Learn · CERN

Talk21 min

Hybrids Acceptance Tools for the CMS Phase Two Tracker Upgrade

Irene Mateos Dominguez · CERN

Watch At CERN

About

Up to fifty thousand front-end and service hybrids are required for the CMS Tracker Phase Two Upgrade. These hybrids, which are built on carbon fibre stiffened circuits and contain several flip-chip ASICs, will be glued in module structures, making repairs almost impossible. Due to their complexity, testing within production is a very important aspect. A multiplexed testing infrastructure, based on custom crates and test cards will be presented. This testing hardware is supported by software tools to enable the exhaustive verification of hybrids at the manufacturing sites and for their acceptance within the collaboration..

0:00:00 Slide 1

0:02:06 Slide 2

0:04:12 Slide 3

0:06:18 Slide 4

0:08:23 Slide 5

0:10:29 Slide 6

0:12:35 Slide 7

0:14:40 Slide 8

0:16:46 Slide 9

0:18:52 Slide 10

0:20:58 Slide 11

The talk

  1. Hybrids Acceptance Tools for the CMS Phase Two Tracker Upgrade 2021-09-24 · 21 min · CERN's player

Credits and licence

Institution
CERN
Department
Conferences
Speaker
Irene Mateos Dominguez
Year
2021
Language
English
Subjects
Physics, Engineering
Source
CERN
Licence
CERN, as CERN states it. CERN's terms
Attribution
© CERN. CERN provides its audiovisual media free of charge for educational and informational use, credited to CERN; this lecture is shown in CERN's own player.
Who can watch
CERN gives no rating. Invisible Network shows it to Tweens profiles and older, judged from what the source says about it. How courses are placed