# Base Repair

Utah Department of Transportation Video VH-237I Base Repair Methods of correcting base failure are demonstrated. Each step of the procedure is shown: removing damaged pavement, determining the cause of the failure and the appropriate solution, placing and compacting base material, and placing and compacting bituminous mix. Corrective action may involve installing an underground drain, unplugging culverts, or establishing better shoulder and surface drainage; the emphasis is on looking for sources of water damage.

- Kind: Educational
- By: Utah Department of Transportation
- Genres: Education
- Archive: [Internet Archive](https://archive.org/details/gov.dot.fhwa.ttp.vh-237i)
- Licence or status: [CC0 1.0](http://creativecommons.org/publicdomain/zero/1.0/) (as the archive states it)
- Who can watch: Tweens profiles and older (the archive gives no rating; placed by Invisible Network from its collection and subjects)

Not offered: its uploader or archive marks it public domain, and nothing the site holds bears that out (its record gives no year, or a year from 1978 on, which no US term has left), so where it is free is not known. Unclear is not offered.
