Joseph M. Juran’s quality trilogy describes three related management processes: quality planning, quality control, and quality improvement. Each addresses a different question. What should the process accomplish? Is it performing as intended? How can it achieve a better level of performance?
Quality planning identifies customers, determines their needs, and designs products and processes to meet those needs. Quality control evaluates actual performance against established goals and responds to differences. Quality improvement changes the process to overcome recurring limitations. Restoring a process after a disruption is important, but it may only return performance to the previous level.
In the medium company, planning includes deciding which information customers need on a label, how readable it must be, and how it will remain attached during expected handling. Employees need a practical way to determine whether those requirements are met. A vague instruction to make labels look good is difficult to apply consistently.
Control includes checking print settings, verifying required information, and following an established response when labels do not meet requirements. If the printer runs out of ink, correcting that immediate problem may restore normal operations. It does not necessarily resolve smearing that has occurred for months.
A chronic problem is a recurring problem that continues under the usual way of working. Improvement may require examining label materials, handling conditions, equipment capability, and work instructions together. A team that only replaces rejected labels can remain busy while the underlying loss continues.
The trilogy also applies to services. A laboratory plans how to receive samples, controls routine intake, and improves a recurring delay. These management processes are broader than the work of a department named QC. Planning involves customer needs, operations, resources, and leadership decisions throughout the organization.
Once improvement establishes a better way of working, control helps sustain it. Planning may also need revision as customer needs, materials, or services change. The trilogy describes connected management work, rather than three steps performed only once.
This page titled 3.4: Juran’s trilogy- planning, control, and improvement was last modified on Fri, 06 Nov 2026 09:28:27 GMT and is shared under a CC BY-SA 4.0 license and was authored, remixed, and/or curated by Emalee MacKenzie.