Educational198914 min320×240

File Cap Replacement

Oregon Department of Transportation

Education

At the Internet Archive

Clips are not offered for this film: a public-domain mark that nothing bears out (no year, or a year no US term has left).

Not offered: its uploader or archive marks it public domain, and nothing the site holds bears that out (its record gives no year, or a year from 1978 on, which no US term has left), so where it is free is not known. Unclear is not offered. Open it at the Internet Archive.

About

Oregon Department of Transportation

Video VH-121

File Cap Replacement

This video demonstrates the replacement of a timber pile cap under a concrete deck, wood stringer bridge on wood piling. An actual project was taped. Damage to the original timber structure is explained, and the replacement process is shown: setting and hanging the needle beam staging and deck area for the work crew, placing pile clamps, rolling a false cap into place, and jacking the bridge deck, with commentary by maintenance supervisors. Workmen under the bridge coordinate with a crane operator on the bridge deck to remove the old pile cap and install the new one.

Human-made No record of this work says a model made it. What this means.

Archive
Internet Archive, in FedFlix: US government films
Licence or status
CC0 1.0, as the Internet Archive states it.
Credit
Oregon Department of Transportation
Language
English
Who can watch
The archive gives no rating. Invisible Network shows it to Tweens profiles and older, judged from its collection and subjects. How films are placed