# Closure Volkerak

In the Waterloopkundig Laboratorium De Voorst in Marknesse research is done to the closure of the Volkerak on a scale model of this area, a.o. to the flow velocities and the closure with the closing caisson. The twelve culvert caissons are waiting to be sunk in the construction pit at the Volkerak.

- Kind: Film
- By: Polygoon-Profilti (producent)
- Archive: [Europeana](https://www.europeana.eu/item/2051906/data_euscreenXL_https___www_openbeelden_nl_media_659817)
- Licence or status: [CC BY-SA 4.0](http://creativecommons.org/licenses/by-sa/4.0/) (as the archive states it)
- Credit: Netherlands Institute for Sound & Vision
- Who can watch: Teens profiles and older (the archive gives no rating; placed by Invisible Network from its collection and subjects)

[Watch now](https://invisiblenetwork.ai/watch/archive/europeana/2051906~data_euscreenXL_https___www_openbeelden_nl_media_659817?play=1)
