# File Cap Replacement

Oregon Department of Transportation Video VH-121 File Cap Replacement This video demonstrates the replacement of a timber pile cap under a concrete deck, wood stringer bridge on wood piling. An actual project was taped. Damage to the original timber structure is explained, and the replacement process is shown: setting and hanging the needle beam staging and deck area for the work crew, placing pile clamps, rolling a false cap into place, and jacking the bridge deck, with commentary by maintenance supervisors. Workmen under the bridge coordinate with a crane operator on the bridge deck to remove the old pile cap and install the new one.

- Kind: Educational
- Year: 1989
- By: Oregon Department of Transportation
- Genres: Education
- Archive: [Internet Archive](https://archive.org/details/gov.dot.fhwa.ttp.vh-121)
- Licence or status: [CC0 1.0](http://creativecommons.org/publicdomain/zero/1.0/) (as the archive states it)
- Who can watch: Tweens profiles and older (the archive gives no rating; placed by Invisible Network from its collection and subjects)

Not offered: its uploader or archive marks it public domain, and nothing the site holds bears that out (its record gives no year, or a year from 1978 on, which no US term has left), so where it is free is not known. Unclear is not offered.
