Continue to monitor process performance after qualification and PPQ. Changes in materials, equipment, software, facilities, methods, or process settings require assessment. Additional qualification, validation, studies, or regulatory action may be needed according to the potential effect. Not every change automatically requires full revalidation.
A deviation is a departure from an approved instruction, requirement, or expected condition. A nonconformity is a failure to meet a requirement and can involve a material, product, process, document, or system. OOS describes a particular test result outside its criteria. These terms are related but have different scopes.
Control potentially affected material while the issue is assessed. Document the event, immediate actions, investigation, cause where supported, impact on other batches or data, disposition, and CAPA when needed. Evaluate effectiveness rather than assuming that retraining alone fixes every problem.
Possible dispositions include release when justified and permitted, rejection, return, destruction, or appropriately authorized reprocessing. The available options depend on the product and requirements. Raw materials are not automatically returned, and a product must not be reprocessed merely to avoid an unfavorable result without an approved, justified approach.
Good planning and validation reduce risk but cannot guarantee that unplanned events never occur. A reliable quality system detects problems, responds appropriately, preserves accurate evidence, and uses what is learned to maintain control.