# Charis Construction Update: Joy Dorm Is Being Insulated And Prepared For Stucco

An episode of [Andrew Wommack Recorded Live](https://invisiblenetwork.ai/podcast/293048670), 2 Oct 2026, 7:53.

Audio: https://api.spreaker.com/download/episode/75528749/spreaker_2c74526c_25da_4cfd_8c88_d015d766195e.mp3

Construction on the third dorm is ramping up, with exterior lath and interior electrical, plumbing, and fire protection systems nearing completion. With insulation and drywall on the horizon, the team is working toward substantial completion by early summer while the existing dorms continue to foster community and discipleship among students.

Shows are listed from Apple Podcasts' charts and directory, and Podcast Index where it is used. Every show and episode belongs to its publisher and plays from the publisher's own feed; this site hosts none of them.
