy i Ad sample. Address Dept.ZS 4. t Duncan High School Duncan, S. C. A Sterling Installation Architect: Paul Williams A a А АМ А М А А А М А А м А л А А М А А А м м м М АСА м А. М А м А А А АГА Ww = i 4 + eber Costello Со.Ё CHICAGO HEIGHTS, ILLINOIS E Makers of 4 Sterling Lifelong Blackboard 4 Old Reliable Hyloplate Globes - Maps + Erasers + Crayon 4
Page 139
April, 1929 THE ARCHITECTURAL FORUM 217 Ла the purpose of а conveying system is to speed up production and increase the net earn- ings. Standard Conveyors, all types, because of proper construction, stand up under the grind of daily service, thereby fulfilling, in every sense, the purpose for which they were installed. Because of these Construction Features Whether it is belt, slat, or roller conveyors; power or : " Three-point, sensitive ball bear- gravity; spiral chutes, piling, and tiering machinery; lift elevators or pneumatic tubes, there are Standard features that are the positive assurance of dependable conveyor service with economy. Architects who wish to furnish the most highly efficient plans will do well to get more information about ings. Sturdy angle iron frames. Large diameter steel through shaft with patented locking fea- ture. Ball bearings — Grease Packed with protecting shield and brass fittings for easy grease renewal (where conditions necessitate lu- bricated or protected bearings). TANDA JD js CONVEYOR COMPANY й NORTH SAINT PAUL, MINNESOTA New York Office, 420 Lexington Avenue Kansas City Office, 419 Manufacturers’ Ex. Bldg. Chicago Office, 549 West Washington Street Dallas Office, 3405 Oak Lawn Ave. Philadelphia Office, 3110 Market Street Los Angeles Office, 335 So. San Pedro St. Cleveland Office, 5005 Euclid Ave. Seattle Office, 321 Lumber Exchange Buffalo Office, 908 Ellicott Square Charlotte Office, 301 Builders Bldg.
Page 140
218 ARCHITECTURAL ENGINEERING AND BUSINESS You wouldn't have room enough for a Lipman if its size were as big as its value. But fortunately mere size is not a measure of value. А two-carat diamond is worth a train load of sand. The Lipman is almost invaluable to the user of commercial refrigera- tion. And it is the cheapest machine he can buy—not because of its first ELECTRIC REFRIGERATION * its size were as DIG as its value cost, but because of its ultimate cost. 'The true measure of value is always the cost of ownership. The cost of ownership of a Lipman, meaning the cost of depreciation plus the cost of service plus the cost of operation, is extremely low. Judged on this accurate basis, the Lipman offers unmistakably the biggest value. Write today for full information. Or, if you wish, let us send a Lip- man engineer to make a free analy- sis of your refrigeration problem. There's no obligation whatsoever. Part Two GENERAL REFRIGERATION CO., Beror, Wis. Send Booklet "D-27" | JSend Engineers Name
Page 141
April, 1929 THE ARCHITECTURAL FORUM 219 - the Wood -Fiber Insulating Board THE NATION'S PROTÉCTIO AGAINST HEAT and con Г | Fo eighteen years INSULITE has ae | stood for good insulation in homes and buildings of all kinds. Its all-wood stur- diness and heat resisting qualities have performed unceasingly a comfort-giving, money-saving service for people in man- sions and cottages, in commercial struc- tures of every variety. Winter cold loses its terrors. Summer heat is no source of dread. Locked against the elements is the house thus protected —and a sure means of economy in reducing fuel bills. Humidity is no cause of annoyance; sounds that once echoed from room to room are softened; health is better protected; the building itself is greatly improved, because INSULITE is a dou- ble purpose building board — structural strength and high insulating value in the one product. Architects are invited to send for samples— also Specification Portfolio showing details of various practical uses of INSULITE. Meera JS ETIE i : INSULITE is all »ood —plus the fabricat- , ing process which increases many times the | natural insulating quality of wood fibers. Wood thus fabricated not only possesses great ability to resist heat, cold and noise, - but has unusual strength and will with- stand the action of time over long periods. E INSULITE CO., LDER'S EXCHANGE, DEPT. 8, MINNEAPOLIS,
Page 142
220 ARCHITECTURAL ENGINEERING AND BUSINESS Part Two ÍLPHIEA, PA {КЕ SHORE DRIVE; CHICAGO, 1 REINFORCED CONCRETE Concrete Reinforcing Steel Institute Rail Steel Bar Association Tribune Tower Builders Building Chicago Chicago
Page 143
April, 1929 THE ARCHITECTURAL FORUM 221 basic reasons why STEEL FRAMING ^ should be used in erecling EVERY MODERN HOME J] priae temo git ramensrk known in building construction—no sagging or settling, no expansion or contraction to cause plaster cracks in walls and ceilings. Here is solid, . Skyscraper construction for residences. into any design and permits the widest range in meeting special requirements in all types of residential buildings. There are no architectural limitations. ADAPTABILITY—Steel Framing fits QUICK ERECTION—The complete 3 Steel Framing comes to the building site with every piece cut to fit and marked for its place. Quick and easy erection is made with ordinary tools by craftsmen familiar with building construction. SAFETY—One of the outstanding advan- В И 4 tages of Steel Framing over other materials STEELFRAMINGisapracticalandeconomical is its safety from fire. It acts as a light- Method by which residences are constructed ning conductor and offers the greatest protection With skyscraper strength . . . of steel. Write against wind and storm. for complete information. Steel Frame method have-increased value because they possess construction advan- tages not found in ordinary residential erection. Resale values are higher because the worth of permanent construction in this modern manner does not decrease as years pass. Banks look with favor upon steel frame construction, in many instances granting greater mortgages. STEEL FRAME HOUSE CO. A Subsidiary of McCLINTIC-MARSHALL CORPORATION OLIVER BUILDING PITTSBURGH, PA. El ADDED VALUE—Homes built by the A | А = à 4 М | THE MODERN METHOD OF HOUSE CONSTRUCTION < -
Page 144
222 ARCHITECTURAL ENGINEERING AND BUSINESS Part Two иус APPLIERS WENTY expert, responsible, well established concerns, whose addresses are listed below, offer you the fruit of intensive experience in the problems of damp-proofing and plaster key. | Par-Lock Plaster Key, long recognized as the | maximum specification for protected plastering | was applied on the interior of all exterior walls | of the New Penobscot Building, Detroit, by the Par-Lock Appliers of Michigan —a symbol of interior worth to match its magnificent exterior. — ST S m There is a Par-Lock applica- tion for every situation in 27 eti | | J pEr which plaster needs protec- ; I rl rrt? | tion from moisture, cleavage, Fre ertr | » as $ rrt P rf condensation or chemical [т | ; TI: | attack from ingredients in ү TT r Г ЁЁ | the structural surface. [үгү -cEEE : | ; ! - : pr "PTT | The nearest Par-Lock Applier [рг T1423. | is your logical resource in ae ree ree ‘ ө үр! ГЕ | assuring walls and ceilings WE ү! |! : - ЕЕ | that are permanently fine. ИЙ asphalt coats rrEEF | r GREATER PENOBSCOT BUILDING SMITH, HINCHMAN & GRYLLS, Architects and Engineers DONALDSON & MEIER, Associate Architects ALBERT A. ALBRECHT CO., General Contractors McNULTY BROTHERS, Plastering Contractors coating of grit THE VORTEX MANUFACTURING CO. . 1984 West 77th St., Cleveland, O. PAR-LOCK APPLIERS ' ST. LOUIS ALBANY, CLEVELAND, NEWARK, N.J. 425 Orange Street 218Hunkin-ConkeyBldg. 24 Commerce Street 1514 Chemical Building ATLANTA COLUMBUS, NEW YORK CITY, TORONTO, Bona Allen Building 751South Cassingham Rd. 50 Church Street wen Street, West BALTIMORE, DETROIT, PHILADELPHIA, ; 613 West Cross Street 2457 First National Bldg. 1700 Walnut Street onion ee BUFFALO, KANSAS CITY, MO. PITTSBURGH, 503 City Bank Building 958 Ellicott Square Bldg. 2035 East 19th Street 614 Bessemer Building WILKES-BARRE, PA. CHICAGO, MINNEAPOLIS, SCRANTON, PENNA. 904 Second Nat’! Bank 111 West Monroe Street 434 Builders Exchange Cedar Avenue Building
Page 145
April, 1929 THE ARCHITECTURAL FORUM 223 — —. ADVISORY AN . 4 SERVICE М Sound Institutional Laundry Ideas... Whenever and Wherever You Want Ihem Г order to cooperate with you promptly, Troy engineers comprising the TROY ARCHITECTS’ ADVISORY SERVICE are located in the principal centers throughout the country. @ Consult these specialists whenever you are planning a laundry for a hospital, hotel, school, or similar in- stitution. Take advantage of their seasoned experience in layout, equipment and specifications. Let them cooperate with you on matters of machinery placement, routing without crossing traffic lanes, power conservation, provision for future expansion. @ This service is rendered to respons- ible individuals and firms...without cost, without obligation. TROY LAUNDRY MACHINERY CO., INC., Chicago, New York City, San Francisco, Seattle, Boston, Los Angeles. James Armstrong e Co., Ltd., European Agents: London, Paris, Amsterdam, Oslo. Factories: East Moline, Ill., U. S. A. TROY LAUNDRY MACHINERY 4 1 | SINCE 1882... THE WORLD'S PIONEER MANUFACTURER of LAUNDRY MACHINERY |
Page 146
