Learn · CERN

Talk20 min

CMS Phase-2 data acquisition, clock distribution, and timing: prototyping result and perspectives

Jeroen Hegeman · CERN

Watch At CERN

About

The CMS detector will undergo a major upgrade for Phase-2 of the LHC program: the HiLumi LHC. The Phase-2 CMS back-end electronics will be based on the ATCA standard, with node boards receiving the detector data from the front-ends via custom, radiation-tolerant, optical links. An ATCA hub board, the DAQ and Timing Hub, will provide the interface between the back-end nodes and the central Trigger, Timing, and DAQ systems. This paper presents the progress on the development towards the DTH design. Measurements are presented showing the performance achieved for all main DTH tasks: clock distribution, DAQ throughput, and hub-to-node networking..

0:00:00 Slide 1

0:01:59 Slide 2

0:03:58 Slide 3

0:05:57 Slide 4

0:07:55 Slide 5

0:09:54 Slide 6

0:11:53 Slide 7

0:13:51 Slide 8

0:15:50 Slide 9

0:17:49 Slide 10

0:19:48 Slide 11

The talk

  1. CMS Phase-2 data acquisition, clock distribution, and timing: prototyping result and perspectives 2021-09-21 · 20 min · CERN's player

Credits and licence

Institution
CERN
Department
Conferences
Speaker
Jeroen Hegeman
Year
2021
Language
English
Subjects
Physics, Engineering
Source
CERN
Licence
CERN, as CERN states it. CERN's terms
Attribution
© CERN. CERN provides its audiovisual media free of charge for educational and informational use, credited to CERN; this lecture is shown in CERN's own player.
Who can watch
CERN gives no rating. Invisible Network shows it to Tweens profiles and older, judged from what the source says about it. How courses are placed