Early Opening of Full-Depth Concrete Repairs
Fast-track full-depth concrete pavement repairs are introduced. Major considerations are discussed: planning to assess the need for fast-track construction and the production rates for each maintenance activity; scheduling tasks to prevent bottlenecks; and evaluating the strength characteristics of the placed concrete to determine the highway opening time. Methods of full-depth repair and onsite concrete quality control are shown briefly. SHRP tape no.32.
Human-made No record of this work says a model made it. What this means.
- Archive
- Internet Archive, in FedFlix: US government films
- Licence or status
- CC0 1.0, as the Internet Archive states it.
- Credit
- Federal Highway Administration
- Language
- English
- Who can watch
- The archive gives no rating. Invisible Network shows it to Tweens profiles and older, judged from its collection and subjects. How films are placed