# AFQTP - BACKHOE OPERATIONS - EXCAVATE, LOAD, AND BACKFILL MATERIAL

Department of Defense PIN 613955 AFQTP - BACKHOE OPERATIONS - EXCAVATE, LOAD, AND BACKFILL MATERIAL 2001 PROGRAM COVERS THE PROCEDURES TO OPERATE A WHEEL MOUNTED BACKHOE TO ACCOMPLISH THE TASKS OF EXCAVATING, LOADING, AND BACKFILLING MATERIAL. DISCUSSES HOW TO EXCAVATE AND LOAD MATERIAL WITH THE REAR BACKHOE BUCKET, AND HIGHLIGHTS THE BACKFILL PROCEDURES WITH THE FRONT MOUNTED BUCKET. EXPLAINS AF FORM 103, BASE CIVIL ENGINEERING WORK CLEARANCE REQUEST, AS IT APPLIES TO EXCAVATING WITH THE BACKHOE..

- Kind: Educational
- Year: 2001
- By: Department of Defense
- Genres: Education
- Archive: [Internet Archive](https://archive.org/details/gov.dod.dimoc.613955)
- Licence or status: [CC0 1.0](http://creativecommons.org/publicdomain/zero/1.0/) (as the archive states it)
- Who can watch: Tweens profiles and older (the archive gives no rating; placed by Invisible Network from its collection and subjects)

[Watch now](https://invisiblenetwork.ai/watch/archive/ia/gov.dod.dimoc.613955?play=1)
