# Asphalt Overlays: The Four P's

Minnesota Local Roads Research Board Video VH-366 Asphalt Overlays: The Four P's Following a brief introduction to pavement evaluation technology and pavement management, four phases of the asphalt overlay process are presented: Planning for functional and structural overlays; Preparation of the roadway, including drainage, patching, milling and utility considerations; Production, which includes mix design and testing of asphalt mixing plants; and Placement responsibilities, including traffic control, tack coat application, coordination of haul trucks, application of the overlay, rolling, and use of mobile test labs. The video ends with an emphasis on controlling cost with proper maintenance scheduling.

- Kind: Educational
- Year: 1996
- By: Minnesota Local Roads Research Board
- Genres: Education
- Archive: [Internet Archive](https://archive.org/details/gov.fhwa.ttp.vh-366)
- Licence or status: [CC0 1.0](http://creativecommons.org/publicdomain/zero/1.0/) (as the archive states it)
- Who can watch: Tweens profiles and older (the archive gives no rating; placed by Invisible Network from its collection and subjects)

Not offered: its uploader or archive marks it public domain, and nothing the site holds bears that out (its record gives no year, or a year from 1978 on, which no US term has left), so where it is free is not known. Unclear is not offered.
