# NASA Conducts Hot Fire of RS-25 Certification Engine

NASA conducted a full duration hot fire of an RS-25 engine April 5, continuing a key certification series to support future Space Launch System (SLS) missions to the Moon and beyond. Operators at the Fred Haise Test Stand at NASA’s Stennis Space Center near Bay St. Louis, Mississippi, fired an RS-25 certification engine for about eight-and-a-half minutes (500 seconds). The test duration mirrors the amount of time engines must fire to help launch SLS to orbit. The test represents the fifth hot fire in a 12-test series designed to certify production of new RS-25 engines for future Artemis missions by lead contractor Aerojet Rocketdyne. Four RS-25 engines fire simultaneously, producing up to 2 million pounds of combined thrust, to help power each SLS launch.

- Kind: Film
- Year: 2023
- By: NASA Stennis Space Center
- Genres: Science, Space
- Archive: [NASA Image and Video Library](https://images.nasa.gov/details/SSC_2023-04-05_RS-25_Engine_Test)
- Licence or status: [NASA media guidelines](https://www.nasa.gov/nasa-brand-center/images-and-media/) (as the archive states it)
- Credit: NASA Stennis Space Center
- Who can watch: Tweens profiles and older (the archive gives no rating; placed by Invisible Network from its collection and subjects)

[Watch now](https://invisiblenetwork.ai/watch/archive/nasa/SSC_2023-04-05_RS-25_Engine_Test?play=1)