224 ARCHITECTURAL ENGINEERING AND BUSINESS ЕИ CAIS à - EE БАУУ S TRES ed Amin HEAT ins 2 lx e: Far Lx м id 4 * 5 л J ES ILC EM ES ES etr ug ЖЕЙ) ЇЧ Heating. Problem is TOO SERIOUS to be fooled with! AUTOMATI ANTHRACITE was kept “under the hat” until it was so perfected that it would fulfill all the exacting requirements of HOME-HEATING. But now— successfully installed in thousands of homes, proved in reliability, outstanding in its remarkable efficiency, automatic convenience, and its UNIFORM HEAT at all times and under all conditions—the “‘lid is off," so to speak. Now is the time for everyone interested in complete heating insurance to investigate the facts and know about this most modern and reliable automatic heating system. The ELECTRIC FURNACE-MAN is the final answer of science to the problem of automatic HOME- HEAT, using a fuel that everyone knows is safe. You take no risk. There is no fire-hazard—no smoke, smudge or odor. The ELECTRIC FURNACE-MAN is much more than a mere mechanical means of feeding the fuel and removing the ash. It is revolutionizing the very fundamentals of home-heating. It is creating new standards of efficiency, cleanliness and economy. Oh Electric Furnace-Man Extensively used for hot water supply For every heating system now in use— warm air, steam, vapor or hot water. Burns ANTHRACITE—the SAFE FUEL —in the economical Buckwheat or Rice sizes. No grates to shake—no drafts to regulate. Easy to install, simple in operation, and with UNIFORM HEAT and dependable performance fully in- sured. Authorized Distributors in prin- cipal cities. Patented Product of DOMESTIC STOKER COMPANY Gillespie Bldg., Seven Dey Street, New York Part Two www wc чр чр чр ч чучу FITZGIBBON Steel BOILERS for heating ^ = give longer service ^ maxi- mum heating efficiency ^ o require less fuel Firzemrnons Borer Company, Ine. 570 SEVENTH AVENUE NEW YORK Works: OSWEGO, N. Y. Branches and representatives in principal cities pow > 42> > wo uw ww чу чус Heating a Ventilating Units You can specify PeerVent Units with complete confidence. They are positively silent in operation, highly efficient, and dependable. Peerless Units built eighteen years ago are still giving perfect satisfac- tion. The latest PeerVent is improved throughout—better radiator, better motor, better fans, and better controls. Catalogue F-4. Peerless Unit Ventilation Co., Inc. Pioneers in Unit Ventilation Bridgeport, Connecticut Selling Agents in Principal Cities from Coast to Coast
Page 147
April, 1929 REG. U.S. РАТ. OFF THE ARCHITECTURAL FORUM 225 О AN ANNOUNCEMENT— PETRO BOARD OF DIRECTORS W. C. McTARNAHAN PRES. PETROLEUM HEAT а POWER CO ROBERT ADAMSON T. COLEMAN DuPONT FREDERIC EWING F. MURRAY FORBES W. CAMERON FORBES delayed. 10 years OR 26 years we have pioneered, developed, and built oil heating equipment. In that time we have become the largest manufacturer of oil burners in the East, where we are also one of the foremost distributors of light and heavy Fuel Oil. After a quarter century, this announcement to the architectural profession may be said to be a bit tardy. But it has been held back because Petro was ahead of its time. Ten years ago, even five years ago, the story of this burner would have been accepted as the story of just another oil burner. Few indeed recognized then the urgent need for equipment so well engineered, so perfectly built. And even more serious, the number of dealer organizations sufficiently skilled in proper installation practice, might have been counted on the fingers of two hands. Under these circumstances, widespread distribution and gen- eral publicity would have been rather premature. It would have jeopardized the good name of Petro, for no oil burner is any better than its installation. But now, Petro has come into its own. With a wealth of engi- neering background, with nation-wide acceptance, with highly skilled Petro distributors in all important cities, we offer to the builders of America, the finest and most complete line of fully engineered oil burners the industry has produced. Architects will be prompt to se- cure detailed information of this un- usual line. Your local Petro dealer will gladly cooperate with you, or write us direct. PETROLEUM HEAT & POWER COMPANY Makers of Oil Burners Since 1903 Dr. JOHN A. HARRISS Executive Offices and Plant STAMFORD, CONNECTICUT ALFRED O. HOYT REGINALD H. JOHNSON BRANCH OFFICE 834 Commonwealth Ave. 511 Fifth Ave. BOSTON, MASS. NEW YORK CITY 32 Franklin St., PROVIDENCE, R. I. FESS SYSTEM COMPANY (Subsidiary) SAN FRANCISCO, CAL., 220 Natoma St. LOUIS G KAUFMAN BRADLEY W. PALMER R. G. STEWART
Page 148
226 ARCHITECTURAL ENGINEERING AND BUSINESS Part Two ETRO REG. U.S. PAT. OFF DOMESTIC OIL BURNERS AY Petro Burners are of the mechanical atomizing nage ee oe type, and are built in such a number of sizes and and Engineers.” models as to cover the entire heating and power field. Capacities range from 200 sq. ft. of radiation to 375 H. P. per burner. Models are built for either fully automatic, semi- automatic or straight manual control. All Petro Domestic Oil Burners are fully automatic in operation. Ignition is either straight spark or combina- tion spark and gas. American Oil Burner Association No. 3 Specification Oils, or lighter, are appropriate. Service hot water may be heated from the main heat- ing boiler through standard indirect heaters during both summer and winter. The Petro line of fully automatic dom- estic burners consists of five models, all allied in design and method of oper- ation. They use the intermittent prin- ciple of firing,and when inoperative entail no standby oil, gas or electric current losses. High capacity Petros are found in large structures where automatic control of temperature is de- sired, such as churches, schools and hospitals. The first Petroinstallation in the East wasin the “Mother Church” at Boston. Listed as Standard by The Underwriters’ Labora- tories, Inc. Approved bythe Board of Standards and Ap- peals, New York, New York. Approved by the Commonwealth of Massa- Model LD-O chusetts, Dept. of Public Safety. Approved by State of Connecticut, Department of State Police. AIR AN obit This is the heart of all Petro Turbine Atomizing Burners —the basic feature that has made possible the extraordi- nary records established by Petro. It is the Air Turbine Driven Atomizing Cup! It has long been admitted that the best and easiest manner by which fuel oil could be atomized is that of centrifugal force, and Centrifugal Atomization has been Petro’s for over a quarter of a century! Model LD-4 A GREAT OIL COMPANY IS BEHIND PETRO The experience gained in over a quarter century’s specialized applica- tion to the design of efficient equip- ment for the combustion of fuel oils, and over thirteen years of actual ex- perience in delivering the oils them- selves, proved the need for a complete line of oil burners to cover the indus- try’s entire needs. Part of the great fleet of Petro oil deliverytrucks operating in the Boston territory, on parade.
Page 149
April, 1929 THE ARCHITECTURAL FORUM 22, ETRO INDUSTRIAL OIL BURNERS LL Petro Industrial Turbine Burners are designed to handle oils as heavy as 10° Baume, preheated. Ignition is manual, but automatic high and low flame operation is obtained by means of the PETRO pressure regulators. мі The average опе and two boiler low pressure heating plant is excellently handled by the unit type “В” Burners. The Medical Tower, Newark, N. J., a modern professional building is Petro equipped. The Petro Type “LA” Burner consists of a Petro gun assembly and a Petro Air Register, which controls the volume and distribu- tion of the secondary air for com- bustion. In the Petro combination fan and pump set both air fan and oil pump are operated as one unit driven by a single motor. These sets are commonly installed in duplicate and insure continuity of operation. The Petro Type *B" Burner in general design and operation is the same as the “А” Line. Petro Type “LA” Equipment is: Listed by the Underwriters' Laboratories, Inc. Model B2 Q T Approved by the Board of AIR FROM FAN j N Standards of Appeals, New York, iH i m "S ай | "p М New York. He - . чир JA! dA PETRO “LA” A. BURNERS The engineered perfection of Petro burners warrant their selection for use in many of the world-famous buildings of the United States. The Metropolitan Life Insurance Company Building, New York, is a noteworthy Petro instal- lation. Petro’s engineers simply took the cup off the motor shaft, put a highly efficient air turbine wheel on the cup and used the air discharge from the fan to spin the tur- bine wheel. Result— a 50% increase in cup speed with no increase in motor r.p.m. Petro's high cup speedand high efficiency is one of the many reasons for its favor among the leading architects and engineers of the country. The modern power plant of the Cascade Laundry, New York. The clean- liness, ease of op- eration and in- herentability of Petro equipment to meet a widely fluctuating load is best exempli- fied by this mod- ern power plant ^ 1 A Petro “LA” Burner swung open, with “gun” casing removed, equipped by showing the Adjustable Air Register Vanes, the Atomizing cup Petro. with its air turbine whecl, and the distributor tip at the end of the fuel tube. Upper left: A Petro Motor Driven Combination Fan and Pump Set.
Page 150
228 ARCHITECTURAL ENGINEERING AND BUSINESS REG. US. РАТ. OFF ' ET Part Two The Petroleum Heat & Power Company is a Great Engineering Organization WENTY-FIVE years ago, W. C. McTarnahan rec- ognized the value of engineer- ing in oil burner design and construction. He associated himself with M. A. Fessler, one of the real pioneers in oil burn- ing. Fessler was an engineer of signal ability. Together they developed the burner now known as Petro. Today Mr. McTarnahan has surrounded himself with skilled engineers. These men come from 18 different col- leges and universities, such as Massachusetts Tech., Stevens, Brown, Yale, Columbia, Penn U., and New York U. The PETRO Mechanical Atomizing Oil Burner and Air Register finds application in the large central station and power plant field. For nearly ten years this type of equip- ment has met with great favor among the leading architects and engineers. (Above) Runkel Bros. Chocolate Works, New York, one of the modern power plants equipped with Petro Mechanical Atomiz- ing Oil Burners. An actual count in the fac- tory shows a trained engineer —electrical, mechanical, com- bustion and heating—for every 7 mechanics on the payroll. Small chance indeed, for a Petro to ever reach the field without measuring up 10096. And with 6 times as many engineers as salesmen, Petro sales increased 400% in 1928 and 1224.2— in January, 1929! Architects are urged to avail themselves of the services of this staff on any heating prob- lem. For detailed information confer with the local Petro dealer or we invite you to direct your inquiry to the PETROLEUM HEAT & POWER COMPANY, STAMFORD, CONNECTICUT.
