# Green Run 2 Test - Complete Broadcast

Engineers powered up all of the Artemis I core stage systems, load more than 700,000 gallons of supercold propellant into the tanks, and fire the rocket’s four RS-25 engines at the same time to simulate the stage’s operation during the launch of our first Artemis mission to the Moon.

- Kind: Film
- Year: 2021
- By: NASA Stennis Space Center
- Genres: Science, Space
- Archive: [NASA Image and Video Library](https://images.nasa.gov/details/SSC_2021_0318_GreenRun2_CompleteBroadcast)
- Licence or status: [NASA media guidelines](https://www.nasa.gov/nasa-brand-center/images-and-media/) (as the archive states it)
- Credit: NASA Stennis Space Center
- Who can watch: Tweens profiles and older (the archive gives no rating; placed by Invisible Network from its collection and subjects)

[Watch now](https://invisiblenetwork.ai/watch/archive/nasa/SSC_2021_0318_GreenRun2_CompleteBroadcast?play=1)
