Aside from the EMC Regulatory compliance testing that has been described, other testing is done by the hardware team.
Initial Bring-up
When the system printed circuit board assembly arrives from the prototype assembly facility, the PCB designer will take it to the hardware lab and start the "bring up" process by following steps like the following:
- Visual Inspection: For this step, no power is applied to the board. Check for any visible issues such as damage to the edges of the PCB, possible board delamination, scratches across visible PCB traces, bridges between copper traces, solder bridging (adjacent solder joints have solder that melted together), board bowing, problems with drilled through-holes, cold joints (solder did not completely melt), tomb-stoned components (an end of a component has lifted off its solder pad), incorrect components, incorrectly mounted components, or open pins.
- Physical checks: For this step, no power is applied to the board. Check continuity of power traces from power rails to integrated circuits.
- Power Supply Bring-Up: Ensure the board's power supply is safe and within limits. In this step, power is applied to the board. Check the power supply voltage polarity. Do a temperature check to assess whether there might be a short circuit. Check power rail voltages.
- Functional Testing: Verifying the board's ability to process data and communicate with other components.
- Debugging.
HALT Testing
A highly accelerated life test (HALT) is a stress testing methodology for enhancing product reliability in which system prototypes are stressed to a much higher degree than expected from actual use in order to identify weaknesses in the design or manufacturing of the product.[1]
HALT can be effectively used multiple times over a product's life time.
- During product development, it can find design weakness earlier in the product life cycle when changes are much less costly to make. By finding weaknesses and making changes early, HALT can lower product development costs and reduce time to market.
- When HALT is used at the time a product is being introduced into the market, it can expose problems caused by new manufacturing processes.
- When used after a product has been introduced into the market, HALT can be used to audit product reliability caused by changes in components, manufacturing processes, suppliers, etc.[1]
What is HALT Testing
Highly accelerated life testing (HALT) techniques are important in uncovering many of the weak links of a new product. These discovery tests rapidly find weaknesses using accelerated stress conditions. The goal of HALT is to proactively find weaknesses and fix them, thereby increasing product reliability. Because of its accelerated nature, HALT is typically faster and less expensive than traditional testing techniques.
HALT is a test technique called test-to-fail, where a product is tested until failure. HALT does not help to determine or demonstrate the reliability value or failure probability in field. Many accelerated life tests are test-to-pass, meaning they are used to demonstrate the product life or reliability.
It is highly recommended to perform HALT in the initial phases of product development to uncover weak links in a product, so that there is better chance and more time to modify and improve the product.
HALT uses several stress factors (decided by a Reliability Test Engineer) and/or the combination of various factors. Commonly used stress factors for electronics and mechanical products are:
- temperature,
- vibration, and
- humidity.
Other factors can include voltage, current, power cycling and combinations of them.[1]
HALT procedures
Environmental stresses are applied in a HALT procedure, eventually reaching a level significantly beyond that expected during use.
The stresses used in HALT are typically:
- hot and cold temperatures,
- temperature cycles,
- random vibration,
- power margining, and
- power cycling.[1]
The system under test is in operation during HALT and is continuously monitored for failures. As stress-induced failures occur, the cause should be determined, and if possible, the problem should be repaired so that the test can continue to find other weaknesses.
HALT Test Chamber
A specialized environmental chamber is required for HALT.
A suitable chamber also has to be capable of applying pseudo-random vibration with a suitable profile in relation to frequency. The HALT chamber should be capable of applying random vibration energy from 2 to 10,000 Hz in 6 degrees of freedom and temperatures from -100 to +200°C. Sometimes HALT chambers are called repetitive shock chambers because pneumatic air hammers are used to produce vibration. Test fixtures must transmit vibration to the system under test.
The chamber should also be capable of rapid changes in temperature, 50°C per minute should be considered a minimum rate of change. Usually high power resistive heating elements are used for heating and liquid nitrogen (LN2) is used for cooling.
The network system under test must be monitored so that if the equipment fails under test, the failure is detected.
Monitoring is typically performed with thermocouple sensors, vibration accelerometers, multi-meters, and data loggers.
Common causes of failures during HALT are:
- poor product design,
- workmanship, and
- poor manufacturing.
Failures to individual components such as resistors, capacitors, diodes, and printed circuit boards occur because of these type of issues. Failure types found during HALT testing are associated with the infant mortality region of the reliability bathtub curve as shown in Figure \(\PageIndex{1}\).
The 'bathtub curve' hazard function (blue, upper solid line) is a combination of a decreasing hazard of early failure (red dotted line) and an increasing hazard of wear-out failure (yellow dotted line), plus some constant hazard of random failure (green, lower solid line).
The bathtub curve has 3 regions:[2]
- The first region has a decreasing failure rate due to early failures (a.k.a. the "Infant Mortality Phase").
- The middle region is a constant failure rate due to random failures (a.k.a. the "Useful Life Phase").
- The last region is an increasing failure rate due to wear-out failures (a.k.a. the "Wear-Out Phase").
References
- Highly accelerated life test - Wikipedia. Accessed February 19, 2026. Text is available under the Creative Commons Attribution-ShareAlike 4.0 License; additional terms may apply. By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc., a non-profit organization.
- Bathtub curve - Wikipedia. Accessed February 19, 2026.
4.4.6: Testing (HALT) is shared under a CC BY 4.0 license and was authored, remixed, and/or curated by LibreTexts.
The book could not be loaded just now.