Page 151
April, 1929 THE ARCHITECTURAL FORUM 229 MINWAX PRODUCTS + SEAL - PROTECT - BEAUTIFY STAINLESS, SANITARY, ALMOST WATERPROOF FLOORS WITH THIS TESTED MATERIAL... 1. Cannot wear like film-protected floors. Minwax Flat Finish for wood floors does not depend on the formation of a film to protect the surface to which it is applied. 2. When wear eventually shows can No film yet devised can stand the wear and be immediately brought back to tear to which most floors are normally original condition with rag satu- subjected. rated with Minwax Flat Finish. Like other Minwax liquid protective ma- 3. Very easy to apply, made in natu- terials, Flat Finish penetrates deeply into ral E stain ер The one ma- the surface to which it is applied, becom- terial ereates the entire finish. ing an integral part of that surface, add- Fastdeuta op И-Пакебири Ihe наш. ing to its wearing qualities and protecting it from stains. Minwax finished floors have these fea- tures of economy to command your at- ral beauty of the wood, whether floor or standing trim, inside or outside, as no surface film can possibly do. Complete and detailed information for tention: the asking. MINWAX CO.. rive. Engineers and Manufacturers of Waterproofing and Protective Products Branch: 230 East Ohio St. 1] West 42nd Street Minwax Company, Ine. 11 West 42nd St., N. Y. C. Please send me literature on à _ Products |. Membrane Waterproofing Factory: Delawanna 5 } Foundation Dampproofing Chicago, Ill. w York Cit New Jersey + = ' Ке y Caulking Compounds Representatives = ; Refer to telephone directory listiug in the following cities: е Камен Dampproofing Asphalt Products CLEVELAND, OHIO COLUMBUS, OHIO DETROIT, MICH. JACKSONVILLE, FLA. CHARLOTTE, N. C. LOS ANGELES, CAL. CINCINNATI, OHIO MIAMI, FLA. SAN FRANCISCO, CAL. Canadian Representative The Raines Co. of Canada, 1008 Anderson Street, Montreal, Que. TAMPA, FLA. MINNEAPOLIS, MINN. PHILADELPHIA, PA. PITTSBURGH, PA. PORTLAND, ORE. RICHMOND, VA. ST. LOUIS, MO. ATLANTA, GA. BALTIMORE, MD. BOSTON, MASS. BUFFALO, N. Y. Brick and Cement Coating Transparent Waterprocfing ' Conerete and Terrazzo Floor 3 iur dus UN oe Finish : as E Address — — — Concrete Floor Paint . : $ 3 "Wood Finishes and Waxes . Name——
Page 152
230 ARCHITECTURAL ENGINEERING AND BUSINESS Low-cost Year-round AUTOMATIC HOT WATER SUPPLY.. for the Otl-heated Building HE Taco water heater heats the water supply from the same flame that heats the home or building. The cost of maintain- ing this automatic hot water supply during the heating season is next to nothing. Dur- ing non-heating months the cost is lower (in most parts of the country) than that of any type of automatic water heater. The Taco water heater can be hooked up with any standard heating boiler and oil burner. The entire operation is automatic- 3 7-ROOM THERMOSTAT AUTOMATIC ally controlled, winter and summer, by means of the patented Taco Abbott system. Endorsed by heating engineers. Taco heaters supply ample, clean hot water in buildings large and small, with oil, gas or coal-fired heating boilers. We will be glad to furnish full informa- tion and engineering data in connection with specific jobs, or for general reference. Write Taco Heaters, Inc., Dept. D-2, 342 Madison Avenue, New York City. ATER from the steam or hot water boiler of the furnace passes through the Taco shell and back to the boiler. In passing through the shell this boiler water surrounds a copper coil through which the domestic water supply flows. The domestic water, heated by the boiler water, flows automatically up to the domestic water supply tank. Even during non-heating months hot water is supplied continuously and automatically, by the oil burner at trifling cost. Control of the entire system is coordinated, simplified, and made auto- matic by the patented Taco Abbott system. TACO FUEL-LESS WATER HEATERS Part Two
Page 153
April, 1929 THE ARCHITECTURAL FORUM 231 C —————————P Dunham Differential Vacuum HeatingSystem Baltimore Trust Co. Building Baltimore. Md. O the rapidly growing list of outstanding skyscrapers to be heated by a Dunham Differential Vacuum Heating System is added Baltimore’s new 34-story banking house. The structure will be the tallest in the city and the highest building south of the Mason-Dixon Line. Indeed it is said that its height of 484 feet is exceeded in the South only by the Washington Monument. The rentable floor space of more than 200,000 square feet exceeds that of any other building in the city. The first floor will be given over to the Bank and stores. Three mezzanine floors will also be devoted to banking. Seventeen typical office floors will rise above the banking section. At this point there will be a set-back where the thirteen additional floors of the tower begin. The exterior of the first four floors will be of stone, the remainder of the structure to be of brick decorated with stone. Associated Architects: Taylor & Fisher Smith & May Consulting Engineer: Chas. L. Reeder Heating Contractors: H. E. Crook Co., Inc. ^ we " erar Dunham Differential Vacuum Heating System to be Installed Steam will be generated in the central portion of the basement. The distributing system provides separate mains for feeding the hot water storage equipment and blast radiation. It also provides separate mains for feeding direct radiation in the several zones. The main riser will run to a pipe space above the fifteenth floor and on to the thirty-second floor. The main in these spaces will feed down- ward to all floors. Each of these main distribution systems will have its individual return lines connecting to the Dunham Differential Vacuum Pumps in the basement. The returns from the blast radia- tion and hot water systems will run to a Dunham Duplex Vacuum Return Line Pump which will return condensation from these to the boiler. U.S. Patent No. 1644114. Additional patents in the United States, Canada and Foreign Countries now pending. Over eighty sales offices in the United States and Canada and the United Kingdom bring Dunham Heating Service as close to you as your telephone. Consult your telephone direc- tory for theaddress of our officeinyour city. An engineer will counsel with you on any project. €. A. DUNHAM Co. DUNHAM BUILDING 450 East Ohio Street, Chicago
Page 154
232 ARCHITECTURAL ENGINEERING AND BUSINESS Part Two — further evidence that A€EROFIN The Standardized Light-Weight ) Fan System Heat-Surface New York Athletic Club Sr is used York & SAWYER Architects Сіуре R. PLACE Consulting Engineer Cuas. Т. Wies, Inc. General Contractor ALMIRALL & Co. Heating Contractors AMERICAN BLOWER Co. Fan System Apparatus WV Photos, Brown Bros. Aerofin’s standardized encased unit construction, light-weight, and extraordinary compactness not only make possible, but inspire a finished installation in keeping with the finest modern Archi- tecture and Engineering. The fact that 4erorin’s installed cost is less than heavier, bulkier, corrosive surface is fortunate but far less important. Write to Our Newark Office for Piping Diagrams and Detail Information on any or all Types. AERGFIN, Tube-Plate Con- struction, for pressures up to 50 lbs. gauge. AERGFIN, continuous seamless tubes, for pressures from 25 to 350 Ibs. gauge (Temp. 500° F.) AEROFIN, continuous seamless tubes, multiple-coil construction, for pressures from 21% to 150 lbs. gauge. (Illustrated.) All Units in standardized steel Casings, ready for Pipe and Duct connections Manufactured by Burnham Building 850 Frelinghuysen Avenue, NEWARK, N. J. Oliver Building CHICAGO 39 Cortlandt Street, NEW YORK PITTSBURGH Land Title Building United Artists Building Paul Brown Building PHILADELPHIA DETROIT ST. LOUIS Aerarin is sold only by Manufacturers of nationally advertised Fan Heating Apparatus
Page 155
April, 1929 THE ARCHITECTURAL FORUM 233 "Ihese Oil Burners paid YOU WILL for themselves" ~ ~ Vick’s Chemical Company gets “perfect satisfaction" with Johnson automatic oil burning equipment. A high standard of effi- ciency has been set at the Phil- adelphia plant of the Vick Chemical Company, where ex- acting temperature control is essential in the manufacture of Vick’s VapoRub. The superin- tendent of this factory writes: “We have used the equipment for about two years with perfect satisfaction, during which time the saving in fuel and labor alone has been more than enough to pay for our two installations, aside from eliminating all the dust and also the storage space for coal.” There is no longer any necessity for boiler room extravagance. Heat supplied by Johnson Oil Burners is efficient because there is no waste in banking fires; no unburned fuel to fall into the ash box. Fuel is burned only when heat is needed. Labor costs are reduced because one man can easily take care of an en- M Awarded Gold Medal. Sesqui- Centennial Fx- position, Philadelphia, 1926, for '' Excellence of workmanship and completeness of design" tire battery of boilers. Ash removal expense is entirely eliminated. For Every Heating and Power Purpose In homes, large buildings, fac- tories and industrial plants Johnson oil burning equipment is receiving enthusiastic endorsement from Johnson Rotary Burners, with either manual, semi- coast to coast. automatic or full automatic control, are made in three styles and six sizes—giving a range of from 250 to 27,800 square feet of steam radi- ation or the equivalent. We also = manufacture natural draft, whirl- wind, low pressure air and steam atomizing oil burners; also electric and steam driven oil pumping and preheating equipment. And each product, fully guaran- teed, is the result of more than 23 years experience in the exclusive manufacture of oil burning equip- ment. Our Engineering Department will be glad to help you in the solution of your heating or power problems. Separately Bound Copies of our Catalogue in Sweet's for drafting room use will be mailed on request. JUN Wo JU |а ADN M SQ, О! L BUR N ERS Listed as Standard by the Underwriters’ Laboratories S. T. JOHNSON CO. Main Office and Factory, 940-950 Arlington Street, Oakland, California. Factory Branches SAN FRANCISCO, SACRAMENTO, STOCKTON, PHILADELPHIA FIND OUR LOCAL REPRESENTATIVE’S ADDRESS IN YOUR TELEPHONE DIRECTORY
Page 156
234 The Travelers Building, Insurance Hartford, | Conn. Setting a good example ARCHITECTURAL ENGINEERING AND BUSINESS Part Two Voorhies, Gmelin and Walker, New York City. Engineers: Meyer, Strong and Jones, New York City. Heat- ing © Ventilating Contrar- tors: Baker, Smith & Com- pany, New York City. Architects: ot “Live lwurance..... HE Travelers Insurance Building in Hartford provides ideal indoor working conditions— because it has an ideal system of ventilation. Good ventilation is life insurance— without premiums! The ‘“Traveler’s” sets a good example. In this beautiful building the health of outdoors is brought to the indoor worker. 385,333 cubic feet—over 14 tons—of outdoor air is circulated every minute... air that has been filtered clean... con- trolled air ... warmed to precise temperatures. Twelve Sturtevant “Silentvane” Fans are used . . . five “blowers” and seven "exhausters"— with ca- pacities from 9,800 to 52,000 C.F.M. Sturtevant Ventilating Equipment has enjoyed the endorsement of architects and engineers for many of the most outstanding building achievements. B. F. STURTEVANT Co., Hyde Park, BOSTON, Mass. Plants at: Berkeley, Cal—Camden, N. J.—Framingham, Mass.—Galt, Ontario Hyde Park, Mass.—Sturtevant, Wis. Offices in Principal Cities 4) 4 | CY Stur OVA n А V B е\с aa HEATING-VENTILATING AND POWER PLANT EQUIPMENT
