# Surface Placement

Washington State Department of Transportation Video VH-161 Surface Placement This video demonstrates the inspection procedures, personnel, equipment and paperwork requirements in Washington State for construction of an aggregate base course. The tape first covers the inspector's responsibilities before base course construction begins: organization and management of the inspection process, inspection and acceptance of materials, project layout, surveying, contractor's equipment, subgrade slope and condition, and traffic control. Methods used for placing gravel base, ballast and crushed surfacing are described, and the inspector's responsibilities are spelled out for each stage of construction. Finally, the inspector's post-production responsibilities are described.

- Kind: Educational
- By: Washington State Department of Transportation
- Genres: Education
- Archive: [Internet Archive](https://archive.org/details/gov.dot.fhwa.ttp.vh-161)
- Licence or status: [CC0 1.0](http://creativecommons.org/publicdomain/zero/1.0/) (as the archive states it)
- Who can watch: Tweens profiles and older (the archive gives no rating; placed by Invisible Network from its collection and subjects)

Not offered: its uploader or archive marks it public domain, and nothing the site holds bears that out (its record gives no year, or a year from 1978 on, which no US term has left), so where it is free is not known. Unclear is not offered.
