# Artemis IV Liquid Oxygen Tank Moves to Next Phase of Production

Teams at NASA’s Michoud Assembly Facility in New Orleans use a heavy-lift mobile transport apparatus to move a 51-foot-tall liquid oxygen tank out of the vertical assembly building and into the main rocket factory on June 11. The liquid oxygen tank will form part of the SLS (Space Launch System) rocket for NASA’s Artemis IV mission to the Moon. Next, technicians with Boeing, SLS core stage prime contractor, and NASA will perform dimensional inspections and install internal baffles on the propellant tank before the next phase of production.

- Kind: Film
- Year: 2026
- By: NASA
- Genres: Science, Space
- Archive: [NASA Image and Video Library](https://images.nasa.gov/details/MAF_CS4_LOX_BLDG110_to_Area6)
- Licence or status: [NASA media guidelines](https://www.nasa.gov/nasa-brand-center/images-and-media/) (as the archive states it)
- Credit: NASA
- Who can watch: Tweens profiles and older (the archive gives no rating; placed by Invisible Network from its collection and subjects)

[Watch now](https://invisiblenetwork.ai/watch/archive/nasa/MAF_CS4_LOX_BLDG110_to_Area6?play=1)
