Learn · CERN

Talk22 min

Power, Readout and Service Hybrids for the CMS Phase-2 Upgrade

Angelos Zografos · CERN

Watch At CERN

About

The CMS Tracker Phase 2 Upgrade modules integrate DCDC powering stages and an optical transceiver to power and control the front-end hybrids. The strip-strip (2S) module contains a Service Hybrid (2S-SEH) with two stage DC-DC power conversion, an lpGBT with optical interface (VTRx+), high voltage biasing and temperature sensor ports. The pixel-strip (PS) module utilizes a separate two stage DCDC converter circuit (PS-POH) and a Readout Hybrid (PS-ROH) containing the communication interface. The design and performance of these three hybrids and their integration in their respective modules will be presented..

0:00:00 Slide 1

0:02:12 Slide 2

0:04:23 Slide 3

0:06:34 Slide 4

0:08:46 Slide 5

0:10:57 Slide 6

0:13:08 Slide 7

0:15:20 Slide 8

0:17:31 Slide 9

0:19:42 Slide 10

0:21:54 Slide 11

The talk

  1. Power, Readout and Service Hybrids for the CMS Phase-2 Upgrade 2021-09-20 · 22 min · CERN's player

Credits and licence

Institution
CERN
Department
Conferences
Speaker
Angelos Zografos
Year
2021
Language
English
Subjects
Physics, Engineering
Source
CERN
Licence
CERN, as CERN states it. CERN's terms
Attribution
© CERN. CERN provides its audiovisual media free of charge for educational and informational use, credited to CERN; this lecture is shown in CERN's own player.
Who can watch
CERN gives no rating. Invisible Network shows it to Tweens profiles and older, judged from what the source says about it. How courses are placed