Page 157
THE April, 1929 ARCHITECTURAL FORUM 233 This new small Spencer, with Magazine Feed and Sloping Gable-Grate, is made in three, four or five sections, to supply in direct cast iron column radia- tion 175 to 375 sq. ft. steam, and 290 to 620 sq. ft. hot water. It is made either with or without the enameled steel jacket. Write for specifications and guaranteed capacities. New aid to help you make the modern small home perfect Just announced—ready for delivery May 1st—is this newest member of the Spencer family. It is the smallest of all Spencers, designed and made as a result of a steady and increasing demand for a heater that would supply the luxury of low cost steam, vapor or hot water heat to homes that now use less efficient heat- ing systems; and those are the small homes of America. This new beauty that dots our towns and suburbs flows from the architect’s pen. The small home of today is modern in conception, beautiful in design, and as prac- tical as skill and art can make it. One thing has been lacking to make these new small homes perfect—and that was modern heat at low cost. Now comes this newest Spencer Heater to add that last practical touch which your small homes need to make them perfect. Like all Spencers, this newest heater is made with the Magazine Feed first introduced by Spencer, and with the Gable-Grate that is sloped to let fire burn up-hill. Now your clients—those who buy and build the small homes you design—may have automatic steam or hot water heat at a maintenance cost even lower than the heating systems of the past. All Spencer Heaters burn the small size fuels that are so low in cost, such as No. 1 Buckwheat anthracite, coke, semi-bituminous and graded bituminous coal. For even the smallest home, this new Spencer Heater will provide steam heat in a guaranteed amount at the lowest pos- sible cost for fuel. Spencer Heaters, as you no doubt know, are made both in cast iron sectional and steel tubular types for homes and buildings of any size or character. Write for illus- trations, specifications and guaranteed ratings. Spencer Heater Company, Williamsport, Pa. SPENCER or hot water HEATERS
Page 158
236 ARCHITECTURAL ENGINEERING AND BUSINESS Part Two Ш /Vow that the Cost of clean Air has been brought so low Man learned Man learned to kindle the Use of forced to Keep impur- anal contro! Air Ventilation ity from the ae without Filtration is water he drinks economic MASTE ! INN THERE was a time—only a few years ago—when filtered air for building ventilation was considered impractical because of its cost. Then came the manually cleaned unit filters, first introduced by Midwest, showing definite savings in redecoration Man learned! and maintenance as applied to buildings of the Man learned! ło confine finer sort. Following this came the automatic, self-cleaning filters and a swiftly expanding field of application. But it remained for Mid- 5» west and the discovery of "Controlled Air Flow" to make filtered air available to all types of buildings using forced air ventilation. Today filtered air represents the last word in heating and ventilat- ing progress and is as much a part of our modern civiliza- tion as filtered water and re- frigerated foods. o to keep impur- ity from the food he eats fire within four walls Man learned lo Keep impurily from ihe air he breathes WA, Sebo Man learned to conduct heat from one place to another AD ; Offices in Principal Cities
Page 159
April, 1929 THE ARCHITECTURAL FORUM 237 C О У Е R T Fireplace Construction FIREPLACE IN THE HOUSE OF HUGNES LALLEMENT AT CHALONS-SUR-MARNE, FRANCE. MIDDLE OF XVI CENTURY HE success of a fireplace is not all CoV RT architectural. The method of con- OVER struction is of vital importance. The s REPLACE DAMPERS Write for booklet written for the illustration is the second of a series of Architect, gluing complere йаш interesting European fireplaces. on Covert System of Fireplace Construction. ~- The H. W. COVERT COMPANY, 243 E. 44th St., IN. Y.
Page 160
238 ARCHITECTURAL ENGINEERING AND BUSINESS Part Two SLOW Speed " Long Lifi QUIET OPERATION Quiet operation is vital in every ventilating system ... long life always pays dividends . . . The Sirocco Fan, as improved and refined over a period of thirty years, has always been built on the slow speed principle. It delivers more air per revolution than any other type fan of the same size. In addition to quiet operation, slow speed means freedom from vibration, long life and dependable operation. Complete catalog and technical data may be ob- tained from any American Blower Branch Office . . . without obligation. The Standard Н of the FAN World AMERICAN BLOWER CORPORATION, DETROIT, MICH. CANADIAN SIROCCO CO., LIMITED, WINDSOR, ONT. BRANCH OFFICES IN ALL PRINCIPAL CITIES merican Rlower diirocce-" VENTILATING; HEATING, AIR CONDITIONING, DRYING, MECHANICAL DRAFT AA Ed MANUFACTURERS QF ALL TYPES OF AIR Elo HANDLING EQUIPMENT SINCE 1881 (853)
Page 161
April, 1929 || | ws i i XX —nor can you justly discourage him on the ground of the old-fashioned "experimental period." For underlying the style element in the arrangement of rooms is a modern heating principle which makes Trane concealed heating a genuine engineering achievement. With this equipment, the owner ob- tains a heating efficiency and a flexi- bility of control never possible before. These advantages were inherent in the design of the original Trane Concealed Heater. Today the latest Under- THE ARCHITECTURAL FORUM The Trane Bellows Pack- less Valve The Trane Bellows Radia- tor Trap Window model also arouses the en- thusiasm of the trade as a practical heating unit for universal application. Contractors wanted a complete unit, with nothing extra to buy. Here they have it! Here is a one-man installation, from unloading the truck to screwing on the front panel. And the entire front panel comes off at the turn of a few screws, so they can have access to “the works” at any time. You can look to Trane for the same progressive leadership in concealed heating which has built the reputation 239 Should your client be satisfied with 1919 heating "eio п 1929? 'You can't blame him for wanting the latest style —the Trane Under- Window Concealed Heater of Trane Heating Specialties and other Trane products. The same sort of prac- tical, common-sense improvements have recently been made in the Trane Bellows Packless Valve. Tension ar- rangement to hold valve in position, regardless of vibration—non-rising stem—interchangeable wheel and lever handle—improved appearance—guide to relieve strain on the bellows when opening or closing. Before you recom- mend any part of a heating system except the boiler and piping, investi- gate Trane’s recent developments. THE TRANE COMPANY, (Est. 1885) Dept. 4 —220 Cameron Ave., La Crosse, Wis. Send complete information on modern style in heating. HEAT CONCEALED CABINETS HEATERS PUMPS, UNIT HEATERS, AND HEATING SPECIALTIES Name Address
Page 162
240 ARCHITECTURAL ENGINEERING AND BUSINESS Part Two Designed to give permanent satisfaction— т and it does! Hardinge installations, whether large or small, domestic or industrial, give perfect service and satisfaction year after year. Precision-built in two distinct models — both Domestic and Industrial —in 9 different sizes and combinations, en- able specific treatment for any heating prob- lem. | a Dependable, economi- Above~ PEP - ^ cal, quiet, carefree — Bowman Dairy Co. : ; i fel if 4310 Kenneth Avenue И, DE fh you can safely респу Chicago Ж m == meee Hardinge Fuel Oil Heat Right— uec E for any building "from George Smart А М y g Residence | ў mM il Fire Insurance Patrol bun alow to sky- 1315 Elmdale Ave. | _ Mu : No. 5 Boiler Room g y Chicago - — 1044 Orleans St, Chicago scraper.” HARDINGE FUEL OIL HEAT Hardinge Brothers, Inc. Manufacturers of Precision-Built Machines for 38 Years FACTORY BRANCH: Factory and General Offices: FACTORY BRANCH: CHICAGO 4149 Ravenswood Avenue BOSTON Michigan Ave., at Ohio St. CHICAGO 843 Beacon Street
Page 163
April, 1929 THE ARCHITECTURAL FORUM 241 447 East 57th Street New York City É а ER. Method of installing ROBRAS 20-20's in-the-wall, under-a-window ROM 50 East 72nd Street New York City Primigi ooo j 2 East 70th Street New York City These Extras Eliminated If Original Equipment Had Been m À9 a m гч чь 47 чь Fi as m m m A a area: =a <= ЕЕ = = 297. 297 я wu т ш ш юш wr LOS т Ed " d 7 any a m -2 An — — N each of these New York apartments, ROBRAS 20-20 Radiators were concealed in the walls of the principal rooms. In less important rooms old-fashioned radiators were used, under the mistaken impression that they might bring about possible economies. The error of this conclusion was discovered as soon as the apartments were sold or rented. Practically all of the new owners or lessees demanded ROBRAS 20-20 Radiators, out-of-sight, and out-of-the-way, in the balance of their rooms. You can well imagine the trouble and extra cost this entailed. If ROBRAS 20-20’s had CORPORAT I ONE EAST FORTY-SECOND STREET sF THROUGHOUT been installed throughout originally, both owners and tenants would have been saved the expense and exasperation of changing the existing radiators. Again, supposea case where tenants, edu- cated to ROBRAS 20-20 Radiators, discov- ered the old-fashioned radiators throughout. Think of the complication entailed in chang- ing the existing radiators on the entire job! The safest course today is, at the start, to install ROBRAS 20-20 Radiators in-the-wall, out-of-sight and out-of-the way. Then every one is satisfied. E BRASS RADIATOR ix ; NEW YORK CITY
Page 164
à, a ARCHITECTURAL ENGINEERING AND BUSINESS Part ‘Two cn your clients ask about OIL HEAT Architects, contractors and heating engineers who recommend Williams Oil Heat are assured of having their judgment endorsed by home- owners as sound and wise. Williams Oil-O-Matic heats more homes than any other oil burner—more than 80,000 owners give Williams Oil-O-Matic their whole-hearted approval. They know the efficiency of Oil-O- Matic from practical ex- perience. Entirely Automatic— Thoroughl ly Dependable Efficient—unusually quiet — entirely auto- matic —thoroughly de- pendable and thrifty in the use of its economy fuel, Williams Oil-O- Matic is the master of all domestic heating problems. Controlled by a reliable thermostat that maintains precise temper- atures, Oil-O-Matic gives even, healthful warmth. Readily installed in any heating system. For small homes and bungalows, Williams Dist-O-Matic gives the same dependable, health- ful warmth as Oil-O-Matic for larger homes. Williams Dist-O-Matic is easy to buy and eco- nomical to operate in any heating system, whether hot water,warm air or steam. Your clients may buy any Williams producton easy payment plans. Have you our Oil-O-Matic Architects Manual on file in your office? Write for it today — it will be sent without charge. WILLIAMS Oo MATIC HEATING Bloomington, Illinois Address — V QN т. dde Williams Oil-O-Matic Heating Corporation Gentlemen: Please send me your Architects Manual for Williams Oil-O-Matic installation.
