    6.2: Pipeline Construction Steps

    Video: Typical Stages of Pipeline Construction (3:25)

    After a pipeline operator obtains the required permits and satisfies the regulatory requirements, construction of the pipeline may begin. Surveying of the intended route is completed, both aerial and land based, to ensure that no surprises arise during actual assembly of the pipeline.

    Piping being installed in ground
    Pipeline being installed.

    Dave Messersmith

    Pipeline Construction Process

    • Planning route, surveying
    • Permitting
    • Acquiring the right of way (ROW)
    • ROW is cleared
    • Topsoil removed, trench dug
    • "Stringing Pipe"
    • Pipe is welded and contoured
    • Pipe is lowered into trench
    • Pipe is placed underground and site is restored

    This page titled 6.2: Pipeline Construction Steps was last modified on Thu, 02 Sep 2021 22:41:58 GMT and is shared under a CC BY-NC-SA 4.0 license and was authored, remixed, and/or curated by Marcellus Matters (John A. Dutton: e-Education Institute) via source content that was edited to the style and standards of the LibreTexts platform.