# NASA Conducts Long Duration Hot Fire of RS-25 Certification Test

NASA conducted a long duration hot fire of an RS-25 certification engine March 21, continuing a key series of testing to support future Space Launch System (SLS) missions to deep space. Operators fired the certification engine for 10 minutes (600 seconds), longer than the 500 seconds engines must fire during an actual mission, on the Fred Haise Test Stand at NASA’s Stennis Space Center. Hot fires of longer duration and higher power level allow operators to test the limits of engine performance and provide a margin of safety for flight operations. This hot fire was the fourth test in a series to certify production of new RS-25 engines for Artemis missions by lead contractor Aerojet Rocketdyne.

- Kind: Film
- Year: 2023
- By: NASA Stennis Space Center
- Genres: Science, Space
- Archive: [NASA Image and Video Library](https://images.nasa.gov/details/SSC_2023-03-21_RS-25_Engine_Test)
- Licence or status: [NASA media guidelines](https://www.nasa.gov/nasa-brand-center/images-and-media/) (as the archive states it)
- Credit: NASA Stennis Space Center
- Who can watch: Tweens profiles and older (the archive gives no rating; placed by Invisible Network from its collection and subjects)

[Watch now](https://invisiblenetwork.ai/watch/archive/nasa/SSC_2023-03-21_RS-25_Engine_Test?play=1)