Page 165
April, 1929 THE ARCHITECTURAL FORUM 243 M REID IEEE NUS CEDAT т E] Wall Cabinet Heater ГНЕ Wall Cabinet Heater — built only by Modine—conforms to the most exacting de mands of modern room decoration, but its cost makes it the most economical installation where utility is the prime consideration. Because of the inclined position of its enclosed copper radiator, it extends only a few inches from the wall and is particularly desirable where space economy is necessary. It is the ideal radi ation for smart shops, department stores, offices, hospitals, apartments and homes. Send for your copy Complete information on Modine Cabi- Booklet Modine net Heaters and Modine Wall Type abinet caters . I $ In addition to con- Cabinet Heaters will be sent on request. шүн — = pacity de З a has numerous sugges- MODINE MANUFACTURING COMPANY Cabinet Heaters in the 1718 Racine Street RACINE, WISCONSIN decorative scheme. Originators of COPPER RADIATION Manufacturers of MODINE UNIT HEATERS
Page 166
244 ARCHITECTURAL ENGINEERING AND BUSINESS r———— —a Rockefeller Foundation contribution to the University of Chicago, which real- izes the original intention of including’for this institution a building devoted solely to religion and its exercises. In 1918, Mr. Bertram Grosvenor Goodhue of New York was commissioned as the architect to design the Chapel. Mr. Goodhue’s design for the Chapel placed the tower over the crossing, and after his death in April 1924 before any construc- tion had been started, the University conferred with the Bertram Grosvenor Goodhue Associates, the firm who had undertaken to carry on and complete Mr. Goodhue’s work. | The building as built is from the draw- ings of the Bertram Grosvenor Goodhue Associates which they consider as a modification of Mr. Goodhue's original conception; the tower being entirely re- designed and placed over the transept, and the front elevation and divisioning of ETE E A UNIVERSITY OF CHICAGO CHAPEL BERTRAM G. GOODHUE and BERTRAM G. GOODHUE ASSOCIATES—Architects windows being considerably modified. All of the craftsmanship in this building, including the Skinner organ, is of Ameri- can artisanship, and breathes the spirit of the craftsmanship of the Old World. The design of the Chapel displays the progressive spirit of the architects—the Bertram Grosvenor Goodhue Associates— imbued with the spirit of the master— Bertram С. Goodhue—and portrays in New World fashion, the Gothic tradition of the Old World. Visitors are permitted each day to enter and view the imposing interior; likewise at services on Sunday and evenings during the week when it is especially impressing and soul inspiring. A monument indeed to endowment kindness, and the consummate of church thought and architecture JOHNSON SERVICE CO., MILW AUKEE. WIS. JOHNSON HEAT & HUMIDITY CONTROL * * * The All Metal System > . . . IS INCLUDED IN THE EQUIPMENT OF UNIVERSITY OF CHICAGO CHAPEL The All Perfect Graduated Reg- ulation Of Valves And Dampers * * * The Dual Thermostat (Day & Night) Control Fuel Saving ... 25 to 40 Per Cent Part Two
Page 167
'The design of every building is influenced by FUEL... . . . Even the basement plan cannot be completed until the fuel to be used in the building is determined. If it is Coal—You know what to fig- ure on — receiving the coal, storing the coal, moving the coal to the heating plant, removing the ashes, disposing of the ashes. If it is Gas— There is nothing to do but to bring a pipe into the Base- ment from the gas main — but the cost is high. If it is Oil — The basement plant is much the same as when gas is used. You do not have to provide space for coal and ashes activities. А tank, either in the basement, or under- ground, outside the building contains the fuel supply. Architects’ Manual on Automatic Oil Burners The use of this manual as a guide makes the preparation of the heating. plans and heating specifications a simple task. Installation and Maintenance The May Oil Burner, the tank, and all necessary pipes and automatic controls are installed by authorized May Oil Bur- ner Corporation dealers. THE ARCHITECTURAL FORUM gion Laboratories of the May Oil Proficient in the installation and . bas successfully com Burner Corporation «В Here is the certificate which we present to each individual who has successfully completed a course of instruction in the production laboratories of the May Oil Burner Corpo- ration, at Baltimore, Maryland. This 68-page manual of information for architects on Oil Burners contains text matter, floor plans, sections, and photographs, as well as the complete regulations of the National Board of Fire Underwriters for the installation of Oil Burner equipments. MAY OIL BURNER CORPORATION 3500 E. BIDDLE ST., BALTIMORE, MD. MAY OIL BURNER CORPORATION 3500 E. BIDDLE ST., BALTIMORE, MD. Please send your manual of information for architects to Individual c/o Firm Street. City.
