# Graves Avenue Prefabricated Bridge Project

Federal Highway Administration Graves Avenue Prefabricated Bridge Project Widening of I-4 from four to six lanes the old Graves Avenue Bridge had to go. Officials from the Florida DOT had seen an innovative bridge building technique in use overseas. There, crews used self-propelled modular transporters or s-p-m-ts to lift old bridges out of the way and then replace them with pre-constructed bridge spans in a short amount of time. The Graves Avenue project is the first time s-p-m-ts have been used in the construction of a bridge over an interstate highway in the United States.

- Kind: Educational
- By: Federal Highway Administration
- Genres: Education
- Archive: [Internet Archive](https://archive.org/details/gov.dot.fhwa.pbes.gravesave)
- Licence or status: [CC0 1.0](http://creativecommons.org/publicdomain/zero/1.0/) (as the archive states it)
- Who can watch: Tweens profiles and older (the archive gives no rating; placed by Invisible Network from its collection and subjects)

Not offered: its uploader or archive marks it public domain, and nothing the site holds bears that out (its record gives no year, or a year from 1978 on, which no US term has left), so where it is free is not known. Unclear is not offered.
