# Fit to be Tied: Retrofitting PCC Pavement with Dowel Bars

Washington State Department of Transportation Video VH-393A Fit to be Tied: Retrofitting PCC Pavement with Dowel Bars This video demonstrates dowel-bar retrofit and pavement grinding to provide load transfer and eliminate faults between pavement slabs. Criteria are given for bar type, spacing, position, and allowance for concrete expansion and contraction. Dowel installation is shown in some detail. The Washington project is the first large-scale retrofit project and preliminary results indicate success and life cycle cost effectiveness.

- Kind: Educational
- By: Washington State Department of Transportation
- Genres: Education
- Archive: [Internet Archive](https://archive.org/details/gov.fhwa.ttp.vh-393a)
- Licence or status: [CC0 1.0](http://creativecommons.org/publicdomain/zero/1.0/) (as the archive states it)
- Who can watch: Tweens profiles and older (the archive gives no rating; placed by Invisible Network from its collection and subjects)

Not offered: its uploader or archive marks it public domain, and nothing the site holds bears that out (its record gives no year, or a year from 1978 on, which no US term has left), so where it is free is not known. Unclear is not offered.