Page 168
REVIEWS OF MANUFACTURERS' PUBLICATIONS THE FIREBRAND KITCHEN EQUIPMENT CO., Chicago. “Firebrand Kitchen Equipment.” Its importance and value. The majority of modern hotels, hospitals, clubs, restau- rants, cafeterias, lunch rooms, etc., possess a highly efficient kitchen equipment, the latest in scientific methods of cook- ing apparatus, which is first in sanitation, neat in its appear- ance, efficient and satisfactory in operation. The Firebrand Kitchen Equipment Company of Chicago has manufactured a gas steamer which produces amazing new cooking results, improved flavor, tenderer food, with less food waste and less gas consumption. Really, it is one of the finest steam- ers on the market. It quickly saves its cost in fuel econ- оту, and is supreme in cooking quality. This catalog issued by the Firebrand Kitchen Equipment Company fully illus- trates Firebrand standardized kitchen equipment, such as, coffee urns, steam tables, urn stands, dish warmers, work tables, coolers, dish tables, —in other words, a fine line of all cafeteria, lunch room, restaurant and hotel equipment. MACOUSTIC ENGINEERING CO, Cleveland. “Macoustic Sound Control." Dependable data on acoustics. Good acoustics, providing clear and distinct hearing in every section of an interior, is of prime importance. The modern theater, with its large spans, high ceilings, distant reflecting surfaces, extensive use of hard plaster ornamenta- tion, large orchestra, powerful organs and varied programs demands a positive and uniform degree of good hearing un- der all audience conditions. Many interiors of modern office buildings are acoustically treated, at great expense, after occupancy because tenants dethand quiet, workable offices, free from distracting noises. The c'atter of typewriters, adding machines and other mechanical equipment, is not only distracting to employes but offensive to patrons. This book- let will explain Macoustic, its engineering service, its applica- tion, and its decorative possibilities and will give other data. CHICAGO PUMP COMPANY, Chicago. “Fire Pumps." An excellent brochure on the important subject of pumps. Because of the heavy responsibility placed upon a fire pump, each part in its makeup must necessarily be of the best. Insurance Underwriters' tests are so severe that only a truly reliable pump will pass examination. Fire pumps are used for reducing fire hazard in office buildings, theaters, hotels, clubs, factories and many other types of buildings. They are also used by municipalities and subdivisions. The primary reasons for installing fire pumps are the protection of life and property; a reduction in insurance rates because of reduced fire hazard. Chicago Pump Company Fire Pumps have met the Underwriters' severe tests, and in fact the "Chicago" Fire Pump was the first ball-bearing fire pump to pass Underwriters’ tests. Typical layout diagrams are shown in this booklet, and a short description of the “Chi- cago" Fire Pumps will quickly show why they are desirable for fire protection work, and why they are so widely used. FLAX.LI-NUM INSULATING COMPANY, Minnesota. *Flax-li-num Insulation." Data on heat conservation. Because of poor or unscientific construction of buildings’ walls and roofs, it has been conservatively estimated that the fabulous sum of $450,000,000 is wasted in fuel every year in the United States. Our present structures are caus- ing annual leakage costs of literally millions of dollars’ worth of heat. The house of the future will be scientifically built from the standpoint of heating. The idea of heat insulation from the standpoint of comfort is primitive, per- haps the most notable of early methods of securing it being use of the “wattle and daub” construction of the New Eng- land colonists, who filled the open spaces between uprights in their houses with a mixture of straw and mud. Primitive methods are still used today, and a degree of comfort is secured by both the Eskimo and the South Sea Islanders by the application of natural insulation principles. In this bulletin one will find data on correct and efficient insula- tion, and the advantages of using Flax-li-num insulation. WALLPAPER MANUFACTURERS’ THE UNITED STATES. Dr. Faber Birren of Chicago, in a recent article in “The Modern Hospital,” has said that it has been demonstrated that color has a definite psychological effect on the sick. The successful application of color demands more than an average amount of attention, particularly as regards its emo- tional demonstrations. There are, according to Dr. Birren, two purposes to be served by the use of color in the hospitals. One of these is to effect a positive reaction on the part of the patient and the other is to create a general atmosphere of cheerfulness for its esthetic and visual appeal. Wal'paper is entering its own as a hospital decorative medium and has been utilized in a number of institutions of this character with thoroughly satisfactory results; and there is every reason to believe that its use will increase. This valuable publication is issued monthly by the Wallpaper Manufac- turers’ Association. It is the latest thing in color printing. ASSOCIATION OF *Wallpaper." THE CORCORAN MANUFACTURING CO., Cincinnati. “Corcoran One-Piece Steel Bathroom Cabinets.” It is needless to say that the bathroom is a place of cleanli- ness and sanitation. Every one of its fixtures should be of the highest and most perfect sanitation and cleanliness. “Corcoran One-Piece Steel Cabinets" are completely de- scribed in this brochure. The primary motive of the manu- facturer has been to provide a line of cabinets radically im- proved and of outstanding superiority over any product of its kind on the market today. These cabinets are drawn in one integral piece of steel,—no cracks, no seams, no welded joints, no raw edges. The beautiful lustrous finish can be kept spotlessly clean with soap and water. Round corners inside and out are first aids to sanitation and cleanliness. The booklet will give all details of the Corcoran One-Piece Steel Bathroom Cabinets, details which interest architects. THE MACOMBER STEEL COMPANY, Canton, О. “Нап- gar Design for Airports." A booklet on the subject. The development of aviation and air transportation has been so extremely rapid for the past few years that it has introduced new problems to the building industry. Now airport owners, cities, towns, transportation companies and private owners are greatly interested in hangars, especially hangar designs for airports. This booklet, which is based upon the economic and efficient use of Massillon Standard- ized Steel Building Products, to meet the individual require- ments of all projects, describes how hangars can be built economically. The Macomber Steel Company, with its standardized “Massillon” products has adapted itself to furnishing a prompt and efficient service in the complete steel requirements for hangars. To fill the need of hangar construction design and to offer its efficiency to airship owners, this "Hangar Design" booklet has been made available and should have wide circulation among architects. WOLFF CO., Chicago. “Modern and Ancient Luxury.” An excellent brochure on fittings for bathrooms. “То such a pitch of luxury have we come that, unless we tread on gems in our bath, we are dissatisfied." Thus spoke Seneca in commenting on the magnificence and luxurious appointments of the palaces of cleanliness and pleasure that were a part of ancient Rome. As a matter of fact, in the early years, while America was struggling, a bath was a rare treat. In the first place, there was no water in the house, and the preparation of the bath was a task that took a long time. The smaller children could sit in the tub, but poor father had to stand up, dip a sponge in the water, which was taken from the backyard pump, and then squeeze it out on his chest. That was a primitive form of shower. Тһеп someone, who was regarded as eccentric, suggested a bath a day. "Impossible," said someone; "shocking," said others; and "it ain't healthy," said some. So even legislators passed a law against so absurd a practice. But it came anyway. This booklet will ask one: “Why be ashamed of your bathroom?” and will describe many ways to beautify it. 246
Page 169
THE ARCHITECTURAL FORUM 247 Home builders are now asking WHICH IS THE BEST OIL BURNER? April, 1929 —instead of SHALL WE INSTALL OIL HEAT? T HAS come to be the exception, І rather than the rule, for ап archi- tect's client to debate the advisability of heating his home with oil. His only question now is, "Which is the best oil burner to install?" We know of no better answer than Electrol’s record of satisfactory serv- ice in many of the country’s finest homes... A fine product serving a fine clientele. Electrol owners know the meaning of ‘oil heat at its best.’’ They know, for the first time, the satisfying com- fort of automatic oil heat, electrically controlled. They have found an oil burner which keeps on operating year after year, with practically no attention whatever. Heating trou- bles are a thing of the past. Such dependability of operation and performance can only come from a combination of engineering prin- ———- 27 LISTED AS STANDARD BY THE UNDERWRITERS' LABORATORIES, AND BEARS THEIR LABEL 7 KNOW ELECTROL BY THE HOMES IT HEATS SOS eS eT ce Д Residence of Mr. Norman B. Comfort, $t. Louis County, Missouri ciples, materials and construction that are right, and from proper in- stallation by dealers who have proven their ability to fit Electrol to each type of heating plant and to service the burner throughout its life. Electrol is All-Electric—Entirely Automatic—and exceptionally Quiet. There is no gas pilot light. None is needed. The entire operation of the burner is under the automatic super- vision of The Master Control which stands watch night and day, like a living sentinel, regulating the flow Jhe OIL BURNER with Fhe Master Control 7 MEMBER OF THE OIL HEATING INSTITUTE of oil, timing the ignition and gov- erning combustion. Electrol is made in models for homes and buildings of all types and sizes. Wherever it is sold, you will find com- plete oil heating service backed by a sound, large and growing manufac- turing organization. We shall be glad to mail description and complete details of this finer oil burner, on request. ELECTROL INCORPORATED 179 Dorcas Street, St. Louis, U. S. A.
Page 170
