# Core Stage 3 & 4 Production at MAF

Teams at NASA’s Michoud Assembly Facility in New Orleans lift liquid oxygen (LOX) tank for Core Stage 3 and the liquid hydrogen (LH2) tank for Core Stage 4 in this timelapse video. The first segment displays the removal of the LH2 tank from the Vertical Assembly Center (VAC) before it is set down into production Cell A on November 14. The video following shows a liquid oxygen tank lifted from a horizontal to a vertical position and placed into production Cell A on July 12. Both tanks will be used on the core stages of NASA’s SLS (Space Launch System) rocket for its Artemis mission.

- Kind: Film
- Year: 2025
- By: NASA
- Genres: Science, Space
- Archive: [NASA Image and Video Library](https://images.nasa.gov/details/MAF_2025_CS3_CS4_Production)
- Licence or status: [NASA media guidelines](https://www.nasa.gov/nasa-brand-center/images-and-media/) (as the archive states it)
- Credit: NASA
- Who can watch: Tweens profiles and older (the archive gives no rating; placed by Invisible Network from its collection and subjects)

[Watch now](https://invisiblenetwork.ai/watch/archive/nasa/MAF_2025_CS3_CS4_Production?play=1)
