Learn · Network Analysis For Mines And Mineral Engineering
Lecture 8 of 22WEEK 2
Lecture 08 : Late start and late finish times algorithm
Prof. Kaushik Dey · IIT Kharagpur
Credits and licence
- From
- Network Analysis For Mines And Mineral Engineering, IIT Kharagpur (at NPTEL)
- Licence
- CC BY-NC-SA, as NPTEL states it. Non-commercial use only.
- Attribution
- NPTEL states: "Distributed under Creative Commons Attribution-ShareAlike / CC BY - NC - SA", beside a BY-NC-SA badge.
- Who can watch
- Tweens profiles and older. How courses are placed
All the lectures
- Lecture 01 : Introduction to Network Analysis
- Lecture 02 : Introduction to network and some terminology
- Lecture 03 : Construction of network
- Lecture 04 : Introduction to activity on node diagram and comparison with arrow diagram
- Lecture 05 : Rules of dummy job,redundancy & cycles
- Lecture 06 : Critical path and its calculation
- Lecture 07 : Algorithm for critical path early start and early finish times
- Lecture 08 : Late start and late finish times algorithm
- Lecture 09 : Understanding the slack
- Lecture 10 : Examples of slacks and calculation of AON network
- Lecture 11 : Project due dates and earliest completion time examples
- Lecture 12 : CPM model and cost modelling
- Lecture 13 : Lowest cost schedule and optimum schedule
- Lecture 14 : Crashing and stretching of jobs
- Lecture 15 : Crashing and stretching of jobs (Contd.)
- Lecture 16 : Introduction to PERT
- Lecture 17 : Expected length of critical path calculation with examples
- Lecture 18 : Probability of completion of a project
- Lecture 19 : Event oriented project management
- Lecture 20 : Algorithm and computer program
- Live Session 25-03-2022
- Live Session 17-04-2025