REVIEWS AND ANNOUNCEMENTS GILLIS & GEOGHEAGAN, 535 West Broadway, New York. “G & С Atlas Method of Handling Sales Transactions.” Appreciation of the value of orderly and architectural ap- pearance in business quarters has brought about quite a number of changes in equipment of department stores. Some years ago the most complete equipment included overhead "carriers" or “conveyors” from sale counters to cashiers’ cages, this system having supplanted use of messengers,— cash boys or cash girls. But this system of carriers, with its overhead wires wholly visible, is now regarded with little favor, and there has come into use the system by which transactions with cashiers are conducted by means of tubes. This large folder explains and illustrates the planning of the cashier's receiving station of a large establishment. It shows the arrangement of files for quick reference to important data; the locations of those who authorize charges to in- dividual accounts; the receiving and dispatching stations; and the stations of the supervisors of different sections. Half- tones from actual photographs show the appearance of these individual departments with their operators at their posts. SHANKLIN MANUFACTURING CO., INC., Springfield, Ill. *Better Awnings." Their effect on a building's appearance. A building seen from the outside, most of the time gives an appearance of bareness and seems to be rather dull, while the interior is well ornamented. All this could be easily overcome by giving a small distinctive and colorful touch to that building or home by adding awnings to windows. That home shall have personality and distinctiveness of character. 'They will keep the house cool in summer and well ventilated. The “Shady-way” awning, which is manu- factured by the Shanklin Manufacturing Co., is a new type of double-purpose awning that operates easily from the in- side, serving as a shade and an awning,—cheerful, beautiful colored awning, that make the home, apartment, hotel or public building sparkle with life and attractiveness and in- sures cool, comfortable well ventilated rooms. Awnings all a modern necessity, especially now when it’s so easy and inexpensive to equip the home or buildings with smart serviceable roller *Shady-way" awnings. This illustrated booklet will tell all about it, and prove that it is a great utility for office structures, hotels, public buildings and homes. NATIONAL LAMP WORKS, Cleveland. “Picture Projec- tion with Mazda Lamps." Their use for motion pictures. 'The use of motion pictures in fields outside of the photo- play house, is becoming widespread. So popular is this form of presentation that, together with slide projection, it has brought about a new technique in education and has become a valuable aid in selling and in home recreation. In the business field, motion pictures of a manufactured product have proved of great benefit in selling, with the result that firms are providing their representatives with motion picture films and projectors. Projectors of the portable type, using either the 35 mm. film or the 16 mm. film, are light in weight and give screen illumination sufficient for this ser- vice. Much fascination of home motion picture entertain- ment is experienced from showing pictures of one's family, friends or children at play and so on. The 35 mm. film is sometimes used for this purpose. To meet the needs of the various fields of motion pictures and stereopticon projection, there has been made a group of lamps especially adapted for these services. Maximum satisfaction is realized when each element in the projection system is designed and adjusted for the incandescent light source. In this bulletin these sub- jects are therefore discussed: (1) The optical principles in the projection of pictures by means of Mazda lamps. (2) The properties of the component optical elements. (3) Pro- jector equipment. The use of Mazda lamps for the projec- tion of motion pictures is attended by numerous advantages. They are simple and economical in operation; they con- sume a minimum amount of electrical energy, and they pro- duce neither fumes nor gases, all being important advantages. John Stafford White is to be addressed at 521 Irving Ave- nue, Glendale, Cal. Carl C. Tallman has opened new offices at 733 West Edwin Street, Williamsport, Pa. H. Silverstein announces the opening of new offices at 191 Joralemon Street, Brooklyn. Frank O. Barber is occupying new offices in the Dead- rick Building, Knoxville, Tenn. Elmer Grey announces the resumption of his practice at 832 West Fifth Street, Los Angeles. _ Arthur J. Widmer & Associates, Inc., announce the open- ing of offices at 4903 Delmar Avenue, St. Louis. William C. Halbert, Jr. announces his removal from 11 North Avenue to 202 North Avenue, New Rochelle, N. Y. Clarence J. Veillette, 1044 Noble Avenue, Bridgeport, Conn., desires the publications and samples of manufacturers. Leonard J. Toole, Builders’ Building, Charlotte, N. C., desires the samples and publications issued by manufacturers. Announcement is made of the dissolution on January 31, 1929, of the firm of Purdy & Davis, 350 Madison Avenue, New York. The Associates of A. L. Pillsbury announce the change of the firm's пате to Lundeen, Hooton, Roozen & Schaeffer, with offices in the People’s Bank Building, Bloomington, Ill. On January 1, 1929, Oren Thomas joined the firm of Proudfoot, Rawson & Souers. The new firm name is Proudfoot, Rawson, Souers & Thomas, and its offices are at 810 Hubbell Building, Des Moines, Iowa. Announcement is made of the dissolution of the firm of Purdy & Davis. Raymond J. Purdy will continue the prac- tice of architecture at 350 Madison Avenue, New York, and Willam H. Davis has opened offices at the same address. Corrections. Page 210 of the advertising section of THE ARCHITECTURAL Forum for February, 1929, carried an illus- tration of the exterior of the chapel recently completed for the University of Chicago. Credit for the designing of the chapel should have been given to Bertram Grosvenor Good- hue and the Goodhue Associates as architects. In the article entitled "Church Organ Installations," by Emil Praeger, of the Office of Mayers, Murray & Phillip, Architects, the illustration on page 449 should have been entitled “Organ Case, Pipes Not Exposed, Chancel Wall, Trinity English Evangelical Lutheran Church, B. G. Good- hue and B. G. Goodhue Associates, Architects." Also, the illustration shown on page 450 should have been entitled "Organ Screen, Pipes Not Exposed, At Rear of Altar, Epworth-Euclid M. E. Church, Cleveland, Mayers, Mur- ray & Phillip and Walker & Weeks, Associate Architects". These captions were transposed through a typographical error in making up the March issue of THe Forum. VAN RENSSELAER P. SAXE, С.Е. Consulting Engineer STRUCTURAL STEEL CONCRETE CONSTRUCTION Baltimore Knickerbocker Building 248
Page 171
April, 1929 THE ARCHITECTURAL FORUM 249 “PROTECTE AGAINST RAIN ++ SNOW ++ MOISTURE Wr that are treated with Sonneborn's Hydrocide Colorless Waterproofing are sealed against every weather condition. More and more architects are adding to the efficiency, life and beauty of their buildings by specifying this permanent water- proofing liquid. Hydrocide penetrates deeply intobrick, stone or cement, depos- iting a true water-repellent and caulking the pores permanently. lt prevents discoloration, thereby preserving wall beauty. Will not run in hot weather or crack in cold, as it contains no paraffin. Let us tell you about the famous buildings that are Hydro- cide-protected. Some other Sonneborn Products LAPIDOLITH—the original concrete floor hardener. LIGNOPHOL—the penetrating preservative for wood floors. CEMCOAT—A tough, durable, washable wall coating that stays white after other paints turn yellow. L. SONNEBORN SONS, inc. 114 FIFTH AVENUE NEW YORK . Colorless =: Waterpoofing
Page 172
INDEX TO ADVERTISING ANNOUNCEMENTS Parr l—ÀncuiTECTURAL DESIGN Acme Brick Сотрапу................. 18 Fiske Iron Works, J. №............. 69 Nashville Нау. Flooring Co.......... 66, 67 ше Flat Glass Company........ 70 Frink: Corporation, The. „ошак 92 National Lead Company....... ca 89 irports а.о ене TIE 26, 27 — Ё National _Terra Cotta Society. $ 10 Aluminum Company of Атегіса...... 93 Georgia Marble Company, The...... New York Galleries, Incorporated..... 47 American Brass Company............ 9 Second Cover x кы 4 American Seating Company........... 50 Guth Company, The Edwin F......... 72 Orange Screen Сошрапу............. 95 American Walnut Manufacturers Asso- Hamlin, Irving СИ M d Mot Бано cocer. Р: ГУТ ацал 2 5 er Hanley Company ...:..... i 1 Pardee Works, The C.. 21 RIS Wie Flooring Company...... Hartmann Sanders isa ex xr .. 60 Pass & Seymour, Inc.. ee, 72 red гоп DIE репи ЖАР у ^ ie Hauserman Company, The E. Portland Cement Associa ion. РРР 16, 17 + п Company, ihe. E Heinz Roofing Tile Co.. M orn Pratt & Lambert, Inc...... SIR S eR 85 : . А iggins & Co., Chas. РЄ m З Bakelite Corporation ................ al pious Со, In Ramp Buildings Corporation.......... 11 Beardslee Chandelier Mfg. Co.. Hope & Sons, Henry Reeves: Co, RObett GQioe..rseseesseeee 68 Best Bros. Keene's Cement Co са Ritter Lumber Company, W. M....... 60 Blank & Company, Frederic.......... Improved Office Partition Co... Roddis Lumber & Veneer Co......... 61 Bloomington Limestone Co. .......... Indiana Limestone Company Russell & Erwin Mfg. Co.............. 14 onded Floors Company, Inc......... Bradley Lumber Company Spo ede н Jacobson & Company................ 52, 53 уйе саша Company. The.... 52 rasco anufacturing Co...... Sargent & Сошрапу.................. 4 Bruce Company, E. L............... 66, bs Kane & Bessünb IuGuweeswisesmeeb 6s Shanklin Manutacturin 98 АНИ d RUD со, Тһе теттери Sheldon Slate Со., Е. 12 Carney Company, The Kensington Mfg. Company..... Shevlin, Carpenter & Clarke C mpany.. 94 5 3 XN br raada Kent. Costikydf. ees ж кәсә» «же SmysersRoyer Co... roce Fourth Cover raa cp] bow Соң Les King Construction Company... Stedman Products Company 64 Circle A Products Grani E © 28 Kittinger Company ............ Stewart Hartshorn Co...... 68 Sicha PGCE, OE OPI а 5 Klein & Co., Inc., Henry..... Stickley, Т; & J. С... 44 Clinton Metallic Paint Co...... 98 М e 3 Columbia Mills, Inc. The 35 Kosmos Portiand Cement Company, In- Stone & Webster, Тас................. 13 Corbin, Bo & Ei. грла а 38 Gorposadtel, essais ese CIR ER ират oe 81 M б s eal Ral = Tennessee Oak Flooring Oa: EENT, 66, 67 Curtis Companies Service Bureau, The 65 Lehigh Portland Cement Company.. ..24, 25 Thorp & Co., Inc., J. H.. HA 46 . Libbey Owens Sheet Glass Co., The.... 71 Todhunter, отара тале 58 Dahlstrom Metallic Door Co........... 101 Long-Bel Lumber Co., The........... 66, 67 Tuttle & Bailey Mfg. Co 55 Davis Extruded Sash Co.... 36 Louisville Cement Co., Incorporated.... 4 DeLong gumara, Company — Le н ora Company ou. e eese 8 U.. 8; Gutta Percha Paint Со... 83 etroit Stee roducts Company. 105 upton’s Sons Co., David.. 