# Last 3 years of the SC-ISOLDE and move to PS-Booster

- Institution: CERN
- Department: ISOLDE
- Speaker: Heinz HAAS
- Year: 2014
- Language: English
- Source: [CERN](https://videos.cern.ch/record/3007528)
- Licence: [CERN](http://copyright.web.cern.ch)
- Who can watch: Teens profiles and older (sources give no ratings; placed by Invisible Network from the source's own words)

In 1987 the very successful operation of ISOLDE-2 could be continued with an ever increasing number of users. The ISOLDE-3 facility was finished in 1988 and made available too, even in high-resolution mode. As it was evident that post-acceleration of the radioactive beams would be needed in the future, a first project with a series of linacs was forwarded. It had been clear, however, that CERN could not support the SC operation in the long term. An envisaged transfer to the Rutherford-Appleton Lab did not materialize, primarily for financial reasons. Fortunately the CERN management agreed to support a move to the PS-Booster and preparations started immediately following this decision. Thus in the years 1989 and 1990 a special effort was made to supply beam to as many research projects as possible, resulting in a record number of beam shifts from the ISOLDE separators. The collaboration even had to partially support the last year of SC running before the final shutdown in December 1990..

0:00:00 Slide 1

0:00:55 Slide 2

0:01:07 Slide 3

0:01:17 Slide 4

0:01:23 Slide 5

0:01:51 Slide 6

0:02:24 Slide 7

0:02:46 Slide 8

0:04:54 Slide 9

0:06:36 Slide 10

0:07:43 Slide 11

0:08:48 Slide 12

0:09:52 Slide 13

0:13:18 Slide 14

0:13:53 Slide 15

0:15:01 Slide 16

0:15:33 Slide 17

0:15:37 Slide 18

0:15:50 Slide 19

0:17:05 Slide 20

0:18:03 Slide 21

## Lectures

1. [Last 3 years of the SC-ISOLDE and move to PS-Booster](https://invisiblenetwork.ai/learn/cern/3007528/32d36be63586), 19 min (CERN's player)
