# Utility Cuts in Paved Roads (Part 2)

Federal Highway Administration Video VH-363 Utility Cuts in Paved Roads (Part 2) Part 1 introduces the problems created by utility cuts. Project management is addressed in a review of interagency utility coordination and control, locating existing underground utilities, and traffic control. Part 2 continues with utility cut work methods: pavement cutting, excavation, backfilling, surface restoration, and site clean-up.

- Kind: Educational
- By: Federal Highway Administration
- Genres: Education
- Archive: [Internet Archive](https://archive.org/details/gov.fhwa.ttp.vh-363.2)
- Licence or status: [CC0 1.0](http://creativecommons.org/publicdomain/zero/1.0/) (as the archive states it)
- Who can watch: Tweens profiles and older (the archive gives no rating; placed by Invisible Network from its collection and subjects)

Not offered: its uploader or archive marks it public domain, and nothing the site holds bears that out (its record gives no year, or a year from 1978 on, which no US term has left), so where it is free is not known. Unclear is not offered.
