# Zerlegung einer ausgebauten Stahlnietenbrücke in Leipzig Anger-Crottendorf (Dia)

- By: August Geyler
- Date: 2020-07-15
- Classification: Photograph
- Credit line: Own work, Self-scanned
- Museum: [Wikimedia Commons](https://commons.wikimedia.org/wiki/File:Zerlegung_einer_ausgebauten_Stahlnietenbr%C3%BCcke_in_Leipzig_Anger-Crottendorf_(Dia).jpg)
- Rights: [CC BY-SA 4.0](https://creativecommons.org/licenses/by-sa/4.0)
- Picture: https://upload.wikimedia.org/wikipedia/commons/thumb/f/f6/Zerlegung_einer_ausgebauten_Stahlnietenbr%C3%BCcke_in_Leipzig_Anger-Crottendorf_%28Dia%29.jpg/1920px-Zerlegung_einer_ausgebauten_Stahlnietenbr%C3%BCcke_in_Leipzig_Anger-Crottendorf_%28Dia%29.jpg
- Who can see it: Kids profiles and older (museums give no ratings; placed by Invisible Network from the museum's own words)

The extension of the steel superstructure of the Zweinaundorfer Straße railway crossing at the Leipziger Güterring took place by means of a mobile crane. Initially, only the superstructure of the directional track to Stötteritz was removed. Workers then began to dismantle the construction using autogenous flame cutting (oxy-fuel cutting). The scrapping lasted until the early morning hours of the following day.