107 Dierks Lumber & Coal Co....... 63 Lutton Company, Inc., Wm. 73 Ward Leonard Electric Co............ 75 Driwood Corporation ...... .40, 59 J М Western Pine Manufacturers Association 62 DuPont de Nemours, Inc., it, Llc 110 Macbeth-Evans Glass Company........ 91 Wheeler Osgood Company, The....... 96, 97 Master Builders Company, The........ 7 “White” Door Bed Company, The..... 54 ‚ : 3 pany, Eagle-Picher Lead Company, The...... 3 McKinney Manufacturing Co......... 100 Wickwire Spencer Steel Co........... 58 . . | Modern Bronze Store Front Co....... 15 Federal Cement Tile Company........ 6 Murphy Varnish Сотрапу............ 87 Zouri Drawn Metals Company......... 15 Part 2-—-ARCHITECTURAL ENGINEERING AND BUSINESS Aeron Corporation: « «гааны 232 General Refrigeration Company....... 218 Rail Steel Bar Association........... 220 Albers Sme ia’ e ik Aen General Electric. Company. sax 180 Raymond [onere Pile Company ip merican ower orp = eadin ron отрапу....... . 16 American Brass Company, The........ 147 Hardinge Brothers, Inc........... ee 240 ы РЫ Sales e. Nasen .. 198 American Institute of Steel Construction, Heggie Simplex Boiler Company...... 123 Republic Iron & Steel Co............. 209 TOU 5а алаа аге S асса 208 erg aoc Company, 1nc. 152 166, 167 Richards, Wilcox Mfg. Co.....Second Cover American Laundry Machinery Co., The 173 ome incinerator {хотрапү.......«..... 9а тав iator г 2 American Radiator Сотто. alate: 131, 251 Hubbell, Incorporated, Harvey........ 141 Rome Brass Radiator Corporation. . е ИА American Rolling Mill Company, The.. 165 Imperi à T i z э perial Brass Mfg. Co., The........ 158 Saree (oro TRO. къз укен» 162 еа тле & л ере Гр: 196 Insulite Company, The .............. 219 Cela Wiek Machine Works `1, 200 A Dp Ww Caer Commer 0... a International Nickel Company, The..151, 169 Servel Sales, Inc........... 197 Architectural and Allied Arts Exposition 122 Janette Manufacturing Company...... 162 ot zine A Oain S Pique Th.rd Cas Armstrong Cork and Insulation Company 187 Tenkine Bros. „азза кинза 161 ворде ОРИ с; Dmm AH 156 Automatic Electric, Inc...42 raa 195 Johns-Manville Corporation... 177 PER DE ОБРАВ nes vee DAR . Tohnson Co., S ecu И . 233 Spencer Heater Company........ vee 239 Bude usn Company Seb Soon 196 — Johnson Service Со................. 244 RN P ы tat ME arr any, Es ee eres 75 мтаулех LUE MOTD soa snd cies as хад Bates Expanded Steel Truss Co.. 204 Kalman Steel Сотрапу............... 206 Stecl Frame House Company......... 221 Berger Mfg. Company, The..... 213 Kerner Incinerator Company.... 118 Structural Gypsum Corporation..... 178, 215 Bethlehem Steel Company...... 202 Kewanee Boiler Corporation. ..... 114 Sturtevant Cos B. аньана 234 Bramhall Deane Co....... кекке nns 174 кале TN pim e көө ГЕЯ Brunswick-Balke-Collender Со., The... 191 Sewanee Private Utiities Co...... * r 2 Byers Company, A. М................. 163 Kinnear a Manufacturing Company s mee ood ps Fae Nh Дд Ў di Оек Co: кууз ойк ne V EXC S AUCH d 8 r 239 Carey Company, The Philip............ 185 Trane Co, The 15 Carnegie Steel Company. „каный асир 207 Maddock's Sons Со., Thos............ 157 гел ен „рау, = udi i Carter Bloxonend Flooring Company.. 117 Master Builders Company. The «« 210 Te a 4c as i (0н и 3 m9 Central] Alloy Steel Corporation........ 211 May Oil Burner Corporation .. 245 TURCON, SESE! COMPAN а аканне 113, 199 Chromium Corporation of America..... 148 McQuay Radiator Corporation........ 252 , ы Г & Sans, James Bo wee MEATS SERS 130 Mid-West Air Filters, Incorporated.... 236 ruber Ted y oem E TSS „а-л. 172 ohoes Rolling Mi о. Milwaukee Corrugating Company...... 205 nite tates Gypsum Company....128, 212 Concrete Engineering Co.. 214 Minwax Company, THe ree eed queries 229 United States Rubber Company....... 127 Concrete Reinforcing Steel Tustitute. 220 Modine Manufacturing Company...... 243 U. S. Mineral Wool Company........ 158 Concrete Бе EO quee: Vers s T ` 176 Цар loor Cós Ойу уыз э эла жаа 201 Zonsoli d Ashcro ancock Co., Inc. Moulen D. ааыа кинала SR 149 Van Range Co., The John c. 195 Covert Company, The Н. W........... 237 Monnerat Hardware: Coceres yamane 144 Cowing Pressure Relieving Joint Co... 170 Nash Engineering Co., The......... .120, 183 Моге Manufacturing Co., "The. dE ган b ae m таа ae Lt diner гай s National | oie Products Corporation 142 utler Mai ute Co пе.......... National Fireproofing Company 111 ; 7 M —— National Steel Fabric Company. -. 203 Wasmnth- Bindicott Company t Dixon Crucible Company, Joseph...... 139 adi Weber Costello Co.......... E Donee Stoke COSI eus essais. i 224 Rout Warren oir Metal Co. ania Ar M Pump. Сотрайу гаиа a аә 170 ouglas Coy The Johnweececcse etre n 154 ыш ылда E estinghouse Electric & Manufacturing Dunham Co., С Ass 231 ; є Company «ала Fourth Cover 1 193 Duraflex Company, The s.e 210 Otis Elevator Соптрапу.............. 200 Wickwire Spencer Steel Co....... i i 200 Duriron Company, The......5..-. e 168 Pecora Paint Co... eese 198 cwm Oil-O-Matic Heating Corpora" - Electric Storage Battery Company The 121 Peerless Unit Ventilation Co., Inc...... 224 w МИЛ. aaan а Батаа ө Өлөн 215 , Petrol ut s ji Sa ood Conversion Company.. 130 Electrol, Inc., of Missouri. 247 eHoleum. Беа and: Mower BL ae. 228 Wolk Company sissies comers ER 153 Fitzgibbons Boiler Co.. Inc... 224 Pfaudler Company, ТВе,.......„ 174 Frigidaire Corporation ...... 126 Pick-Barth Companies, The Albert 125 York Ice Machinery Corporation...... 116 Fulton Sylphon Company, The.. 189 Pierce, Butler & Pierce Mfg, Corp.. 133 Youngstown Sheet & Tube Co., The... 129
Page 173
April, 1929 YES The Vital part of the THE ARCHITECTURAL FORUM UNIT HEATER que success of the Unit Heater depends almost entirely upon its heating surface—and it is for this reason that the leading engineers are selecting Arcoblast Heaters. From a careful study of its wide variety of applications, both Unit Heater manufac- turers and Heating engineers have found Arcoblast meeting the most exacting demands. These five outstanding features recommend Arcoblast for all types of Unit Heater work: 1.—Rugged Unit Design. 2.—No Soldered Steam Backed Joints. 3.—Non-Corrosive. 4—Ample Tube Steam Carrying Capacity. s.—Minimum Weight Without Impairing Strength. The heater is composed of staggered rows of metallicly attached fin-wound copper tubes expanded into two cast-iron tube sheets which, with the tapered design cast-iron header bodies flange-connected to the tube sheets, form the supply and return headers. The copper tubes are three-quarters inch outside diameter with a copper, helical-wound, flat, continu- ous fin three-eighths inch in depth, metallicly attached to each tube. The materials of construction, copper for tubes and fin and cast-iron for headers, offer a product which is non-corrosive. Heaters are furnished in two types as follows: Standard Type for steam pressure to 50 pounds. High pressure Type for steam pressures to 200«pounds. Write today for complete engineering data on this remarkable Unit Heater heating surface. AMERICAN RADIATOR COMPANY 816 So. Michigan Avenue, Chicago 40 West 40th Street New York
Page 174
252 ARCHITECTURAL ENGINEERING AND BUSINESS Part Two Fine Enough for Luxurious Apartments —Inexpensive Enough for Modest Homes Among the newer, fine buildings for which McQuay Cabinet Radiators have been selected, is this luxurious ‘‘Co-Op,”’ designed by Reichert & Finck for 5421 Cornell Ave., Chicago. Yet you will find McQuay Cabinet Radiators equally as popular for heating modest homes. Owners of buildings have discovered that their unobtrusive beauty immediately appeals to buyers and tenants actually helping to sell or rent apartments and houses. Yet their cost is seldom more, and often less, than for ordinary radiators with their necessary separate covers or shields. Because they send the heated air out into rooms in a horizontal direction, they provide the circulation so necessary to quick, effective heating. This helps to reduce heating costs. A humidifying pan (inside the cabinet) gives the heated air the moisture needed for health and comfort. On your next job—figure McQuay MSQUAY RADIATOR CORPORATION General Sales Office: Pure Oil Building, Chicago New York: 2148 Graybar Bldg. Boston: 10 High St. Cleveland: 291 E. 149th St Newark, N. J.: J. F. McLaughlin Co., 738 Broad St. Pittsburgh: Bushnell Mach. Co., Century Bldg. CQUAYy Cabinet rA DIATOR
Page 175
: \»лоипсәт.... 100 YEAR GUARANTEE on CAST TRON SOIL PIPE if and Fit lings \ } FN PERMANENT PIPE ASED upon reliable data covering the service record of cast iron soil pipe over a period of ei five centuries, together with all scientific in- formation available regarding its longevity, and to demonstrate their unlimited faith in its almost ever- lasting qualities, the manufacturers announce their willingness to guarantee it for one hundred years, or for the life of any building in which it is used. Cast iron soil pipe is recommended in connection with buildings and guaranteed for the following defi- nite purposes: SOIL LINES WASTE LINES VENT LINES LEADER LINES HOUSE DRAINS HOUSE SEWERS ROOF DRAINS Guarantees will be made between manufacturers and building owners direct, and will cover specific installations. #—-————— — — ———=апопз. TOIL PIPE ASSOCIATIO BIRMINGHAM, ALABAMA TRON PIDE уу ANY BUNDEL у Ñ SA P THE GREATEST TRIBUTE EVER PAID ANY PIPE + Ф
Page 176
afety Switches . the point of entry for кка electrification The future holds a promise of greater usefulness, greater return on investment, for the building that is electrified for today and for tomorrow. And electrifi- cation should start where your electrical service enters the building. There—at the point of entry —Westinghouse Safety Switches give you control, give you pro- tection, give you capacity for every electrical requirement. Protect the equipment you install, and those who use it, with Westinghouse Safety Switches. For every building requirement there is а Westinghouse Safety Switch, backed by Westinghouse skill in designing electrical equipment; staunchly built to take care of the job for which it was designed. Write for a copy of Catalog 282, listing the com- plete Westinghouse Safety Switch line. WESTINGHOUSE ELECTRIC & MFG. COMPANY SAFETY SWITCH SECTION MANSFIELD WORKS MANSFIELD, OHIO Westinghouse Complete electrification for modern buildings їйї. "Ээ ә НЕ 440 VOLTS 220 VOLTS Westinghouse equipment for buildings includes: Circuit Breakers Panelboards Elevators Safety Switches Fans Fuses Insulating Materials Lamps Lighting Fixtures Turbines Motors and Control Transformers for Ventilating Sys- Watthour Meters tems, Pumps, etc. |’ Water Heaters he Solar Glow Heaters Ranges Switchboards Westinghouse Electrification Appliances Apparatus —-Wiringz-- The Sign of a а ащ Westinghouse Dealer