# WR at GSI and FAIR: Status Report

- Institution: CERN
- Speaker: Dietrich Beck
- Year: 2026
- Language: English
- Source: [CERN](https://videos.cern.ch/record/3025795)
- Licence: [CERN](https://copyright.web.cern)
- Who can watch: Teens profiles and older (sources give no ratings; placed by Invisible Network from the source's own words)

WR at GSI and FAIR: Status Report

At GSI, the White Rabbit based General Machine Timing (GMT) System is in productive use since 2022 and includes more than 70 White Rabbit switches and about 500 nodes.

As the first FAIR buildings of the upcoming FAIR facility are complete, installation of White Rabbit equipment on the FAIR site has started.

This presentation gives a short introduction and status report.

00:00:00 Slide 1

00:00:31 Slide 2

00:00:52 Slide 3

00:01:15 Slide 4

00:01:53 Slide 5

00:03:48 Slide 6

00:04:41 Slide 7

00:05:54 Slide 8

00:06:54 Slide 9

00:07:51 Slide 10

00:08:37 Slide 11

00:09:51 Slide 12

00:10:29 Slide 13

00:10:50 Slide 14

00:11:17 Slide 15

00:11:47 Slide 16

00:12:18 Slide 17

00:12:45 Slide 18

00:13:15 Slide 19

00:14:27 Slide 20

00:14:50 Slide 21

00:15:05 Slide 22

00:16:24 Slide 23

00:16:57 Slide 24

00:17:31 Slide 25

00:17:45 Slide 26

00:18:18 Slide 27

00:18:52 Slide 28

00:19:26 Slide 29

00:20:24 Slide 30

## Lectures

1. [WR at GSI and FAIR: Status Report](https://invisiblenetwork.ai/learn/cern/3025795/39bf71e118e3), 23 min (CERN's player)
