Within the frame of our LHC Injector Upgrade program, CERN decided to build two new amplifiers of 2 MW cw operating at 200 MHz. These amplifiers are based on Solid State technology, and use Cavity Combiner systems to reach the required power levels. Availability being the key word with respect to beam operation, the amplifier architecture choices will be explained. After a review of the challenges we had to face during the design phase of this new amplifiers, the difficulties of such a large production, as well as the commissioning and the performances obtained during the first years will be presented. With respect to global efficiency, hints to improve the wall-plug efficiency with a large RF amplifier will also be proposed..

0:00:00 Slide 1

0:03:59 Slide 2

0:05:35 Slide 3

0:06:48 Slide 4

0:14:01 Slide 5

0:15:27 Slide 6

0:16:47 Slide 7

0:17:47 Slide 8

0:22:11 Slide 9

0:23:42 Slide 10

0:25:05 Slide 11

The talk

  1. CERN SPS RF SSPA, from design to operation 2022-09-12 · 1 h 12 min · CERN's player

Credits and licence

Institution
CERN
Department
Radio-Frequency
Speaker
Eric Montesinos
Year
2022
Language
English
Subjects
Art, architecture and design
Source
CERN
Licence
CERN, as CERN states it. CERN's terms
Attribution
© CERN. CERN provides its audiovisual media free of charge for educational and informational use, credited to CERN; this lecture is shown in CERN's own player.
Who can watch
CERN gives no rating. Invisible Network shows it to Tweens profiles and older, judged from what the source says about it. How courses are placed