A manufacturing team intends to use a computerized controller to monitor a bioreactor, record temperatures against the correct batch identifier, and alert operators if temperature stays above a defined limit. For this hypothetical test, the alarm is set to trigger above 38.0 °C after 60 continuous seconds. The values are example acceptance criteria for the controller.
Record the controller version, configuration, and test batch identifier. Use an approved simulation or test setup to supply known temperature inputs. Define the expected alarm, timing, and record behavior before testing. Use a separate check with a calibrated reference to verify the installed measurement chain.Suppose the controller shows the sensor fault but continues storing the last valid value without flagging it. Mark the test as failed and retain the exported trend and event log. After the team corrects the issue, repeat the disconnect test and check normal recording and alarm timing. Passing these tests supports use of the controller for the defined functions. Separate process validation evidence is needed to show that the manufacturing process consistently produces acceptable product.

This page titled 14.14: Example - Testing a Bioreactor Temperature Control System was last modified on Sun, 08 Nov 2026 23:49:41 GMT and is shared under a CC BY-SA 4.0 license and was authored, remixed, and/or curated by Emalee MacKenzie.
The book could not be loaded just now.