Learn · Introduction to Lean Construction - Module II: Advanced Concepts and Tools
Lecture 71 of 85Week 4
Process Mappping & Waste Identification (DO) through VSM in Design Process
Prof. Koshy Varghese, Prof. N. Raghavan and Prof. Ganesh Devkar · IIT Madras
Credits and licence
- From
- Introduction to Lean Construction - Module II: Advanced Concepts and Tools, IIT Madras (at NPTEL)
- Licence
- CC BY-NC-SA, as NPTEL states it. Non-commercial use only.
- Attribution
- NPTEL states: "Distributed under Creative Commons Attribution-ShareAlike / CC BY - NC - SA", beside a BY-NC-SA badge.
- Who can watch
- Tweens profiles and older. How courses are placed
All the lectures
- Flow in Production Systems - Part 1
- Flow in Production Systems - Part 2
- Process Performance Parameters - Part 1
- Process Performance Parameters - Part 2 - Discrete Event Simulation (DES) - ExtendSim
- Process Performance Parameters - Part 3: Throughput & Capacity
- Process Performance Parameters - Part 4: Cycle Time
- Process Performance Parameters - Part 5: Work In Progress (WIP)
- Process Performance Parameters - Part 6: Utilization
- Process Performance Parameters - Part 7: Bottleneck, Raw Process Time, Critical WIP, Takt Time
- Process Performance Parameters - Problem 1 & Problem 2
- Push Production System
- Pull Production System
- Process Analysis for Waste Minimization
- Engineering Procurement Construction Process
- Pull Planning Case Studies in EPC
- Introduction to Variability
- Impact of Variability on Process Parameters
- Impact of Variability - Balanced Process
- Impact of Variability - Unbalanced Process
- Upstream - Downstream Variability
- Variability Management - Approaches
- Introduction to Location Based Management System (LBMS)
- Introduction - Scheduling Methods
- Application of Location Based Planning
- Location Breakdown Structure (LBS)
- Flow lines and Identification of Wastes
- Case Studies
- LBMS Tutorial - Exercise 1 - Part1 - Finishing Works - Process
- LBMS Tutorial - Exercise 1 - Part2
- LBMS Tutorial - Exercise 1 - Part3
- LBMS Tutorial - Exercise 1 - Part4
- LBMS Tutorial - Exercise 1 - Analysis from Flow Perspective
- LBMS Tutorial - Exercise 2.A
- LBMS Tutorial - Exercise 2.B & C
- LBMS Tutorial - Exercise 2.C
- LBMS Tutorial - Exercise 2 - Analysis from Flow Perspective
- Construction Contracts and Lean Construction Versions
- Typical Problems in Construction Contracts
- Contracts with Lean Concepts: "Relational" Contracts
- Integrated Project Delivery/ Development (IPD) - Part 1
- Integrated Project Delivery/ Development (IPD) - Part 2
- Integrated Project Delivery/ Development (IPD) - Part 3
- Integrated Project Delivery/ Development (IPD) - Part 4
- Project Alliance Contracting Model (PACM) - Part 1
- Project Alliance Contracting Model (PACM) - Part 2
- Project Alliance Contracting Model (PACM) - Part 3
- Lean Project Delivery System (LPDS) - Part 1
- Lean Project Delivery System (LPDS) - Part 2
- Lean Project Delivery System (LPDS) - Part 3
- Lean Project Delivery System (LPDS) - Part 4
- Target Value Delivery (TVD) - Part 1
- Target Value Delivery (TVD) - Part 2
- Target Value Delivery (TVD) - Part 3
- Target Value Delivery (TVD) - Part 4
- Summary
- Lean in Design
- Design Process & Importance of Design Process
- Design & Value
- Conventional Project Delivery & Design
- Target Value Delivery
- Lean Tools for Design
- Choosing by Advantages (CBA) - Decision Making
- Choosing by Advantages (CBA) - Principles, Definitions & Steps
- Choosing by Advantages (CBA) - Alternatives in the Design Process
- Choosing by Advantages (CBA) - Exercise - Part 1
- Choosing by Advantages (CBA) - Exercise - Part 2
- Choosing by Advantages (CBA) - Case Study - Part 1
- Choosing by Advantages (CBA) - Case Study - Part 2
- Process Mappping & Waste Identification through VSM - Complexity of Design Process
- Process Mappping & Waste Identification through VSM in Construction
- Process Mappping & Waste Identification (DO) through VSM in Design Process
- Process Mappping & Waste Identification (WN) through VSM in Design Process
- Process Mappping & Waste Identification (TIME) through VSM in Design Process
- Applying Value Stream Mapping in Architectural Design Process
- Process Mappping and Waste Identification through VSM - Swimlane Diagram
- Applying VSM in Design Process - Case Study - Current State VSM
- Applying VSM in Design Process - Case Study - Lean Tools for Improvement
- Applying VSM in Design Process - Case Study - Future State VSM
- Information Management Tools - Design Documentation & Information Flow
- Information Management Tools - Design Structure Matrix - Part 1
- Information Management Tools - Design Structure Matrix - Part 2
- Information Management Tools - Design Interface Management/ Dependency Structure Matrix (DSM)
- Information Management Tools - Design Construction Interface - Pull Planning - Case Study
- Information Management Tools - Generative Design
- Acknowledgement