11: Cellular Manufacturing

Beyond Lean: Simulation in Practice · LibreTexts

0%

Contents

    Text

    Size
    100%
    Theme
    Typeface
    Line length
    Spacing

    Read aloud

    How

    Speed: 1×
    Light up
    Highlight

    Symbols: Mulberry Symbols, © 2018–2026 Steve Lee, CC BY-SA 4.0 (licence, the set), the site's own copies.

    From LibreTexts, under CC BY-NC-SA, as the source states it; its equations are written in TeX, which the PDF shows typeset. This page at LibreTexts.

    11: Cellular Manufacturing

    • 11.1: Introduction
    • 11.2: Points Made in the Case Study
    • 11.3: The Case Study1
      This application study has to do with validating the design of a new manufacturing cell particularly with respect to staffing requirements as well as work in process inventory levels and throughput. An initial value for the number of workers required as well as an initial assignment of workers to workstations can be determined by standard, straightforward cellular manufacturing computations.
    • 11.4: Summary


    This page titled 11: Cellular Manufacturing was last modified on Fri, 05 Mar 2021 08:18:38 GMT and is shared under a CC BY-NC-SA license and was authored, remixed, and/or curated by Charles R. Standridge.