# \[PRECISION BUILT LINCOLN. PART 4\]

\[PRECISION BUILT LINCOLN. PART 4\] Produced: 1928 Description The original catalog description provided by the Ford Motor Company reads as follows: “The Silent Room.” Gears placed on machine, lubricated, test run, measured, inspected - wheel assembly, wire spokes to rims, welded, riveted, burnished, rim assembly to brake housing, welded, riveted, tested, measured - spring testing machine - polishing frame pieces - frame assembly, riveting - final assembly, engine drop, brake assembly, brake action tested, wiring installed - worm gear tested - steering mechanism assembled, tested. \[1928\] https://catalog.archives.gov/id/93284

- Kind: Educational
- Year: 1928
- By: National Archives
- Genres: Education
- Archive: [Internet Archive](https://archive.org/details/fc-fc-4167)
- Licence or status: none stated by the archive
- Who can watch: Tweens profiles and older (the archive gives no rating; placed by Invisible Network from its collection and subjects)

[Watch now](https://invisiblenetwork.ai/watch/archive/ia/fc-fc-4167?play=1)
