# Early Opening of Full-Depth Concrete Repairs

Federal Highway Administration Video VH-280 Early Opening of Full-Depth Concrete Repairs Fast-track full-depth concrete pavement repairs are introduced. Major considerations are discussed: planning to assess the need for fast-track construction and the production rates for each maintenance activity; scheduling tasks to prevent bottlenecks; and evaluating the strength characteristics of the placed concrete to determine the highway opening time. Methods of full-depth repair and onsite concrete quality control are shown briefly. SHRP tape no.32.

- Kind: Educational
- Year: 1994
- By: Federal Highway Administration
- Genres: Education
- Archive: [Internet Archive](https://archive.org/details/gov.dot.fhwa.ttp.vh-280)
- Licence or status: [CC0 1.0](http://creativecommons.org/publicdomain/zero/1.0/) (as the archive states it)
- Who can watch: Tweens profiles and older (the archive gives no rating; placed by Invisible Network from its collection and subjects)

Not offered: its uploader or archive marks it public domain, and nothing the site holds bears that out (its record gives no year, or a year from 1978 on, which no US term has left), so where it is free is not known. Unclear is not offered.
